Sources and method
This site uses 1,473 official figures. Each one links to its page in the official document, and each was checked by a script that opens that page and confirms the number is printed there.
Where the numbers come from
- The 2026-27 Budget: the Budget Speech, Appendix A (Medium Range Forecast) and Appendix B (analysis of expenditure and revenue), published 25 February 2026.
- The Estimates for the year ending 31 March 2027: each head (department) of expenditure, the revenue estimates and the Capital Works Reserve Fund.
- Census and Statistics Department: Quarterly Report on the General Household Survey (Q2 2026) and the 2021 Population Census.
- Inland Revenue Department: salaries tax rates and allowances, and the statistics in its Annual Report.
- Government press release on the provisional 2025-26 outturn (30 April 2026).
How we calculate
- Your taxes
- The amount you enter × each policy area group's spending ÷ total government expenditure. The UK's Annual Tax Summary uses the same method. Tax is not earmarked, so this is an illustration, not a bill. p.12 (official document, opens in new tab)
- Rounding
- Receipt lines are rounded with the largest-remainder method so they add up exactly to the amount you entered.
- Government expenditure
- Spending from the General Revenue Account plus the Government's funds, such as the Capital Works Reserve Fund. "Public expenditure" also adds the trading funds and the Housing Authority. We use government expenditure because it matches the Budget's headline total.
- Actual, revised, estimate, forecast
- Actual is money already spent; a revised estimate is the mid-year update; an estimate is this year's plan; a forecast comes from the Medium Range Forecast. To compare this year with last, we use the 2025-26 revised estimate against the 2026-27 estimate, as the Budget does.
- Departments and policy areas
- A department (head) can serve several policy areas, so department totals cannot be added up into a policy area group.
- Our calculations
- Any number marked as our calculation (an average per household or a percentage, for example) shows the sources of the official figures it was calculated from.
How we check
Each figure records the document, the page within the PDF file (the page a browser's #page= link opens, which may differ from the printed page number), the printed page number, and a verbatim quote. The script scripts/verify_sources.py downloads each document, extracts that page's text, and confirms the number and the quote are there. It also reads amounts written in Chinese numerals, such as 七千六百五十二億元.
Some mobile browsers ignore links to a specific PDF page. If the document opens at page 1, use your PDF viewer to go to the page shown on the citation.
Download the data: figures used on this site (JSON) · revenue.json · expenditure.json · households-tax.json (all research data, including figures not shown on the site)
Every figure and its source
Grouped by document: 56 documents.
Estimates for the year ending 31 March 2027 – Volume I – General Revenue Account: Summary of Expenditure Estimates (336)
https://www.budget.gov.hk/2026/eng/pdf/sum_exp_e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Department of Health 2026-27 · Estimate |
15,707,748 | PDF p.1 printed 23 |
37 Department of Health ............................... ........... 13,668,123 15,700,879 14,560,307 15,707,748 |
| Fire Services Department 2026-27 · Estimate |
9,382,525 | PDF p.1 printed 23 |
45 Fire Services Department ......................... ...........9,401,062 9,251,993 8,993,418 9,382,525 |
| Customs and Excise Department 2026-27 · Estimate |
6,163,011 | PDF p.1 printed 23 |
31 Customs and Excise Department ............. ...........5,892,697 6,117,332 5,855,363 6,163,011 |
| Correctional Services Department 2026-27 · Estimate |
5,475,932 | PDF p.1 printed 23 |
30 Correctional Services Department ........... ...........5,403,828 5,488,495 5,407,297 5,475,932 |
| Department of Justice 2026-27 · Estimate |
2,539,090 | PDF p.1 printed 23 |
92 Department of Justice............................... ...........2,007,766 2,507,746 2,109,357 2,539,090 |
| Government Secretariat: Commerce and Economic Development Bureau 2026-27 · Estimate |
13,543,536 | PDF p.1 printed 23 |
152 Government Secretariat: Commerce and Economic Development Bureau .......... ........... 14,530,049 14,065,794 12,593,042 13,543,536 |
| Government Secretariat: Digital Policy Office 2026-27 · Estimate |
4,139,256 | PDF p.1 printed 23 |
47 Government Secretariat: Digital Policy Office ................................................... ...........3,012,828 3,494,475 3,468,688 4,139,256 |
| Food and Environmental Hygiene Department 2026-27 · Estimate |
11,114,476 | PDF p.1 printed 23 |
49 Food and Environmental Hygiene Department .......................................... ........... 11,121,517 11,226,394 10,989,155 11,114,476 |
| Environmental Protection Department 2026-27 · Estimate |
8,675,025 | PDF p.1 printed 23 |
44 Environmental Protection Department..... ...........9,095,412 8,633,114 8,186,896 8,675,025 |
| Agriculture, Fisheries and Conservation Department 2026-27 · Estimate |
2,240,691 | PDF p.1 printed 23 |
22 Agriculture, Fisheries and Conservation Department .......................................... ...........2,082,884 2,279,724 2,210,369 2,240,691 |
| Government Secretariat: Culture, Sports and Tourism Bureau 2026-27 · Estimate |
5,611,415 | PDF p.1 printed 23 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ............................ ...........5,581,627 6,100,908 5,001,591 5,611,415 |
| General Expenses of the Civil Service 2026-27 · Estimate |
5,951,078 | PDF p.1 printed 23 |
46 General Expenses of the Civil Service ..... ...........5,236,889 5,914,104 5,556,701 5,951,078 |
| Chief Executive’s Office 2026-27 · Estimate |
155,430 | PDF p.1 printed 23 |
21 Chief Executive’s Office .......................... ........... 146,831 157,089 156,451 155,430 |
| Chief Executive’s Office 2025-26 · Revised estimate |
156,451 | PDF p.1 printed 23 |
21 Chief Executive’s Office .......................... ........... 146,831 157,089 156,451 155,430 |
| Agriculture, Fisheries and Conservation Department 2025-26 · Revised estimate |
2,210,369 | PDF p.1 printed 23 |
22 Agriculture, Fisheries and Conservation Department .......................................... ...........2,082,884 2,279,724 2,210,369 2,240,691 |
| Auxiliary Medical Service 2025-26 · Revised estimate |
114,768 | PDF p.1 printed 23 |
23 Auxiliary Medical Service ....................... ........... 113,219 120,291 114,768 114,033 |
| Auxiliary Medical Service 2026-27 · Estimate |
114,033 | PDF p.1 printed 23 |
23 Auxiliary Medical Service ....................... ........... 113,219 120,291 114,768 114,033 |
| Audit Commission 2025-26 · Revised estimate |
213,143 | PDF p.1 printed 23 |
24 Audit Commission ................................... ........... 203,085 213,549 213,143 212,807 |
| Audit Commission 2026-27 · Estimate |
212,807 | PDF p.1 printed 23 |
24 Audit Commission ................................... ........... 203,085 213,549 213,143 212,807 |
| Architectural Services Department 2025-26 · Revised estimate |
2,804,876 | PDF p.1 printed 23 |
25 Architectural Services Department .......... ...........2,829,291 2,808,891 2,804,876 2,811,636 |
| Architectural Services Department 2026-27 · Estimate |
2,811,636 | PDF p.1 printed 23 |
25 Architectural Services Department .......... ...........2,829,291 2,808,891 2,804,876 2,811,636 |
| Census and Statistics Department 2025-26 · Revised estimate |
924,184 | PDF p.1 printed 23 |
26 Census and Statistics Department ............ ........... 821,629 924,832 924,184 959,965 |
| Census and Statistics Department 2026-27 · Estimate |
959,965 | PDF p.1 printed 23 |
26 Census and Statistics Department ............ ........... 821,629 924,832 924,184 959,965 |
| Civil Aid Service 2025-26 · Revised estimate |
147,862 | PDF p.1 printed 23 |
27 Civil Aid Service ...................................... ........... 153,841 154,921 147,862 138,299 |
| Civil Aid Service 2026-27 · Estimate |
138,299 | PDF p.1 printed 23 |
27 Civil Aid Service ...................................... ........... 153,841 154,921 147,862 138,299 |
| Civil Aviation Department 2025-26 · Revised estimate |
1,455,000 | PDF p.1 printed 23 |
28 Civil Aviation Department ....................... ...........1,425,939 1,475,764 1,455,000 1,468,822 |
| Civil Aviation Department 2026-27 · Estimate |
1,468,822 | PDF p.1 printed 23 |
28 Civil Aviation Department ....................... ...........1,425,939 1,475,764 1,455,000 1,468,822 |
| Correctional Services Department 2025-26 · Revised estimate |
5,407,297 | PDF p.1 printed 23 |
30 Correctional Services Department ........... ...........5,403,828 5,488,495 5,407,297 5,475,932 |
| Customs and Excise Department 2025-26 · Revised estimate |
5,855,363 | PDF p.1 printed 23 |
31 Customs and Excise Department ............. ...........5,892,697 6,117,332 5,855,363 6,163,011 |
| Civil Engineering and Development Department 2025-26 · Revised estimate |
3,910,583 | PDF p.1 printed 23 |
33 Civil Engineering and Development Department .......................................... ...........3,506,272 4,119,132 3,910,583 4,190,129 |
| Civil Engineering and Development Department 2026-27 · Estimate |
4,190,129 | PDF p.1 printed 23 |
33 Civil Engineering and Development Department .......................................... ...........3,506,272 4,119,132 3,910,583 4,190,129 |
| Department of Health 2025-26 · Revised estimate |
14,560,307 | PDF p.1 printed 23 |
37 Department of Health ............................... ........... 13,668,123 15,700,879 14,560,307 15,707,748 |
| Drainage Services Department 2025-26 · Revised estimate |
3,940,587 | PDF p.1 printed 23 |
39 Drainage Services Department................. ...........3,662,307 3,991,604 3,940,587 4,065,313 |
| Drainage Services Department 2026-27 · Estimate |
4,065,313 | PDF p.1 printed 23 |
39 Drainage Services Department................. ...........3,662,307 3,991,604 3,940,587 4,065,313 |
| Electrical and Mechanical Services Department 2025-26 · Revised estimate |
1,816,365 | PDF p.1 printed 23 |
42 Electrical and Mechanical Services Department .......................................... ...........1,866,264 1,851,166 1,816,365 1,419,964 |
| Electrical and Mechanical Services Department 2026-27 · Estimate |
1,419,964 | PDF p.1 printed 23 |
42 Electrical and Mechanical Services Department .......................................... ...........1,866,264 1,851,166 1,816,365 1,419,964 |
| Environmental Protection Department 2025-26 · Revised estimate |
8,186,896 | PDF p.1 printed 23 |
44 Environmental Protection Department..... ...........9,095,412 8,633,114 8,186,896 8,675,025 |
| Fire Services Department 2025-26 · Revised estimate |
8,993,418 | PDF p.1 printed 23 |
45 Fire Services Department ......................... ...........9,401,062 9,251,993 8,993,418 9,382,525 |
| General Expenses of the Civil Service 2025-26 · Revised estimate |
5,556,701 | PDF p.1 printed 23 |
46 General Expenses of the Civil Service ..... ...........5,236,889 5,914,104 5,556,701 5,951,078 |
| Government Secretariat: Digital Policy Office 2025-26 · Revised estimate |
3,468,688 | PDF p.1 printed 23 |
47 Government Secretariat: Digital Policy Office ................................................... ...........3,012,828 3,494,475 3,468,688 4,139,256 |
| Government Laboratory 2025-26 · Revised estimate |
639,244 | PDF p.1 printed 23 |
48 Government Laboratory ........................... ........... 631,008 640,768 639,244 658,042 |
| Government Laboratory 2026-27 · Estimate |
658,042 | PDF p.1 printed 23 |
48 Government Laboratory ........................... ........... 631,008 640,768 639,244 658,042 |
| Food and Environmental Hygiene Department 2025-26 · Revised estimate |
10,989,155 | PDF p.1 printed 23 |
49 Food and Environmental Hygiene Department .......................................... ........... 11,121,517 11,226,394 10,989,155 11,114,476 |
| Government Property Agency 2025-26 · Revised estimate |
2,712,868 | PDF p.1 printed 23 |
51 Government Property Agency ................. ...........2,633,106 2,900,778 2,712,868 3,234,596 |
| Government Property Agency 2026-27 · Estimate |
3,234,596 | PDF p.1 printed 23 |
51 Government Property Agency ................. ...........2,633,106 2,900,778 2,712,868 3,234,596 |
| Government Logistics Department 2025-26 · Revised estimate |
751,463 | PDF p.1 printed 23 |
59 Government Logistics Department .......... ........... 678,375 744,863 751,463 649,233 |
| Government Logistics Department 2026-27 · Estimate |
649,233 | PDF p.1 printed 23 |
59 Government Logistics Department .......... ........... 678,375 744,863 751,463 649,233 |
| Buildings Department 2025-26 · Revised estimate |
2,099,671 | PDF p.1 printed 23 |
82 Buildings Department .............................. ...........2,128,139 2,104,424 2,099,671 2,091,095 |
| Buildings Department 2026-27 · Estimate |
2,091,095 | PDF p.1 printed 23 |
82 Buildings Department .............................. ...........2,128,139 2,104,424 2,099,671 2,091,095 |
| Department of Justice 2025-26 · Revised estimate |
2,109,357 | PDF p.1 printed 23 |
92 Department of Justice............................... ...........2,007,766 2,507,746 2,109,357 2,539,090 |
| Government Secretariat: Culture, Sports and Tourism Bureau 2025-26 · Revised estimate |
5,001,591 | PDF p.1 printed 23 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ............................ ...........5,581,627 6,100,908 5,001,591 5,611,415 |
| Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2025-26 · Revised estimate |
1,980,777 | PDF p.1 printed 23 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) ................................................ ...........2,172,776 2,079,954 1,980,777 629,957 |
| Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2026-27 · Estimate |
629,957 | PDF p.1 printed 23 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) ................................................ ...........2,172,776 2,079,954 1,980,777 629,957 |
| Government Secretariat: Development Bureau (Planning and Lands Branch) 2025-26 · Revised estimate |
1,381,910 | PDF p.1 printed 23 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch).. ...........1,538,150 1,674,443 1,381,910 1,504,918 |
| Government Secretariat: Development Bureau (Planning and Lands Branch) 2026-27 · Estimate |
1,504,918 | PDF p.1 printed 23 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch).. ...........1,538,150 1,674,443 1,381,910 1,504,918 |
| Government Secretariat: Civil Service Bureau 2025-26 · Revised estimate |
891,181 | PDF p.1 printed 23 |
143 Government Secretariat: Civil Service Bureau.................................................. ........... 833,991 987,857 891,181 928,735 |
| Government Secretariat: Civil Service Bureau 2026-27 · Estimate |
928,735 | PDF p.1 printed 23 |
143 Government Secretariat: Civil Service Bureau.................................................. ........... 833,991 987,857 891,181 928,735 |
| Government Secretariat: Constitutional and Mainland Affairs Bureau 2025-26 · Revised estimate |
867,490 | PDF p.1 printed 23 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau .............. ........... 837,134 882,137 867,490 876,677 |
| Government Secretariat: Constitutional and Mainland Affairs Bureau 2026-27 · Estimate |
876,677 | PDF p.1 printed 23 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau .............. ........... 837,134 882,137 867,490 876,677 |
| Government Secretariat: Commerce and Economic Development Bureau 2025-26 · Revised estimate |
12,593,042 | PDF p.1 printed 23 |
152 Government Secretariat: Commerce and Economic Development Bureau .......... ........... 14,530,049 14,065,794 12,593,042 13,543,536 |
| Government Secretariat: Education Bureau 2025-26 · Revised estimate |
75,746,577 | PDF p.1 printed 23 |
156 Government Secretariat: Education Bureau.................................................. ...........79,162,642 75,834,241 75,746,577 74,979,634 |
| Government Secretariat: Education Bureau 2026-27 · Estimate |
74,979,634 | PDF p.1 printed 23 |
156 Government Secretariat: Education Bureau.................................................. ...........79,162,642 75,834,241 75,746,577 74,979,634 |
| Government Secretariat: Development Bureau (Works Branch) 2025-26 · Revised estimate |
1,335,668 | PDF p.1 printed 23 |
159 Government Secretariat: Development Bureau (Works Branch) ....................... ...........1,189,271 1,449,775 1,335,668 1,545,976 |
| Government Secretariat: Development Bureau (Works Branch) 2026-27 · Estimate |
1,545,976 | PDF p.1 printed 23 |
159 Government Secretariat: Development Bureau (Works Branch) ....................... ...........1,189,271 1,449,775 1,335,668 1,545,976 |
| Government Flying Service 2025-26 · Revised estimate |
616,633 | PDF p.1 printed 23 |
166 Government Flying Service ..................... ........... 618,745 626,572 616,633 619,060 |
| Government Flying Service 2026-27 · Estimate |
619,060 | PDF p.1 printed 23 |
166 Government Flying Service ..................... ........... 618,745 626,572 616,633 619,060 |
| Department of Health 2025-26 · Estimate |
15,700,879 | PDF p.1 printed 23 |
37 Department of Health ............................... ........... 13,668,123 15,700,879 14,560,307 15,707,748 |
| Government Secretariat: Commerce and Economic Development Bureau 2025-26 · Estimate |
14,065,794 | PDF p.1 printed 23 |
152 Government Secretariat: Commerce and Economic Development Bureau .......... ........... 14,530,049 14,065,794 12,593,042 13,543,536 |
| Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2025-26 · Estimate |
2,079,954 | PDF p.1 printed 23 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) ................................................ ...........2,172,776 2,079,954 1,980,777 629,957 |
| Government Secretariat: Education Bureau 2025-26 · Estimate |
75,834,241 | PDF p.1 printed 23 |
156 Government Secretariat: Education Bureau.................................................. ...........79,162,642 75,834,241 75,746,577 74,979,634 |
| Electrical and Mechanical Services Department 2025-26 · Estimate |
1,851,166 | PDF p.1 printed 23 |
42 Electrical and Mechanical Services Department .......................................... ...........1,866,264 1,851,166 1,816,365 1,419,964 |
| Government Logistics Department 2025-26 · Estimate |
744,863 | PDF p.1 printed 23 |
59 Government Logistics Department .......... ........... 678,375 744,863 751,463 649,233 |
| Chief Executive’s Office 2024-25 · Actual |
146,831 | PDF p.1 printed 23 |
21 Chief Executive’s Office .......................... ........... 146,831 157,089 156,451 155,430 |
| Agriculture, Fisheries and Conservation Department 2024-25 · Actual |
2,082,884 | PDF p.1 printed 23 |
22 Agriculture, Fisheries and Conservation Department .......................................... ...........2,082,884 2,279,724 2,210,369 2,240,691 |
| Auxiliary Medical Service 2024-25 · Actual |
113,219 | PDF p.1 printed 23 |
23 Auxiliary Medical Service ....................... ........... 113,219 120,291 114,768 114,033 |
| Audit Commission 2024-25 · Actual |
203,085 | PDF p.1 printed 23 |
24 Audit Commission ................................... ........... 203,085 213,549 213,143 212,807 |
| Architectural Services Department 2024-25 · Actual |
2,829,291 | PDF p.1 printed 23 |
25 Architectural Services Department .......... ...........2,829,291 2,808,891 2,804,876 2,811,636 |
| Census and Statistics Department 2024-25 · Actual |
821,629 | PDF p.1 printed 23 |
26 Census and Statistics Department ............ ........... 821,629 924,832 924,184 959,965 |
| Civil Aid Service 2024-25 · Actual |
153,841 | PDF p.1 printed 23 |
27 Civil Aid Service ...................................... ........... 153,841 154,921 147,862 138,299 |
| Civil Aviation Department 2024-25 · Actual |
1,425,939 | PDF p.1 printed 23 |
28 Civil Aviation Department ....................... ...........1,425,939 1,475,764 1,455,000 1,468,822 |
| Correctional Services Department 2024-25 · Actual |
5,403,828 | PDF p.1 printed 23 |
30 Correctional Services Department ........... ...........5,403,828 5,488,495 5,407,297 5,475,932 |
| Customs and Excise Department 2024-25 · Actual |
5,892,697 | PDF p.1 printed 23 |
31 Customs and Excise Department ............. ...........5,892,697 6,117,332 5,855,363 6,163,011 |
| Civil Engineering and Development Department 2024-25 · Actual |
3,506,272 | PDF p.1 printed 23 |
33 Civil Engineering and Development Department .......................................... ...........3,506,272 4,119,132 3,910,583 4,190,129 |
| Department of Health 2024-25 · Actual |
13,668,123 | PDF p.1 printed 23 |
37 Department of Health ............................... ........... 13,668,123 15,700,879 14,560,307 15,707,748 |
| Drainage Services Department 2024-25 · Actual |
3,662,307 | PDF p.1 printed 23 |
39 Drainage Services Department................. ...........3,662,307 3,991,604 3,940,587 4,065,313 |
| Electrical and Mechanical Services Department 2024-25 · Actual |
1,866,264 | PDF p.1 printed 23 |
42 Electrical and Mechanical Services Department .......................................... ...........1,866,264 1,851,166 1,816,365 1,419,964 |
| Environmental Protection Department 2024-25 · Actual |
9,095,412 | PDF p.1 printed 23 |
44 Environmental Protection Department..... ...........9,095,412 8,633,114 8,186,896 8,675,025 |
| Fire Services Department 2024-25 · Actual |
9,401,062 | PDF p.1 printed 23 |
45 Fire Services Department ......................... ...........9,401,062 9,251,993 8,993,418 9,382,525 |
| General Expenses of the Civil Service 2024-25 · Actual |
5,236,889 | PDF p.1 printed 23 |
46 General Expenses of the Civil Service ..... ...........5,236,889 5,914,104 5,556,701 5,951,078 |
| Government Secretariat: Digital Policy Office 2024-25 · Actual |
3,012,828 | PDF p.1 printed 23 |
47 Government Secretariat: Digital Policy Office ................................................... ...........3,012,828 3,494,475 3,468,688 4,139,256 |
| Government Laboratory 2024-25 · Actual |
631,008 | PDF p.1 printed 23 |
48 Government Laboratory ........................... ........... 631,008 640,768 639,244 658,042 |
| Food and Environmental Hygiene Department 2024-25 · Actual |
11,121,517 | PDF p.1 printed 23 |
49 Food and Environmental Hygiene Department .......................................... ........... 11,121,517 11,226,394 10,989,155 11,114,476 |
| Government Property Agency 2024-25 · Actual |
2,633,106 | PDF p.1 printed 23 |
51 Government Property Agency ................. ...........2,633,106 2,900,778 2,712,868 3,234,596 |
| Government Logistics Department 2024-25 · Actual |
678,375 | PDF p.1 printed 23 |
59 Government Logistics Department .......... ........... 678,375 744,863 751,463 649,233 |
| Buildings Department 2024-25 · Actual |
2,128,139 | PDF p.1 printed 23 |
82 Buildings Department .............................. ...........2,128,139 2,104,424 2,099,671 2,091,095 |
| Department of Justice 2024-25 · Actual |
2,007,766 | PDF p.1 printed 23 |
92 Department of Justice............................... ...........2,007,766 2,507,746 2,109,357 2,539,090 |
| Government Secretariat: Culture, Sports and Tourism Bureau 2024-25 · Actual |
5,581,627 | PDF p.1 printed 23 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ............................ ...........5,581,627 6,100,908 5,001,591 5,611,415 |
| Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2024-25 · Actual |
2,172,776 | PDF p.1 printed 23 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) ................................................ ...........2,172,776 2,079,954 1,980,777 629,957 |
| Government Secretariat: Development Bureau (Planning and Lands Branch) 2024-25 · Actual |
1,538,150 | PDF p.1 printed 23 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch).. ...........1,538,150 1,674,443 1,381,910 1,504,918 |
| Government Secretariat: Civil Service Bureau 2024-25 · Actual |
833,991 | PDF p.1 printed 23 |
143 Government Secretariat: Civil Service Bureau.................................................. ........... 833,991 987,857 891,181 928,735 |
| Government Secretariat: Constitutional and Mainland Affairs Bureau 2024-25 · Actual |
837,134 | PDF p.1 printed 23 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau .............. ........... 837,134 882,137 867,490 876,677 |
| Government Secretariat: Commerce and Economic Development Bureau 2024-25 · Actual |
14,530,049 | PDF p.1 printed 23 |
152 Government Secretariat: Commerce and Economic Development Bureau .......... ........... 14,530,049 14,065,794 12,593,042 13,543,536 |
| Government Secretariat: Education Bureau 2024-25 · Actual |
79,162,642 | PDF p.1 printed 23 |
156 Government Secretariat: Education Bureau.................................................. ...........79,162,642 75,834,241 75,746,577 74,979,634 |
| Government Secretariat: Development Bureau (Works Branch) 2024-25 · Actual |
1,189,271 | PDF p.1 printed 23 |
159 Government Secretariat: Development Bureau (Works Branch) ....................... ...........1,189,271 1,449,775 1,335,668 1,545,976 |
| Government Flying Service 2024-25 · Actual |
618,745 | PDF p.1 printed 23 |
166 Government Flying Service ..................... ........... 618,745 626,572 616,633 619,060 |
| Chief Executive’s Office 2025-26 · Estimate |
157,089 | PDF p.1 printed 23 |
21 Chief Executive’s Office .......................... ........... 146,831 157,089 156,451 155,430 |
| Agriculture, Fisheries and Conservation Department 2025-26 · Estimate |
2,279,724 | PDF p.1 printed 23 |
22 Agriculture, Fisheries and Conservation Department .......................................... ...........2,082,884 2,279,724 2,210,369 2,240,691 |
| Auxiliary Medical Service 2025-26 · Estimate |
120,291 | PDF p.1 printed 23 |
23 Auxiliary Medical Service ....................... ........... 113,219 120,291 114,768 114,033 |
| Audit Commission 2025-26 · Estimate |
213,549 | PDF p.1 printed 23 |
24 Audit Commission ................................... ........... 203,085 213,549 213,143 212,807 |
| Architectural Services Department 2025-26 · Estimate |
2,808,891 | PDF p.1 printed 23 |
25 Architectural Services Department .......... ...........2,829,291 2,808,891 2,804,876 2,811,636 |
| Census and Statistics Department 2025-26 · Estimate |
924,832 | PDF p.1 printed 23 |
26 Census and Statistics Department ............ ........... 821,629 924,832 924,184 959,965 |
| Civil Aid Service 2025-26 · Estimate |
154,921 | PDF p.1 printed 23 |
27 Civil Aid Service ...................................... ........... 153,841 154,921 147,862 138,299 |
| Civil Aviation Department 2025-26 · Estimate |
1,475,764 | PDF p.1 printed 23 |
28 Civil Aviation Department ....................... ...........1,425,939 1,475,764 1,455,000 1,468,822 |
| Correctional Services Department 2025-26 · Estimate |
5,488,495 | PDF p.1 printed 23 |
30 Correctional Services Department ........... ...........5,403,828 5,488,495 5,407,297 5,475,932 |
| Customs and Excise Department 2025-26 · Estimate |
6,117,332 | PDF p.1 printed 23 |
31 Customs and Excise Department ............. ...........5,892,697 6,117,332 5,855,363 6,163,011 |
| Civil Engineering and Development Department 2025-26 · Estimate |
4,119,132 | PDF p.1 printed 23 |
33 Civil Engineering and Development Department .......................................... ...........3,506,272 4,119,132 3,910,583 4,190,129 |
| Drainage Services Department 2025-26 · Estimate |
3,991,604 | PDF p.1 printed 23 |
39 Drainage Services Department................. ...........3,662,307 3,991,604 3,940,587 4,065,313 |
| Environmental Protection Department 2025-26 · Estimate |
8,633,114 | PDF p.1 printed 23 |
44 Environmental Protection Department..... ...........9,095,412 8,633,114 8,186,896 8,675,025 |
| Fire Services Department 2025-26 · Estimate |
9,251,993 | PDF p.1 printed 23 |
45 Fire Services Department ......................... ...........9,401,062 9,251,993 8,993,418 9,382,525 |
| General Expenses of the Civil Service 2025-26 · Estimate |
5,914,104 | PDF p.1 printed 23 |
46 General Expenses of the Civil Service ..... ...........5,236,889 5,914,104 5,556,701 5,951,078 |
| Government Secretariat: Digital Policy Office 2025-26 · Estimate |
3,494,475 | PDF p.1 printed 23 |
47 Government Secretariat: Digital Policy Office ................................................... ...........3,012,828 3,494,475 3,468,688 4,139,256 |
| Government Laboratory 2025-26 · Estimate |
640,768 | PDF p.1 printed 23 |
48 Government Laboratory ........................... ........... 631,008 640,768 639,244 658,042 |
| Food and Environmental Hygiene Department 2025-26 · Estimate |
11,226,394 | PDF p.1 printed 23 |
49 Food and Environmental Hygiene Department .......................................... ........... 11,121,517 11,226,394 10,989,155 11,114,476 |
| Government Property Agency 2025-26 · Estimate |
2,900,778 | PDF p.1 printed 23 |
51 Government Property Agency ................. ...........2,633,106 2,900,778 2,712,868 3,234,596 |
| Buildings Department 2025-26 · Estimate |
2,104,424 | PDF p.1 printed 23 |
82 Buildings Department .............................. ...........2,128,139 2,104,424 2,099,671 2,091,095 |
| Department of Justice 2025-26 · Estimate |
2,507,746 | PDF p.1 printed 23 |
92 Department of Justice............................... ...........2,007,766 2,507,746 2,109,357 2,539,090 |
| Government Secretariat: Culture, Sports and Tourism Bureau 2025-26 · Estimate |
6,100,908 | PDF p.1 printed 23 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ............................ ...........5,581,627 6,100,908 5,001,591 5,611,415 |
| Government Secretariat: Development Bureau (Planning and Lands Branch) 2025-26 · Estimate |
1,674,443 | PDF p.1 printed 23 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch).. ...........1,538,150 1,674,443 1,381,910 1,504,918 |
| Government Secretariat: Civil Service Bureau 2025-26 · Estimate |
987,857 | PDF p.1 printed 23 |
143 Government Secretariat: Civil Service Bureau.................................................. ........... 833,991 987,857 891,181 928,735 |
| Government Secretariat: Constitutional and Mainland Affairs Bureau 2025-26 · Estimate |
882,137 | PDF p.1 printed 23 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau .............. ........... 837,134 882,137 867,490 876,677 |
| Government Secretariat: Development Bureau (Works Branch) 2025-26 · Estimate |
1,449,775 | PDF p.1 printed 23 |
159 Government Secretariat: Development Bureau (Works Branch) ....................... ...........1,189,271 1,449,775 1,335,668 1,545,976 |
| Government Flying Service 2025-26 · Estimate |
626,572 | PDF p.1 printed 23 |
166 Government Flying Service ..................... ........... 618,745 626,572 616,633 619,060 |
| Hong Kong Police Force 2026-27 · Estimate |
26,952,693 | PDF p.2 printed 24 |
122 Hong Kong Police Force .......................... ........... 26,563,750 28,056,461 26,560,570 26,952,693 |
| Immigration Department 2026-27 · Estimate |
7,335,393 | PDF p.2 printed 24 |
70 Immigration Department .......................... ...........7,374,651 7,302,580 7,237,672 7,335,393 |
| Judiciary 2026-27 · Estimate |
2,906,276 | PDF p.2 printed 24 |
80 Judiciary ................................................... ...........2,610,877 2,806,173 2,781,631 2,906,276 |
| Independent Commission Against Corruption 2026-27 · Estimate |
1,412,952 | PDF p.2 printed 24 |
72 Independent Commission Against Corruption............................................ ...........1,392,908 1,397,364 1,397,364 1,412,952 |
| Labour Department 2026-27 · Estimate |
4,629,901 | PDF p.2 printed 24 |
90 Labour Department .................................. ...........2,787,708 3,483,750 3,451,167 4,629,901 |
| Government Secretariat: Innovation and Technology Commission 2026-27 · Estimate |
2,515,906 | PDF p.2 printed 24 |
155 Government Secretariat: Innovation and Technology Commission ..................... ........... 874,636 2,579,417 707,200 2,515,906 |
| Home Affairs Department 2026-27 · Estimate |
3,957,860 | PDF p.2 printed 24 |
63 Home Affairs Department ........................ ...........3,650,054 3,779,057 3,760,866 3,957,860 |
| Government Secretariat: Home and Youth Affairs Bureau 2026-27 · Estimate |
1,310,819 | PDF p.2 printed 24 |
53 Government Secretariat: Home and Youth Affairs Bureau .......................... ...........1,132,853 1,280,147 1,177,358 1,310,819 |
| Inland Revenue Department 2026-27 · Estimate |
2,050,749 | PDF p.2 printed 24 |
76 Inland Revenue Department..................... ...........2,072,190 2,063,078 2,060,285 2,050,749 |
| Legislative Council Commission 2026-27 · Estimate |
1,177,396 | PDF p.2 printed 24 |
112 Legislative Council Commission ............. ...........1,133,498 1,228,653 1,246,437 1,177,396 |
| Hong Kong Police Force 2025-26 · Revised estimate |
26,560,570 | PDF p.2 printed 24 |
122 Hong Kong Police Force .......................... ........... 26,563,750 28,056,461 26,560,570 26,952,693 |
| Government Secretariat: Housing Bureau 2025-26 · Revised estimate |
1,758,181 | PDF p.2 printed 24 |
62 Government Secretariat: Housing Bureau.................................................. ...........3,186,163 1,964,966 1,758,181 5,344,712 |
| Government Secretariat: Housing Bureau 2026-27 · Estimate |
5,344,712 | PDF p.2 printed 24 |
62 Government Secretariat: Housing Bureau.................................................. ...........3,186,163 1,964,966 1,758,181 5,344,712 |
| Government Secretariat: Home and Youth Affairs Bureau 2025-26 · Revised estimate |
1,177,358 | PDF p.2 printed 24 |
53 Government Secretariat: Home and Youth Affairs Bureau .......................... ...........1,132,853 1,280,147 1,177,358 1,310,819 |
| Highways Department 2025-26 · Revised estimate |
4,422,817 | PDF p.2 printed 24 |
60 Highways Department.............................. ...........4,364,087 4,613,785 4,422,817 4,705,760 |
| Highways Department 2026-27 · Estimate |
4,705,760 | PDF p.2 printed 24 |
60 Highways Department.............................. ...........4,364,087 4,613,785 4,422,817 4,705,760 |
| Home Affairs Department 2025-26 · Revised estimate |
3,760,866 | PDF p.2 printed 24 |
63 Home Affairs Department ........................ ...........3,650,054 3,779,057 3,760,866 3,957,860 |
| Immigration Department 2025-26 · Revised estimate |
7,237,672 | PDF p.2 printed 24 |
70 Immigration Department .......................... ...........7,374,651 7,302,580 7,237,672 7,335,393 |
| Independent Commission Against Corruption 2025-26 · Revised estimate |
1,397,364 | PDF p.2 printed 24 |
72 Independent Commission Against Corruption............................................ ...........1,392,908 1,397,364 1,397,364 1,412,952 |
| Information Services Department 2025-26 · Revised estimate |
708,545 | PDF p.2 printed 24 |
74 Information Services Department ............ ........... 655,552 736,868 708,545 651,127 |
| Information Services Department 2026-27 · Estimate |
651,127 | PDF p.2 printed 24 |
74 Information Services Department ............ ........... 655,552 736,868 708,545 651,127 |
| Inland Revenue Department 2025-26 · Revised estimate |
2,060,285 | PDF p.2 printed 24 |
76 Inland Revenue Department..................... ...........2,072,190 2,063,078 2,060,285 2,050,749 |
| Intellectual Property Department 2025-26 · Revised estimate |
277,946 | PDF p.2 printed 24 |
78 Intellectual Property Department ............. ........... 269,212 278,283 277,946 309,817 |
| Intellectual Property Department 2026-27 · Estimate |
309,817 | PDF p.2 printed 24 |
78 Intellectual Property Department ............. ........... 269,212 278,283 277,946 309,817 |
| Invest Hong Kong 2025-26 · Revised estimate |
303,826 | PDF p.2 printed 24 |
79 Invest Hong Kong .................................... ........... 305,559 303,826 303,826 361,350 |
| Invest Hong Kong 2026-27 · Estimate |
361,350 | PDF p.2 printed 24 |
79 Invest Hong Kong .................................... ........... 305,559 303,826 303,826 361,350 |
| Judiciary 2025-26 · Revised estimate |
2,781,631 | PDF p.2 printed 24 |
80 Judiciary ................................................... ...........2,610,877 2,806,173 2,781,631 2,906,276 |
| Labour Department 2025-26 · Revised estimate |
3,451,167 | PDF p.2 printed 24 |
90 Labour Department .................................. ...........2,787,708 3,483,750 3,451,167 4,629,901 |
| Lands Department 2025-26 · Revised estimate |
3,348,723 | PDF p.2 printed 24 |
91 Lands Department .................................... ...........3,467,553 3,354,440 3,348,723 3,280,868 |
| Lands Department 2026-27 · Estimate |
3,280,868 | PDF p.2 printed 24 |
91 Lands Department .................................... ...........3,467,553 3,354,440 3,348,723 3,280,868 |
| Legal Aid Department 2025-26 · Revised estimate |
1,436,213 | PDF p.2 printed 24 |
94 Legal Aid Department .............................. ...........1,439,122 1,637,999 1,436,213 1,613,686 |
| Legal Aid Department 2026-27 · Estimate |
1,613,686 | PDF p.2 printed 24 |
94 Legal Aid Department .............................. ...........1,439,122 1,637,999 1,436,213 1,613,686 |
| Government Secretariat: Overseas Economic and Trade Offices 2025-26 · Revised estimate |
471,443 | PDF p.2 printed 24 |
96 Government Secretariat: Overseas Economic and Trade Offices ............... ........... 452,455 600,150 471,443 598,938 |
| Government Secretariat: Overseas Economic and Trade Offices 2026-27 · Estimate |
598,938 | PDF p.2 printed 24 |
96 Government Secretariat: Overseas Economic and Trade Offices ............... ........... 452,455 600,150 471,443 598,938 |
| Legislative Council Commission 2025-26 · Revised estimate |
1,246,437 | PDF p.2 printed 24 |
112 Legislative Council Commission ............. ...........1,133,498 1,228,653 1,246,437 1,177,396 |
| Independent Police Complaints Council 2025-26 · Revised estimate |
93,521 | PDF p.2 printed 24 |
121 Independent Police Complaints Council .. ........... 95,453 93,521 93,521 91,618 |
| Independent Police Complaints Council 2026-27 · Estimate |
91,618 | PDF p.2 printed 24 |
121 Independent Police Complaints Council .. ........... 95,453 93,521 93,521 91,618 |
| Government Secretariat: Innovation, Technology and Industry Bureau 2025-26 · Revised estimate |
250,028 | PDF p.2 printed 24 |
135 Government Secretariat: Innovation, Technology and Industry Bureau ........ ........... 314,608 269,731 250,028 342,654 |
| Government Secretariat: Innovation, Technology and Industry Bureau 2026-27 · Estimate |
342,654 | PDF p.2 printed 24 |
135 Government Secretariat: Innovation, Technology and Industry Bureau ........ ........... 314,608 269,731 250,028 342,654 |
| Government Secretariat: Environment and Ecology Bureau (Food Branch) 2025-26 · Revised estimate |
187,750 | PDF p.2 printed 24 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) .... ........... 194,258 187,750 187,750 185,958 |
| Government Secretariat: Environment and Ecology Bureau (Food Branch) 2026-27 · Estimate |
185,958 | PDF p.2 printed 24 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) .... ........... 194,258 187,750 187,750 185,958 |
| Government Secretariat: Health Bureau 2025-26 · Revised estimate |
104,569,690 | PDF p.2 printed 24 |
140 Government Secretariat: Health Bureau .. ........... 101,060,529 104,812,359 104,569,690 107,612,141 |
| Government Secretariat: Health Bureau 2026-27 · Estimate |
107,612,141 | PDF p.2 printed 24 |
140 Government Secretariat: Health Bureau .. ........... 101,060,529 104,812,359 104,569,690 107,612,141 |
| Government Secretariat: Labour and Welfare Bureau 2025-26 · Revised estimate |
1,960,645 | PDF p.2 printed 24 |
141 Government Secretariat: Labour and Welfare Bureau .................................... ...........1,820,337 1,993,839 1,960,645 1,679,042 |
| Government Secretariat: Labour and Welfare Bureau 2026-27 · Estimate |
1,679,042 | PDF p.2 printed 24 |
141 Government Secretariat: Labour and Welfare Bureau .................................... ...........1,820,337 1,993,839 1,960,645 1,679,042 |
| Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2025-26 · Revised estimate |
1,173,127 | PDF p.2 printed 24 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ................. ...........1,184,599 1,245,933 1,173,127 1,281,761 |
| Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2026-27 · Estimate |
1,281,761 | PDF p.2 printed 24 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ................. ...........1,184,599 1,245,933 1,173,127 1,281,761 |
| Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2025-26 · Revised estimate |
388,960 | PDF p.2 printed 24 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) ........................ ...........1,338,487 591,983 388,960 424,538 |
| Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2026-27 · Estimate |
424,538 | PDF p.2 printed 24 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) ........................ ...........1,338,487 591,983 388,960 424,538 |
| Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2025-26 · Revised estimate |
491,810 | PDF p.2 printed 24 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ................ ...........1,126,830 435,509 491,810 582,322 |
| Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2026-27 · Estimate |
582,322 | PDF p.2 printed 24 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ................ ...........1,126,830 435,509 491,810 582,322 |
| Government Secretariat: Security Bureau 2025-26 · Revised estimate |
837,508 | PDF p.2 printed 24 |
151 Government Secretariat: Security Bureau.................................................. ...........1,462,659 876,107 837,508 893,619 |
| Government Secretariat: Security Bureau 2026-27 · Estimate |
893,619 | PDF p.2 printed 24 |
151 Government Secretariat: Security Bureau.................................................. ...........1,462,659 876,107 837,508 893,619 |
| Government Secretariat: Innovation and Technology Commission 2025-26 · Revised estimate |
707,200 | PDF p.2 printed 24 |
155 Government Secretariat: Innovation and Technology Commission ..................... ........... 874,636 2,579,417 707,200 2,515,906 |
| Government Secretariat: Transport and Logistics Bureau 2025-26 · Revised estimate |
411,590 | PDF p.2 printed 24 |
158 Government Secretariat: Transport and Logistics Bureau .................................. ........... 451,013 468,430 411,590 441,661 |
| Government Secretariat: Transport and Logistics Bureau 2026-27 · Estimate |
441,661 | PDF p.2 printed 24 |
158 Government Secretariat: Transport and Logistics Bureau .................................. ........... 451,013 468,430 411,590 441,661 |
| Hong Kong Observatory 2025-26 · Revised estimate |
470,422 | PDF p.2 printed 24 |
168 Hong Kong Observatory .......................... ........... 462,084 470,422 470,422 469,116 |
| Hong Kong Observatory 2026-27 · Estimate |
469,116 | PDF p.2 printed 24 |
168 Hong Kong Observatory .......................... ........... 462,084 470,422 470,422 469,116 |
| Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2025-26 · Revised estimate |
37,434 | PDF p.2 printed 24 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ................... ........... 40,461 39,220 37,434 38,619 |
| Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2026-27 · Estimate |
38,619 | PDF p.2 printed 24 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ................... ........... 40,461 39,220 37,434 38,619 |
| Government Secretariat: Housing Bureau 2025-26 · Estimate |
1,964,966 | PDF p.2 printed 24 |
62 Government Secretariat: Housing Bureau.................................................. ...........3,186,163 1,964,966 1,758,181 5,344,712 |
| Government Secretariat: Health Bureau 2025-26 · Estimate |
104,812,359 | PDF p.2 printed 24 |
140 Government Secretariat: Health Bureau .. ........... 101,060,529 104,812,359 104,569,690 107,612,141 |
| Government Secretariat: Innovation and Technology Commission 2025-26 · Estimate |
2,579,417 | PDF p.2 printed 24 |
155 Government Secretariat: Innovation and Technology Commission ..................... ........... 874,636 2,579,417 707,200 2,515,906 |
| Labour Department 2025-26 · Estimate |
3,483,750 | PDF p.2 printed 24 |
90 Labour Department .................................. ...........2,787,708 3,483,750 3,451,167 4,629,901 |
| Government Secretariat: Labour and Welfare Bureau 2025-26 · Estimate |
1,993,839 | PDF p.2 printed 24 |
141 Government Secretariat: Labour and Welfare Bureau .................................... ...........1,820,337 1,993,839 1,960,645 1,679,042 |
| Legislative Council Commission 2025-26 · Estimate |
1,228,653 | PDF p.2 printed 24 |
112 Legislative Council Commission ............. ...........1,133,498 1,228,653 1,246,437 1,177,396 |
| Government Secretariat: Home and Youth Affairs Bureau 2024-25 · Actual |
1,132,853 | PDF p.2 printed 24 |
53 Government Secretariat: Home and Youth Affairs Bureau .......................... ...........1,132,853 1,280,147 1,177,358 1,310,819 |
| Highways Department 2024-25 · Actual |
4,364,087 | PDF p.2 printed 24 |
60 Highways Department.............................. ...........4,364,087 4,613,785 4,422,817 4,705,760 |
| Government Secretariat: Housing Bureau 2024-25 · Actual |
3,186,163 | PDF p.2 printed 24 |
62 Government Secretariat: Housing Bureau.................................................. ...........3,186,163 1,964,966 1,758,181 5,344,712 |
| Home Affairs Department 2024-25 · Actual |
3,650,054 | PDF p.2 printed 24 |
63 Home Affairs Department ........................ ...........3,650,054 3,779,057 3,760,866 3,957,860 |
| Immigration Department 2024-25 · Actual |
7,374,651 | PDF p.2 printed 24 |
70 Immigration Department .......................... ...........7,374,651 7,302,580 7,237,672 7,335,393 |
| Independent Commission Against Corruption 2024-25 · Actual |
1,392,908 | PDF p.2 printed 24 |
72 Independent Commission Against Corruption............................................ ...........1,392,908 1,397,364 1,397,364 1,412,952 |
| Information Services Department 2024-25 · Actual |
655,552 | PDF p.2 printed 24 |
74 Information Services Department ............ ........... 655,552 736,868 708,545 651,127 |
| Inland Revenue Department 2024-25 · Actual |
2,072,190 | PDF p.2 printed 24 |
76 Inland Revenue Department..................... ...........2,072,190 2,063,078 2,060,285 2,050,749 |
| Intellectual Property Department 2024-25 · Actual |
269,212 | PDF p.2 printed 24 |
78 Intellectual Property Department ............. ........... 269,212 278,283 277,946 309,817 |
| Invest Hong Kong 2024-25 · Actual |
305,559 | PDF p.2 printed 24 |
79 Invest Hong Kong .................................... ........... 305,559 303,826 303,826 361,350 |
| Judiciary 2024-25 · Actual |
2,610,877 | PDF p.2 printed 24 |
80 Judiciary ................................................... ...........2,610,877 2,806,173 2,781,631 2,906,276 |
| Labour Department 2024-25 · Actual |
2,787,708 | PDF p.2 printed 24 |
90 Labour Department .................................. ...........2,787,708 3,483,750 3,451,167 4,629,901 |
| Lands Department 2024-25 · Actual |
3,467,553 | PDF p.2 printed 24 |
91 Lands Department .................................... ...........3,467,553 3,354,440 3,348,723 3,280,868 |
| Legal Aid Department 2024-25 · Actual |
1,439,122 | PDF p.2 printed 24 |
94 Legal Aid Department .............................. ...........1,439,122 1,637,999 1,436,213 1,613,686 |
| Government Secretariat: Overseas Economic and Trade Offices 2024-25 · Actual |
452,455 | PDF p.2 printed 24 |
96 Government Secretariat: Overseas Economic and Trade Offices ............... ........... 452,455 600,150 471,443 598,938 |
| Legislative Council Commission 2024-25 · Actual |
1,133,498 | PDF p.2 printed 24 |
112 Legislative Council Commission ............. ...........1,133,498 1,228,653 1,246,437 1,177,396 |
| Independent Police Complaints Council 2024-25 · Actual |
95,453 | PDF p.2 printed 24 |
121 Independent Police Complaints Council .. ........... 95,453 93,521 93,521 91,618 |
| Hong Kong Police Force 2024-25 · Actual |
26,563,750 | PDF p.2 printed 24 |
122 Hong Kong Police Force .......................... ........... 26,563,750 28,056,461 26,560,570 26,952,693 |
| Government Secretariat: Innovation, Technology and Industry Bureau 2024-25 · Actual |
314,608 | PDF p.2 printed 24 |
135 Government Secretariat: Innovation, Technology and Industry Bureau ........ ........... 314,608 269,731 250,028 342,654 |
| Government Secretariat: Environment and Ecology Bureau (Food Branch) 2024-25 · Actual |
194,258 | PDF p.2 printed 24 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) .... ........... 194,258 187,750 187,750 185,958 |
| Government Secretariat: Health Bureau 2024-25 · Actual |
101,060,529 | PDF p.2 printed 24 |
140 Government Secretariat: Health Bureau .. ........... 101,060,529 104,812,359 104,569,690 107,612,141 |
| Government Secretariat: Labour and Welfare Bureau 2024-25 · Actual |
1,820,337 | PDF p.2 printed 24 |
141 Government Secretariat: Labour and Welfare Bureau .................................... ...........1,820,337 1,993,839 1,960,645 1,679,042 |
| Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2024-25 · Actual |
1,184,599 | PDF p.2 printed 24 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ................. ...........1,184,599 1,245,933 1,173,127 1,281,761 |
| Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2024-25 · Actual |
1,338,487 | PDF p.2 printed 24 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) ........................ ...........1,338,487 591,983 388,960 424,538 |
| Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2024-25 · Actual |
1,126,830 | PDF p.2 printed 24 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ................ ...........1,126,830 435,509 491,810 582,322 |
| Government Secretariat: Security Bureau 2024-25 · Actual |
1,462,659 | PDF p.2 printed 24 |
151 Government Secretariat: Security Bureau.................................................. ...........1,462,659 876,107 837,508 893,619 |
| Government Secretariat: Innovation and Technology Commission 2024-25 · Actual |
874,636 | PDF p.2 printed 24 |
155 Government Secretariat: Innovation and Technology Commission ..................... ........... 874,636 2,579,417 707,200 2,515,906 |
| Government Secretariat: Transport and Logistics Bureau 2024-25 · Actual |
451,013 | PDF p.2 printed 24 |
158 Government Secretariat: Transport and Logistics Bureau .................................. ........... 451,013 468,430 411,590 441,661 |
| Hong Kong Observatory 2024-25 · Actual |
462,084 | PDF p.2 printed 24 |
168 Hong Kong Observatory .......................... ........... 462,084 470,422 470,422 469,116 |
| Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2024-25 · Actual |
40,461 | PDF p.2 printed 24 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ................... ........... 40,461 39,220 37,434 38,619 |
| Government Secretariat: Home and Youth Affairs Bureau 2025-26 · Estimate |
1,280,147 | PDF p.2 printed 24 |
53 Government Secretariat: Home and Youth Affairs Bureau .......................... ...........1,132,853 1,280,147 1,177,358 1,310,819 |
| Highways Department 2025-26 · Estimate |
4,613,785 | PDF p.2 printed 24 |
60 Highways Department.............................. ...........4,364,087 4,613,785 4,422,817 4,705,760 |
| Home Affairs Department 2025-26 · Estimate |
3,779,057 | PDF p.2 printed 24 |
63 Home Affairs Department ........................ ...........3,650,054 3,779,057 3,760,866 3,957,860 |
| Immigration Department 2025-26 · Estimate |
7,302,580 | PDF p.2 printed 24 |
70 Immigration Department .......................... ...........7,374,651 7,302,580 7,237,672 7,335,393 |
| Independent Commission Against Corruption 2025-26 · Estimate |
1,397,364 | PDF p.2 printed 24 |
72 Independent Commission Against Corruption............................................ ...........1,392,908 1,397,364 1,397,364 1,412,952 |
| Information Services Department 2025-26 · Estimate |
736,868 | PDF p.2 printed 24 |
74 Information Services Department ............ ........... 655,552 736,868 708,545 651,127 |
| Inland Revenue Department 2025-26 · Estimate |
2,063,078 | PDF p.2 printed 24 |
76 Inland Revenue Department..................... ...........2,072,190 2,063,078 2,060,285 2,050,749 |
| Intellectual Property Department 2025-26 · Estimate |
278,283 | PDF p.2 printed 24 |
78 Intellectual Property Department ............. ........... 269,212 278,283 277,946 309,817 |
| Invest Hong Kong 2025-26 · Estimate |
303,826 | PDF p.2 printed 24 |
79 Invest Hong Kong .................................... ........... 305,559 303,826 303,826 361,350 |
| Judiciary 2025-26 · Estimate |
2,806,173 | PDF p.2 printed 24 |
80 Judiciary ................................................... ...........2,610,877 2,806,173 2,781,631 2,906,276 |
| Lands Department 2025-26 · Estimate |
3,354,440 | PDF p.2 printed 24 |
91 Lands Department .................................... ...........3,467,553 3,354,440 3,348,723 3,280,868 |
| Legal Aid Department 2025-26 · Estimate |
1,637,999 | PDF p.2 printed 24 |
94 Legal Aid Department .............................. ...........1,439,122 1,637,999 1,436,213 1,613,686 |
| Government Secretariat: Overseas Economic and Trade Offices 2025-26 · Estimate |
600,150 | PDF p.2 printed 24 |
96 Government Secretariat: Overseas Economic and Trade Offices ............... ........... 452,455 600,150 471,443 598,938 |
| Independent Police Complaints Council 2025-26 · Estimate |
93,521 | PDF p.2 printed 24 |
121 Independent Police Complaints Council .. ........... 95,453 93,521 93,521 91,618 |
| Hong Kong Police Force 2025-26 · Estimate |
28,056,461 | PDF p.2 printed 24 |
122 Hong Kong Police Force .......................... ........... 26,563,750 28,056,461 26,560,570 26,952,693 |
| Government Secretariat: Innovation, Technology and Industry Bureau 2025-26 · Estimate |
269,731 | PDF p.2 printed 24 |
135 Government Secretariat: Innovation, Technology and Industry Bureau ........ ........... 314,608 269,731 250,028 342,654 |
| Government Secretariat: Environment and Ecology Bureau (Food Branch) 2025-26 · Estimate |
187,750 | PDF p.2 printed 24 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) .... ........... 194,258 187,750 187,750 185,958 |
| Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2025-26 · Estimate |
1,245,933 | PDF p.2 printed 24 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ................. ...........1,184,599 1,245,933 1,173,127 1,281,761 |
| Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2025-26 · Estimate |
591,983 | PDF p.2 printed 24 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) ........................ ...........1,338,487 591,983 388,960 424,538 |
| Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2025-26 · Estimate |
435,509 | PDF p.2 printed 24 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ................ ...........1,126,830 435,509 491,810 582,322 |
| Government Secretariat: Security Bureau 2025-26 · Estimate |
876,107 | PDF p.2 printed 24 |
151 Government Secretariat: Security Bureau.................................................. ...........1,462,659 876,107 837,508 893,619 |
| Government Secretariat: Transport and Logistics Bureau 2025-26 · Estimate |
468,430 | PDF p.2 printed 24 |
158 Government Secretariat: Transport and Logistics Bureau .................................. ........... 451,013 468,430 411,590 441,661 |
| Hong Kong Observatory 2025-26 · Estimate |
470,422 | PDF p.2 printed 24 |
168 Hong Kong Observatory .......................... ........... 462,084 470,422 470,422 469,116 |
| Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2025-26 · Estimate |
39,220 | PDF p.2 printed 24 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ................... ........... 40,461 39,220 37,434 38,619 |
| University Grants Committee 2026-27 · Estimate |
24,446,603 | PDF p.3 printed 25 |
190 University Grants Committee .................. ........... 24,475,910 24,699,692 24,560,813 24,446,603 |
| Water Supplies Department 2026-27 · Estimate |
10,443,456 | PDF p.3 printed 25 |
194 Water Supplies Department ..................... ........... 10,145,897 10,357,754 10,265,013 10,443,456 |
| Transport Department 2026-27 · Estimate |
13,058,751 | PDF p.3 printed 25 |
186 Transport Department .............................. ........... 12,110,232 13,264,426 11,358,599 13,058,751 |
| Working Family and Student Financial Assistance Agency 2026-27 · Estimate |
7,517,753 | PDF p.3 printed 25 |
173 Working Family and Student Financial Assistance Agency............................... ...........6,570,623 7,403,154 6,678,907 7,517,753 |
| Leisure and Cultural Services Department 2026-27 · Estimate |
12,366,517 | PDF p.3 printed 25 |
95 Leisure and Cultural Services Department .......................................... ........... 11,919,807 12,303,961 12,083,043 12,366,517 |
| Pensions 2026-27 · Estimate |
53,904,470 | PDF p.3 printed 25 |
120 Pensions ................................................... ........... 49,962,028 51,999,380 51,977,250 53,904,470 |
| Miscellaneous Services 2026-27 · Estimate |
6,299,819 | PDF p.3 printed 25 |
106 Miscellaneous Services ............................ ........... 71,104 1,678,437 78,810 6,299,819 |
| Social Welfare Department 2026-27 · Estimate |
132,936,008 | PDF p.3 printed 25 |
170 Social Welfare Department ...................... ........... 112,680,271 125,168,576 119,238,063 132,936,008 |
| Social Welfare Department 2025-26 · Revised estimate |
119,238,063 | PDF p.3 printed 25 |
170 Social Welfare Department ...................... ........... 112,680,271 125,168,576 119,238,063 132,936,008 |
| Miscellaneous Services 2025-26 · Revised estimate |
78,810 | PDF p.3 printed 25 |
106 Miscellaneous Services ............................ ........... 71,104 1,678,437 78,810 6,299,819 |
| Pensions 2025-26 · Revised estimate |
51,977,250 | PDF p.3 printed 25 |
120 Pensions ................................................... ........... 49,962,028 51,999,380 51,977,250 53,904,470 |
| Leisure and Cultural Services Department 2025-26 · Revised estimate |
12,083,043 | PDF p.3 printed 25 |
95 Leisure and Cultural Services Department .......................................... ........... 11,919,807 12,303,961 12,083,043 12,366,517 |
| Marine Department 2025-26 · Revised estimate |
1,898,781 | PDF p.3 printed 25 |
100 Marine Department .................................. ...........1,895,884 1,912,726 1,898,781 1,840,028 |
| Marine Department 2026-27 · Estimate |
1,840,028 | PDF p.3 printed 25 |
100 Marine Department .................................. ...........1,895,884 1,912,726 1,898,781 1,840,028 |
| Office of The Ombudsman 2025-26 · Revised estimate |
134,231 | PDF p.3 printed 25 |
114 Office of The Ombudsman ...................... ........... 136,644 134,231 134,231 131,724 |
| Office of The Ombudsman 2026-27 · Estimate |
131,724 | PDF p.3 printed 25 |
114 Office of The Ombudsman ...................... ........... 136,644 134,231 134,231 131,724 |
| Official Receiver’s Office 2025-26 · Revised estimate |
235,118 | PDF p.3 printed 25 |
116 Official Receiver’s Office ........................ ........... 234,900 238,783 235,118 234,855 |
| Official Receiver’s Office 2026-27 · Estimate |
234,855 | PDF p.3 printed 25 |
116 Official Receiver’s Office ........................ ........... 234,900 238,783 235,118 234,855 |
| Planning Department 2025-26 · Revised estimate |
900,995 | PDF p.3 printed 25 |
118 Planning Department................................ ........... 899,782 903,798 900,995 883,756 |
| Planning Department 2026-27 · Estimate |
883,756 | PDF p.3 printed 25 |
118 Planning Department................................ ........... 899,782 903,798 900,995 883,756 |
| Public Service Commission Secretariat 2025-26 · Revised estimate |
38,295 | PDF p.3 printed 25 |
136 Public Service Commission Secretariat ... ........... 37,124 38,420 38,295 42,037 |
| Public Service Commission Secretariat 2026-27 · Estimate |
42,037 | PDF p.3 printed 25 |
136 Public Service Commission Secretariat ... ........... 37,124 38,420 38,295 42,037 |
| Radio Television Hong Kong 2025-26 · Revised estimate |
1,532,688 | PDF p.3 printed 25 |
160 Radio Television Hong Kong .................. ...........1,260,316 1,551,601 1,532,688 1,123,859 |
| Radio Television Hong Kong 2026-27 · Estimate |
1,123,859 | PDF p.3 printed 25 |
160 Radio Television Hong Kong .................. ...........1,260,316 1,551,601 1,532,688 1,123,859 |
| Rating and Valuation Department 2025-26 · Revised estimate |
754,434 | PDF p.3 printed 25 |
162 Rating and Valuation Department............ ........... 735,351 756,419 754,434 737,771 |
| Rating and Valuation Department 2026-27 · Estimate |
737,771 | PDF p.3 printed 25 |
162 Rating and Valuation Department............ ........... 735,351 756,419 754,434 737,771 |
| Registration and Electoral Office 2025-26 · Revised estimate |
1,538,673 | PDF p.3 printed 25 |
163 Registration and Electoral Office ............. ........... 663,370 1,825,342 1,538,673 1,175,272 |
| Registration and Electoral Office 2026-27 · Estimate |
1,175,272 | PDF p.3 printed 25 |
163 Registration and Electoral Office ............. ........... 663,370 1,825,342 1,538,673 1,175,272 |
| Secretariat, Commissioner on Interception of Communications and Surveillance 2025-26 · Revised estimate |
24,200 | PDF p.3 printed 25 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ......................................... ........... 24,509 25,298 24,200 27,912 |
| Secretariat, Commissioner on Interception of Communications and Surveillance 2026-27 · Estimate |
27,912 | PDF p.3 printed 25 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ......................................... ........... 24,509 25,298 24,200 27,912 |
| Working Family and Student Financial Assistance Agency 2025-26 · Revised estimate |
6,678,907 | PDF p.3 printed 25 |
173 Working Family and Student Financial Assistance Agency............................... ...........6,570,623 7,403,154 6,678,907 7,517,753 |
| Office for Film, Newspaper and Article Administration 2025-26 · Revised estimate |
60,953 | PDF p.3 printed 25 |
180 Office for Film, Newspaper and Article Administration ..................................... ........... 58,719 61,493 60,953 60,187 |
| Office for Film, Newspaper and Article Administration 2026-27 · Estimate |
60,187 | PDF p.3 printed 25 |
180 Office for Film, Newspaper and Article Administration ..................................... ........... 58,719 61,493 60,953 60,187 |
| Trade and Industry Department 2025-26 · Revised estimate |
2,028,481 | PDF p.3 printed 25 |
181 Trade and Industry Department ............... ...........2,937,927 2,318,381 2,028,481 1,728,053 |
| Trade and Industry Department 2026-27 · Estimate |
1,728,053 | PDF p.3 printed 25 |
181 Trade and Industry Department ............... ...........2,937,927 2,318,381 2,028,481 1,728,053 |
| Transport Department 2025-26 · Revised estimate |
11,358,599 | PDF p.3 printed 25 |
186 Transport Department .............................. ........... 12,110,232 13,264,426 11,358,599 13,058,751 |
| Treasury 2025-26 · Revised estimate |
525,769 | PDF p.3 printed 25 |
188 Treasury ................................................... ........... 543,062 525,783 525,769 491,559 |
| Treasury 2026-27 · Estimate |
491,559 | PDF p.3 printed 25 |
188 Treasury ................................................... ........... 543,062 525,783 525,769 491,559 |
| University Grants Committee 2025-26 · Revised estimate |
24,560,813 | PDF p.3 printed 25 |
190 University Grants Committee .................. ........... 24,475,910 24,699,692 24,560,813 24,446,603 |
| Water Supplies Department 2025-26 · Revised estimate |
10,265,013 | PDF p.3 printed 25 |
194 Water Supplies Department ..................... ........... 10,145,897 10,357,754 10,265,013 10,443,456 |
| Social Welfare Department 2025-26 · Estimate |
125,168,576 | PDF p.3 printed 25 |
170 Social Welfare Department ...................... ........... 112,680,271 125,168,576 119,238,063 132,936,008 |
| Miscellaneous Services 2025-26 · Estimate |
1,678,437 | PDF p.3 printed 25 |
106 Miscellaneous Services ............................ ........... 71,104 1,678,437 78,810 6,299,819 |
| Pensions 2025-26 · Estimate |
51,999,380 | PDF p.3 printed 25 |
120 Pensions ................................................... ........... 49,962,028 51,999,380 51,977,250 53,904,470 |
| Transport Department 2025-26 · Estimate |
13,264,426 | PDF p.3 printed 25 |
186 Transport Department .............................. ........... 12,110,232 13,264,426 11,358,599 13,058,751 |
| Radio Television Hong Kong 2025-26 · Estimate |
1,551,601 | PDF p.3 printed 25 |
160 Radio Television Hong Kong .................. ...........1,260,316 1,551,601 1,532,688 1,123,859 |
| Registration and Electoral Office 2025-26 · Estimate |
1,825,342 | PDF p.3 printed 25 |
163 Registration and Electoral Office ............. ........... 663,370 1,825,342 1,538,673 1,175,272 |
| Trade and Industry Department 2025-26 · Estimate |
2,318,381 | PDF p.3 printed 25 |
181 Trade and Industry Department ............... ...........2,937,927 2,318,381 2,028,481 1,728,053 |
| University Grants Committee 2025-26 · Estimate |
24,699,692 | PDF p.3 printed 25 |
190 University Grants Committee .................. ........... 24,475,910 24,699,692 24,560,813 24,446,603 |
| Leisure and Cultural Services Department 2024-25 · Actual |
11,919,807 | PDF p.3 printed 25 |
95 Leisure and Cultural Services Department .......................................... ........... 11,919,807 12,303,961 12,083,043 12,366,517 |
| Marine Department 2024-25 · Actual |
1,895,884 | PDF p.3 printed 25 |
100 Marine Department .................................. ...........1,895,884 1,912,726 1,898,781 1,840,028 |
| Miscellaneous Services 2024-25 · Actual |
71,104 | PDF p.3 printed 25 |
106 Miscellaneous Services ............................ ........... 71,104 1,678,437 78,810 6,299,819 |
| Office of The Ombudsman 2024-25 · Actual |
136,644 | PDF p.3 printed 25 |
114 Office of The Ombudsman ...................... ........... 136,644 134,231 134,231 131,724 |
| Official Receiver’s Office 2024-25 · Actual |
234,900 | PDF p.3 printed 25 |
116 Official Receiver’s Office ........................ ........... 234,900 238,783 235,118 234,855 |
| Planning Department 2024-25 · Actual |
899,782 | PDF p.3 printed 25 |
118 Planning Department................................ ........... 899,782 903,798 900,995 883,756 |
| Pensions 2024-25 · Actual |
49,962,028 | PDF p.3 printed 25 |
120 Pensions ................................................... ........... 49,962,028 51,999,380 51,977,250 53,904,470 |
| Public Service Commission Secretariat 2024-25 · Actual |
37,124 | PDF p.3 printed 25 |
136 Public Service Commission Secretariat ... ........... 37,124 38,420 38,295 42,037 |
| Radio Television Hong Kong 2024-25 · Actual |
1,260,316 | PDF p.3 printed 25 |
160 Radio Television Hong Kong .................. ...........1,260,316 1,551,601 1,532,688 1,123,859 |
| Rating and Valuation Department 2024-25 · Actual |
735,351 | PDF p.3 printed 25 |
162 Rating and Valuation Department............ ........... 735,351 756,419 754,434 737,771 |
| Registration and Electoral Office 2024-25 · Actual |
663,370 | PDF p.3 printed 25 |
163 Registration and Electoral Office ............. ........... 663,370 1,825,342 1,538,673 1,175,272 |
| Secretariat, Commissioner on Interception of Communications and Surveillance 2024-25 · Actual |
24,509 | PDF p.3 printed 25 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ......................................... ........... 24,509 25,298 24,200 27,912 |
| Social Welfare Department 2024-25 · Actual |
112,680,271 | PDF p.3 printed 25 |
170 Social Welfare Department ...................... ........... 112,680,271 125,168,576 119,238,063 132,936,008 |
| Working Family and Student Financial Assistance Agency 2024-25 · Actual |
6,570,623 | PDF p.3 printed 25 |
173 Working Family and Student Financial Assistance Agency............................... ...........6,570,623 7,403,154 6,678,907 7,517,753 |
| Office for Film, Newspaper and Article Administration 2024-25 · Actual |
58,719 | PDF p.3 printed 25 |
180 Office for Film, Newspaper and Article Administration ..................................... ........... 58,719 61,493 60,953 60,187 |
| Trade and Industry Department 2024-25 · Actual |
2,937,927 | PDF p.3 printed 25 |
181 Trade and Industry Department ............... ...........2,937,927 2,318,381 2,028,481 1,728,053 |
| Transfers to Funds 2025-26 · Revised estimate |
7,071,000 | PDF p.3 printed 25 |
184 Transfers to Funds .................................... ........... 165,000 7,071,000 7,071,000 4,063,000 |
| Transfers to Funds 2026-27 · Estimate |
4,063,000 | PDF p.3 printed 25 |
184 Transfers to Funds .................................... ........... 165,000 7,071,000 7,071,000 4,063,000 |
| Transfers to Funds 2024-25 · Actual |
165,000 | PDF p.3 printed 25 |
184 Transfers to Funds .................................... ........... 165,000 7,071,000 7,071,000 4,063,000 |
| Transport Department 2024-25 · Actual |
12,110,232 | PDF p.3 printed 25 |
186 Transport Department .............................. ........... 12,110,232 13,264,426 11,358,599 13,058,751 |
| Treasury 2024-25 · Actual |
543,062 | PDF p.3 printed 25 |
188 Treasury ................................................... ........... 543,062 525,783 525,769 491,559 |
| University Grants Committee 2024-25 · Actual |
24,475,910 | PDF p.3 printed 25 |
190 University Grants Committee .................. ........... 24,475,910 24,699,692 24,560,813 24,446,603 |
| Water Supplies Department 2024-25 · Actual |
10,145,897 | PDF p.3 printed 25 |
194 Water Supplies Department ..................... ........... 10,145,897 10,357,754 10,265,013 10,443,456 |
| Leisure and Cultural Services Department 2025-26 · Estimate |
12,303,961 | PDF p.3 printed 25 |
95 Leisure and Cultural Services Department .......................................... ........... 11,919,807 12,303,961 12,083,043 12,366,517 |
| Marine Department 2025-26 · Estimate |
1,912,726 | PDF p.3 printed 25 |
100 Marine Department .................................. ...........1,895,884 1,912,726 1,898,781 1,840,028 |
| Office of The Ombudsman 2025-26 · Estimate |
134,231 | PDF p.3 printed 25 |
114 Office of The Ombudsman ...................... ........... 136,644 134,231 134,231 131,724 |
| Official Receiver’s Office 2025-26 · Estimate |
238,783 | PDF p.3 printed 25 |
116 Official Receiver’s Office ........................ ........... 234,900 238,783 235,118 234,855 |
| Planning Department 2025-26 · Estimate |
903,798 | PDF p.3 printed 25 |
118 Planning Department................................ ........... 899,782 903,798 900,995 883,756 |
| Public Service Commission Secretariat 2025-26 · Estimate |
38,420 | PDF p.3 printed 25 |
136 Public Service Commission Secretariat ... ........... 37,124 38,420 38,295 42,037 |
| Rating and Valuation Department 2025-26 · Estimate |
756,419 | PDF p.3 printed 25 |
162 Rating and Valuation Department............ ........... 735,351 756,419 754,434 737,771 |
| Secretariat, Commissioner on Interception of Communications and Surveillance 2025-26 · Estimate |
25,298 | PDF p.3 printed 25 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ......................................... ........... 24,509 25,298 24,200 27,912 |
| Working Family and Student Financial Assistance Agency 2025-26 · Estimate |
7,403,154 | PDF p.3 printed 25 |
173 Working Family and Student Financial Assistance Agency............................... ...........6,570,623 7,403,154 6,678,907 7,517,753 |
| Office for Film, Newspaper and Article Administration 2025-26 · Estimate |
61,493 | PDF p.3 printed 25 |
180 Office for Film, Newspaper and Article Administration ..................................... ........... 58,719 61,493 60,953 60,187 |
| Transfers to Funds 2025-26 · Estimate |
7,071,000 | PDF p.3 printed 25 |
184 Transfers to Funds .................................... ........... 165,000 7,071,000 7,071,000 4,063,000 |
| Treasury 2025-26 · Estimate |
525,783 | PDF p.3 printed 25 |
188 Treasury ................................................... ........... 543,062 525,783 525,769 491,559 |
| Water Supplies Department 2025-26 · Estimate |
10,357,754 | PDF p.3 printed 25 |
194 Water Supplies Department ..................... ........... 10,145,897 10,357,754 10,265,013 10,443,456 |
Estimates for the year ending 31 March 2027 – Volume I – General Revenue Account: Summary of Establishment (154)
https://www.budget.gov.hk/2026/eng/pdf/sum_est_e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Establishment (number of posts) — Chief Executive’s Office 2026-27 · Estimate |
107 | PDF p.1 printed 28 |
21 Chief Executive’s Office ................................................. 108 107 |
| Establishment (number of posts) — Agriculture, Fisheries and Conservation Department 2026-27 · Estimate |
2 261 | PDF p.1 printed 28 |
22 Agriculture, Fisheries and Conservation Department ..... 2 316 2 261 |
| Establishment (number of posts) — Auxiliary Medical Service 2026-27 · Estimate |
96 | PDF p.1 printed 28 |
23 Auxiliary Medical Service .............................................. 97 96 |
| Establishment (number of posts) — Audit Commission 2026-27 · Estimate |
191 | PDF p.1 printed 28 |
24 Audit Commission .......................................................... 195 191 |
| Establishment (number of posts) — Architectural Services Department 2026-27 · Estimate |
1 943 | PDF p.1 printed 28 |
25 Architectural Services Department ................................. 1 994 (2) 1 943 (2) |
| Establishment (number of posts) — Census and Statistics Department 2026-27 · Estimate |
1 204 | PDF p.1 printed 28 |
26 Census and Statistics Department ................................... 1 231 1 204 |
| Establishment (number of posts) — Civil Aid Service 2026-27 · Estimate |
103 | PDF p.1 printed 28 |
27 Civil Aid Service ............................................................. 106 103 |
| Establishment (number of posts) — Civil Aviation Department 2026-27 · Estimate |
915 | PDF p.1 printed 28 |
28 Civil Aviation Department .............................................. 931 (1) 915 (1) |
| Establishment (number of posts) — Correctional Services Department 2026-27 · Estimate |
6 974 | PDF p.1 printed 28 |
30 Correctional Services Department .................................. 7 153 6 974 |
| Establishment (number of posts) — Customs and Excise Department 2026-27 · Estimate |
7 680 | PDF p.1 printed 28 |
31 Customs and Excise Department..................................... 7 851 (1) 7 680 |
| Establishment (number of posts) — Civil Engineering and Development Department 2026-27 · Estimate |
1 998 | PDF p.1 printed 28 |
33 Civil Engineering and Development Department ........... 2 082 (9) 1 998 (5) |
| Establishment (number of posts) — Department of Health 2026-27 · Estimate |
6 800 | PDF p.1 printed 28 |
37 Department of Health ...................................................... 6 943 (1) 6 800 (1) |
| Establishment (number of posts) — Drainage Services Department 2026-27 · Estimate |
1 983 | PDF p.1 printed 28 |
39 Drainage Services Department ........................................ 2 028 (1) 1 983 |
| Establishment (number of posts) — Electrical and Mechanical Services Department 2026-27 · Estimate |
540 | PDF p.1 printed 28 |
42 Electrical and Mechanical Services Department............. 565 (3) 540 (2) |
| Establishment (number of posts) — Environmental Protection Department 2026-27 · Estimate |
1 983 | PDF p.1 printed 28 |
44 Environmental Protection Department ............................ 2 055 (2) 1 983 (2) |
| Establishment (number of posts) — Fire Services Department 2026-27 · Estimate |
11 319 | PDF p.1 printed 28 |
45 Fire Services Department ................................................ 11 578 (2) 11 319 (1) |
| Establishment (number of posts) — General Expenses of the Civil Service 2026-27 · Estimate |
355 | PDF p.1 printed 28 |
46 General Expenses of the Civil Service ............................ 359 355 |
| Establishment (number of posts) — Government Secretariat: Digital Policy Office 2026-27 · Estimate |
838 | PDF p.1 printed 28 |
47 Government Secretariat: Digital Policy Office ............... 880 838 |
| Establishment (number of posts) — Government Laboratory 2026-27 · Estimate |
498 | PDF p.1 printed 28 |
48 Government Laboratory .................................................. 505 498 |
| Establishment (number of posts) — Food and Environmental Hygiene Department 2026-27 · Estimate |
11 102 | PDF p.1 printed 28 |
49 Food and Environmental Hygiene Department............... 11 337 (2) 11 102 (2) |
| Establishment (number of posts) — Government Property Agency 2026-27 · Estimate |
309 | PDF p.1 printed 28 |
51 Government Property Agency......................................... 324 (1) 309 |
| Establishment (number of posts) — Government Logistics Department 2026-27 · Estimate |
728 | PDF p.1 printed 28 |
59 Government Logistics Department ................................. 743 728 |
| Establishment (number of posts) — Buildings Department 2026-27 · Estimate |
1 997 | PDF p.1 printed 28 |
82 Buildings Department ..................................................... 2 111 1 997 |
| Establishment (number of posts) — Department of Justice 2026-27 · Estimate |
1 474 | PDF p.1 printed 28 |
92 Department of Justice ...................................................... 1 504 (3) 1 474 (2) |
| Establishment (number of posts) — Government Secretariat: Culture, Sports and Tourism Bureau 2026-27 · Estimate |
310 | PDF p.1 printed 28 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ......................................................................... 401 (6) 310 (3) |
| Establishment (number of posts) — Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2026-27 · Estimate |
214 | PDF p.1 printed 28 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) .................................... 219 214 |
| Establishment (number of posts) — Government Secretariat: Development Bureau (Planning and Lands Branch) 2026-27 · Estimate |
202 | PDF p.1 printed 28 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch) ..................................... 211 (4) 202 (5) |
| Establishment (number of posts) — Government Secretariat: Environment and Ecology Bureau (Food Branch) 2026-27 · Estimate |
50 | PDF p.1 printed 28 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) ................................................ 50 (1) 50 (1) |
| Establishment (number of posts) — Government Secretariat: Civil Service Bureau 2026-27 · Estimate |
684 | PDF p.1 printed 28 |
143 Government Secretariat: Civil Service Bureau ............... 700 684 |
| Establishment (number of posts) — Government Secretariat: Constitutional and Mainland Affairs Bureau 2026-27 · Estimate |
212 | PDF p.1 printed 28 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau ............................................................ 216 (2) 212 (2) |
| Establishment (number of posts) — Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2026-27 · Estimate |
100 | PDF p.1 printed 28 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ............ 103 (3) 100 (2) |
| Establishment (number of posts) — Government Secretariat: Commerce and Economic Development Bureau 2026-27 · Estimate |
216 | PDF p.1 printed 28 |
152 Government Secretariat: Commerce and Economic Development Bureau .................................................. 216 (2) 216 (2) |
| Establishment (number of posts) — Government Secretariat: Education Bureau 2026-27 · Estimate |
6 237 | PDF p.1 printed 28 |
156 Government Secretariat: Education Bureau .................... 6 368 (5) 6 237 (5) |
| Establishment (number of posts) — Government Secretariat: Development Bureau (Works Branch) 2026-27 · Estimate |
451 | PDF p.1 printed 28 |
159 Government Secretariat: Development Bureau (Works Branch) ....................................................................... 458 (2) 451 (2) |
| Establishment (number of posts) — Government Flying Service 2026-27 · Estimate |
349 | PDF p.1 printed 28 |
166 Government Flying Service ............................................ 352 349 |
| Establishment (number of posts) — Chief Executive’s Office 2025-26 · Revised estimate |
108 | PDF p.1 printed 28 |
21 Chief Executive’s Office ................................................. 108 107 |
| Establishment (number of posts) — Agriculture, Fisheries and Conservation Department 2025-26 · Revised estimate |
2 316 | PDF p.1 printed 28 |
22 Agriculture, Fisheries and Conservation Department ..... 2 316 2 261 |
| Establishment (number of posts) — Auxiliary Medical Service 2025-26 · Revised estimate |
97 | PDF p.1 printed 28 |
23 Auxiliary Medical Service .............................................. 97 96 |
| Establishment (number of posts) — Audit Commission 2025-26 · Revised estimate |
195 | PDF p.1 printed 28 |
24 Audit Commission .......................................................... 195 191 |
| Establishment (number of posts) — Architectural Services Department 2025-26 · Revised estimate |
1 994 | PDF p.1 printed 28 |
25 Architectural Services Department ................................. 1 994 (2) 1 943 (2) |
| Establishment (number of posts) — Census and Statistics Department 2025-26 · Revised estimate |
1 231 | PDF p.1 printed 28 |
26 Census and Statistics Department ................................... 1 231 1 204 |
| Establishment (number of posts) — Civil Aid Service 2025-26 · Revised estimate |
106 | PDF p.1 printed 28 |
27 Civil Aid Service ............................................................. 106 103 |
| Establishment (number of posts) — Civil Aviation Department 2025-26 · Revised estimate |
931 | PDF p.1 printed 28 |
28 Civil Aviation Department .............................................. 931 (1) 915 (1) |
| Establishment (number of posts) — Correctional Services Department 2025-26 · Revised estimate |
7 153 | PDF p.1 printed 28 |
30 Correctional Services Department .................................. 7 153 6 974 |
| Establishment (number of posts) — Customs and Excise Department 2025-26 · Revised estimate |
7 851 | PDF p.1 printed 28 |
31 Customs and Excise Department..................................... 7 851 (1) 7 680 |
| Establishment (number of posts) — Civil Engineering and Development Department 2025-26 · Revised estimate |
2 082 | PDF p.1 printed 28 |
33 Civil Engineering and Development Department ........... 2 082 (9) 1 998 (5) |
| Establishment (number of posts) — Department of Health 2025-26 · Revised estimate |
6 943 | PDF p.1 printed 28 |
37 Department of Health ...................................................... 6 943 (1) 6 800 (1) |
| Establishment (number of posts) — Drainage Services Department 2025-26 · Revised estimate |
2 028 | PDF p.1 printed 28 |
39 Drainage Services Department ........................................ 2 028 (1) 1 983 |
| Establishment (number of posts) — Electrical and Mechanical Services Department 2025-26 · Revised estimate |
565 | PDF p.1 printed 28 |
42 Electrical and Mechanical Services Department............. 565 (3) 540 (2) |
| Establishment (number of posts) — Environmental Protection Department 2025-26 · Revised estimate |
2 055 | PDF p.1 printed 28 |
44 Environmental Protection Department ............................ 2 055 (2) 1 983 (2) |
| Establishment (number of posts) — Fire Services Department 2025-26 · Revised estimate |
11 578 | PDF p.1 printed 28 |
45 Fire Services Department ................................................ 11 578 (2) 11 319 (1) |
| Establishment (number of posts) — General Expenses of the Civil Service 2025-26 · Revised estimate |
359 | PDF p.1 printed 28 |
46 General Expenses of the Civil Service ............................ 359 355 |
| Establishment (number of posts) — Government Secretariat: Digital Policy Office 2025-26 · Revised estimate |
880 | PDF p.1 printed 28 |
47 Government Secretariat: Digital Policy Office ............... 880 838 |
| Establishment (number of posts) — Government Laboratory 2025-26 · Revised estimate |
505 | PDF p.1 printed 28 |
48 Government Laboratory .................................................. 505 498 |
| Establishment (number of posts) — Food and Environmental Hygiene Department 2025-26 · Revised estimate |
11 337 | PDF p.1 printed 28 |
49 Food and Environmental Hygiene Department............... 11 337 (2) 11 102 (2) |
| Establishment (number of posts) — Government Property Agency 2025-26 · Revised estimate |
324 | PDF p.1 printed 28 |
51 Government Property Agency......................................... 324 (1) 309 |
| Establishment (number of posts) — Government Logistics Department 2025-26 · Revised estimate |
743 | PDF p.1 printed 28 |
59 Government Logistics Department ................................. 743 728 |
| Establishment (number of posts) — Buildings Department 2025-26 · Revised estimate |
2 111 | PDF p.1 printed 28 |
82 Buildings Department ..................................................... 2 111 1 997 |
| Establishment (number of posts) — Department of Justice 2025-26 · Revised estimate |
1 504 | PDF p.1 printed 28 |
92 Department of Justice ...................................................... 1 504 (3) 1 474 (2) |
| Establishment (number of posts) — Government Secretariat: Culture, Sports and Tourism Bureau 2025-26 · Revised estimate |
401 | PDF p.1 printed 28 |
132 Government Secretariat: Culture, Sports and Tourism Bureau ......................................................................... 401 (6) 310 (3) |
| Establishment (number of posts) — Government Secretariat: Environment and Ecology Bureau (Environment Branch) 2025-26 · Revised estimate |
219 | PDF p.1 printed 28 |
137 Government Secretariat: Environment and Ecology Bureau (Environment Branch) .................................... 219 214 |
| Establishment (number of posts) — Government Secretariat: Development Bureau (Planning and Lands Branch) 2025-26 · Revised estimate |
211 | PDF p.1 printed 28 |
138 Government Secretariat: Development Bureau (Planning and Lands Branch) ..................................... 211 (4) 202 (5) |
| Establishment (number of posts) — Government Secretariat: Environment and Ecology Bureau (Food Branch) 2025-26 · Revised estimate |
50 | PDF p.1 printed 28 |
139 Government Secretariat: Environment and Ecology Bureau (Food Branch) ................................................ 50 (1) 50 (1) |
| Establishment (number of posts) — Government Secretariat: Civil Service Bureau 2025-26 · Revised estimate |
700 | PDF p.1 printed 28 |
143 Government Secretariat: Civil Service Bureau ............... 700 684 |
| Establishment (number of posts) — Government Secretariat: Constitutional and Mainland Affairs Bureau 2025-26 · Revised estimate |
216 | PDF p.1 printed 28 |
144 Government Secretariat: Constitutional and Mainland Affairs Bureau ............................................................ 216 (2) 212 (2) |
| Establishment (number of posts) — Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) 2025-26 · Revised estimate |
103 | PDF p.1 printed 28 |
148 Government Secretariat: Financial Services and the Treasury Bureau (Financial Services Branch) ............ 103 (3) 100 (2) |
| Establishment (number of posts) — Government Secretariat: Commerce and Economic Development Bureau 2025-26 · Revised estimate |
216 | PDF p.1 printed 28 |
152 Government Secretariat: Commerce and Economic Development Bureau .................................................. 216 (2) 216 (2) |
| Establishment (number of posts) — Government Secretariat: Education Bureau 2025-26 · Revised estimate |
6 368 | PDF p.1 printed 28 |
156 Government Secretariat: Education Bureau .................... 6 368 (5) 6 237 (5) |
| Establishment (number of posts) — Government Secretariat: Development Bureau (Works Branch) 2025-26 · Revised estimate |
458 | PDF p.1 printed 28 |
159 Government Secretariat: Development Bureau (Works Branch) ....................................................................... 458 (2) 451 (2) |
| Establishment (number of posts) — Government Flying Service 2025-26 · Revised estimate |
352 | PDF p.1 printed 28 |
166 Government Flying Service ............................................ 352 349 |
| Establishment (number of posts) — Hong Kong Police Force 2025-26 · Revised estimate |
37 793 | PDF p.2 printed 29 |
122 Hong Kong Police Force ................................................. 37 793 (1) 36 458 |
| Establishment (number of posts) — Hong Kong Police Force 2026-27 · Estimate |
36 458 | PDF p.2 printed 29 |
122 Hong Kong Police Force ................................................. 37 793 (1) 36 458 |
| Establishment (number of posts) — Government Secretariat: Home and Youth Affairs Bureau 2026-27 · Estimate |
225 | PDF p.2 printed 29 |
53 Government Secretariat: Home and Youth Affairs Bureau ......................................................................... 194 (1) 225 (1) |
| Establishment (number of posts) — Highways Department 2026-27 · Estimate |
2 402 | PDF p.2 printed 29 |
60 Highways Department ..................................................... 2 472 (3) 2 402 (3) |
| Establishment (number of posts) — Home Affairs Department 2026-27 · Estimate |
2 253 | PDF p.2 printed 29 |
63 Home Affairs Department ............................................... 2 296 (1) 2 253 |
| Establishment (number of posts) — Immigration Department 2026-27 · Estimate |
8 622 | PDF p.2 printed 29 |
70 Immigration Department ................................................. 8 806 (1) 8 622 (1) |
| Establishment (number of posts) — Independent Commission Against Corruption 2026-27 · Estimate |
1 549 | PDF p.2 printed 29 |
72 Independent Commission Against Corruption ................ 1 573 (1) 1 549 (1) |
| Establishment (number of posts) — Information Services Department 2026-27 · Estimate |
442 | PDF p.2 printed 29 |
74 Information Services Department ................................... 449 442 |
| Establishment (number of posts) — Inland Revenue Department 2026-27 · Estimate |
2 866 | PDF p.2 printed 29 |
76 Inland Revenue Department ............................................ 2 925 2 866 |
| Establishment (number of posts) — Intellectual Property Department 2026-27 · Estimate |
188 | PDF p.2 printed 29 |
78 Intellectual Property Department .................................... 192 188 |
| Establishment (number of posts) — Invest Hong Kong 2026-27 · Estimate |
45 | PDF p.2 printed 29 |
79 Invest Hong Kong ........................................................... 43 45 |
| Establishment (number of posts) — Judiciary 2026-27 · Estimate |
2 050 | PDF p.2 printed 29 |
80 Judiciary .......................................................................... 2 068 (1) 2 050 (2) |
| Establishment (number of posts) — Labour Department 2026-27 · Estimate |
2 447 | PDF p.2 printed 29 |
90 Labour Department ......................................................... 2 503 (1) 2 447 (1) |
| Establishment (number of posts) — Lands Department 2026-27 · Estimate |
4 396 | PDF p.2 printed 29 |
91 Lands Department ........................................................... 4 535 (1) 4 396 (1) |
| Establishment (number of posts) — Legal Aid Department 2026-27 · Estimate |
543 | PDF p.2 printed 29 |
94 Legal Aid Department ..................................................... 556 543 |
| Establishment (number of posts) — Leisure and Cultural Services Department 2026-27 · Estimate |
10 118 | PDF p.2 printed 29 |
95 Leisure and Cultural Services Department ..................... 10 329 10 118 |
| Establishment (number of posts) — Government Secretariat: Overseas Economic and Trade Offices 2026-27 · Estimate |
239 | PDF p.2 printed 29 |
96 Government Secretariat: Overseas Economic and Trade Offices .............................................................. 228 239 |
| Establishment (number of posts) — Marine Department 2026-27 · Estimate |
1 441 | PDF p.2 printed 29 |
100 Marine Department ......................................................... 1 473 1 441 |
| Establishment (number of posts) — Official Receiver’s Office 2026-27 · Estimate |
270 | PDF p.2 printed 29 |
116 Official Receiver’s Office ............................................... 277 270 |
| Establishment (number of posts) — Planning Department 2026-27 · Estimate |
924 | PDF p.2 printed 29 |
118 Planning Department ....................................................... 957 (1) 924 |
| Establishment (number of posts) — Government Secretariat: Innovation, Technology and Industry Bureau 2026-27 · Estimate |
77 | PDF p.2 printed 29 |
135 Government Secretariat: Innovation, Technology and Industry Bureau .......................................................... 78 77 |
| Establishment (number of posts) — Public Service Commission Secretariat 2026-27 · Estimate |
33 | PDF p.2 printed 29 |
136 Public Service Commission Secretariat .......................... 34 33 |
| Establishment (number of posts) — Government Secretariat: Health Bureau 2026-27 · Estimate |
240 | PDF p.2 printed 29 |
140 Government Secretariat: Health Bureau ......................... 248 240 |
| Establishment (number of posts) — Government Secretariat: Labour and Welfare Bureau 2026-27 · Estimate |
156 | PDF p.2 printed 29 |
141 Government Secretariat: Labour and Welfare Bureau .... 159 (3) 156 (3) |
| Establishment (number of posts) — Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2026-27 · Estimate |
533 | PDF p.2 printed 29 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ..................................................................... 551 (1) 533 |
| Establishment (number of posts) — Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2026-27 · Estimate |
197 | PDF p.2 printed 29 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) .................... 201 197 |
| Establishment (number of posts) — Government Secretariat: Security Bureau 2026-27 · Estimate |
238 | PDF p.2 printed 29 |
151 Government Secretariat: Security Bureau ....................... 244 (2) 238 (2) |
| Establishment (number of posts) — Government Secretariat: Innovation and Technology Commission 2026-27 · Estimate |
335 | PDF p.2 printed 29 |
155 Government Secretariat: Innovation and Technology Commission ................................................................ 356 335 |
| Establishment (number of posts) — Government Secretariat: Transport and Logistics Bureau 2026-27 · Estimate |
203 | PDF p.2 printed 29 |
158 Government Secretariat: Transport and Logistics Bureau ......................................................................... 210 (1) 203 |
| Establishment (number of posts) — Radio Television Hong Kong 2026-27 · Estimate |
743 | PDF p.2 printed 29 |
160 Radio Television Hong Kong.......................................... 758 743 |
| Establishment (number of posts) — Rating and Valuation Department 2026-27 · Estimate |
943 | PDF p.2 printed 29 |
162 Rating and Valuation Department ................................... 968 943 |
| Establishment (number of posts) — Registration and Electoral Office 2026-27 · Estimate |
302 | PDF p.2 printed 29 |
163 Registration and Electoral Office .................................... 316 (2) 302 (2) |
| Establishment (number of posts) — Hong Kong Observatory 2026-27 · Estimate |
357 | PDF p.2 printed 29 |
168 Hong Kong Observatory ................................................. 366 357 |
| Establishment (number of posts) — Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2026-27 · Estimate |
30 | PDF p.2 printed 29 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ........................................................................ 31 30 |
| Establishment (number of posts) — Office for Film, Newspaper and Article Administration 2026-27 · Estimate |
63 | PDF p.2 printed 29 |
180 Office for Film, Newspaper and Article Administration ............................................................ 65 63 |
| Establishment (number of posts) — Government Secretariat: Home and Youth Affairs Bureau 2025-26 · Revised estimate |
194 | PDF p.2 printed 29 |
53 Government Secretariat: Home and Youth Affairs Bureau ......................................................................... 194 (1) 225 (1) |
| Establishment (number of posts) — Highways Department 2025-26 · Revised estimate |
2 472 | PDF p.2 printed 29 |
60 Highways Department ..................................................... 2 472 (3) 2 402 (3) |
| Establishment (number of posts) — Home Affairs Department 2025-26 · Revised estimate |
2 296 | PDF p.2 printed 29 |
63 Home Affairs Department ............................................... 2 296 (1) 2 253 |
| Establishment (number of posts) — Immigration Department 2025-26 · Revised estimate |
8 806 | PDF p.2 printed 29 |
70 Immigration Department ................................................. 8 806 (1) 8 622 (1) |
| Establishment (number of posts) — Independent Commission Against Corruption 2025-26 · Revised estimate |
1 573 | PDF p.2 printed 29 |
72 Independent Commission Against Corruption ................ 1 573 (1) 1 549 (1) |
| Establishment (number of posts) — Information Services Department 2025-26 · Revised estimate |
449 | PDF p.2 printed 29 |
74 Information Services Department ................................... 449 442 |
| Establishment (number of posts) — Inland Revenue Department 2025-26 · Revised estimate |
2 925 | PDF p.2 printed 29 |
76 Inland Revenue Department ............................................ 2 925 2 866 |
| Establishment (number of posts) — Intellectual Property Department 2025-26 · Revised estimate |
192 | PDF p.2 printed 29 |
78 Intellectual Property Department .................................... 192 188 |
| Establishment (number of posts) — Invest Hong Kong 2025-26 · Revised estimate |
43 | PDF p.2 printed 29 |
79 Invest Hong Kong ........................................................... 43 45 |
| Establishment (number of posts) — Judiciary 2025-26 · Revised estimate |
2 068 | PDF p.2 printed 29 |
80 Judiciary .......................................................................... 2 068 (1) 2 050 (2) |
| Establishment (number of posts) — Labour Department 2025-26 · Revised estimate |
2 503 | PDF p.2 printed 29 |
90 Labour Department ......................................................... 2 503 (1) 2 447 (1) |
| Establishment (number of posts) — Lands Department 2025-26 · Revised estimate |
4 535 | PDF p.2 printed 29 |
91 Lands Department ........................................................... 4 535 (1) 4 396 (1) |
| Establishment (number of posts) — Legal Aid Department 2025-26 · Revised estimate |
556 | PDF p.2 printed 29 |
94 Legal Aid Department ..................................................... 556 543 |
| Establishment (number of posts) — Leisure and Cultural Services Department 2025-26 · Revised estimate |
10 329 | PDF p.2 printed 29 |
95 Leisure and Cultural Services Department ..................... 10 329 10 118 |
| Establishment (number of posts) — Government Secretariat: Overseas Economic and Trade Offices 2025-26 · Revised estimate |
228 | PDF p.2 printed 29 |
96 Government Secretariat: Overseas Economic and Trade Offices .............................................................. 228 239 |
| Establishment (number of posts) — Marine Department 2025-26 · Revised estimate |
1 473 | PDF p.2 printed 29 |
100 Marine Department ......................................................... 1 473 1 441 |
| Establishment (number of posts) — Official Receiver’s Office 2025-26 · Revised estimate |
277 | PDF p.2 printed 29 |
116 Official Receiver’s Office ............................................... 277 270 |
| Establishment (number of posts) — Planning Department 2025-26 · Revised estimate |
957 | PDF p.2 printed 29 |
118 Planning Department ....................................................... 957 (1) 924 |
| Establishment (number of posts) — Government Secretariat: Innovation, Technology and Industry Bureau 2025-26 · Revised estimate |
78 | PDF p.2 printed 29 |
135 Government Secretariat: Innovation, Technology and Industry Bureau .......................................................... 78 77 |
| Establishment (number of posts) — Public Service Commission Secretariat 2025-26 · Revised estimate |
34 | PDF p.2 printed 29 |
136 Public Service Commission Secretariat .......................... 34 33 |
| Establishment (number of posts) — Government Secretariat: Health Bureau 2025-26 · Revised estimate |
248 | PDF p.2 printed 29 |
140 Government Secretariat: Health Bureau ......................... 248 240 |
| Establishment (number of posts) — Government Secretariat: Labour and Welfare Bureau 2025-26 · Revised estimate |
159 | PDF p.2 printed 29 |
141 Government Secretariat: Labour and Welfare Bureau .... 159 (3) 156 (3) |
| Establishment (number of posts) — Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary 2025-26 · Revised estimate |
551 | PDF p.2 printed 29 |
142 Government Secretariat: Offices of the Chief Secretary for Administration and the Financial Secretary ..................................................................... 551 (1) 533 |
| Establishment (number of posts) — Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) 2025-26 · Revised estimate |
201 | PDF p.2 printed 29 |
147 Government Secretariat: Financial Services and the Treasury Bureau (The Treasury Branch) .................... 201 197 |
| Establishment (number of posts) — Government Secretariat: Security Bureau 2025-26 · Revised estimate |
244 | PDF p.2 printed 29 |
151 Government Secretariat: Security Bureau ....................... 244 (2) 238 (2) |
| Establishment (number of posts) — Government Secretariat: Innovation and Technology Commission 2025-26 · Revised estimate |
356 | PDF p.2 printed 29 |
155 Government Secretariat: Innovation and Technology Commission ................................................................ 356 335 |
| Establishment (number of posts) — Government Secretariat: Transport and Logistics Bureau 2025-26 · Revised estimate |
210 | PDF p.2 printed 29 |
158 Government Secretariat: Transport and Logistics Bureau ......................................................................... 210 (1) 203 |
| Establishment (number of posts) — Radio Television Hong Kong 2025-26 · Revised estimate |
758 | PDF p.2 printed 29 |
160 Radio Television Hong Kong.......................................... 758 743 |
| Establishment (number of posts) — Rating and Valuation Department 2025-26 · Revised estimate |
968 | PDF p.2 printed 29 |
162 Rating and Valuation Department ................................... 968 943 |
| Establishment (number of posts) — Registration and Electoral Office 2025-26 · Revised estimate |
316 | PDF p.2 printed 29 |
163 Registration and Electoral Office .................................... 316 (2) 302 (2) |
| Establishment (number of posts) — Hong Kong Observatory 2025-26 · Revised estimate |
366 | PDF p.2 printed 29 |
168 Hong Kong Observatory ................................................. 366 357 |
| Establishment (number of posts) — Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service 2025-26 · Revised estimate |
31 | PDF p.2 printed 29 |
174 Joint Secretariat for the Advisory Bodies on Civil Service and Judicial Salaries and Conditions of Service ........................................................................ 31 30 |
| Establishment (number of posts) — Office for Film, Newspaper and Article Administration 2025-26 · Revised estimate |
65 | PDF p.2 printed 29 |
180 Office for Film, Newspaper and Article Administration ............................................................ 65 63 |
| Establishment (number of posts) — Secretariat, Commissioner on Interception of Communications and Surveillance 2026-27 · Estimate |
23 | PDF p.3 printed 30 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ............................. 23 23 |
| Establishment (number of posts) — Social Welfare Department 2026-27 · Estimate |
6 380 | PDF p.3 printed 30 |
170 Social Welfare Department ............................................. 6 520 6 380 |
| Establishment (number of posts) — Working Family and Student Financial Assistance Agency 2026-27 · Estimate |
1 326 | PDF p.3 printed 30 |
173 Working Family and Student Financial Assistance Agency ........................................................................ 1 353 1 326 |
| Establishment (number of posts) — Trade and Industry Department 2026-27 · Estimate |
499 | PDF p.3 printed 30 |
181 Trade and Industry Department....................................... 509 499 |
| Establishment (number of posts) — Transport Department 2026-27 · Estimate |
1 833 | PDF p.3 printed 30 |
186 Transport Department ..................................................... 1 894 (4) 1 833 (1) |
| Establishment (number of posts) — Treasury 2026-27 · Estimate |
497 | PDF p.3 printed 30 |
188 Treasury........................................................................... 507 497 |
| Establishment (number of posts) — University Grants Committee 2026-27 · Estimate |
85 | PDF p.3 printed 30 |
190 University Grants Committee ......................................... 87 85 |
| Establishment (number of posts) — Water Supplies Department 2026-27 · Estimate |
4 514 | PDF p.3 printed 30 |
194 Water Supplies Department ............................................ 4 618 4 514 |
| Establishment (number of posts) — Secretariat, Commissioner on Interception of Communications and Surveillance 2025-26 · Revised estimate |
23 | PDF p.3 printed 30 |
169 Secretariat, Commissioner on Interception of Communications and Surveillance ............................. 23 23 |
| Establishment (number of posts) — Social Welfare Department 2025-26 · Revised estimate |
6 520 | PDF p.3 printed 30 |
170 Social Welfare Department ............................................. 6 520 6 380 |
| Establishment (number of posts) — Working Family and Student Financial Assistance Agency 2025-26 · Revised estimate |
1 353 | PDF p.3 printed 30 |
173 Working Family and Student Financial Assistance Agency ........................................................................ 1 353 1 326 |
| Establishment (number of posts) — Trade and Industry Department 2025-26 · Revised estimate |
509 | PDF p.3 printed 30 |
181 Trade and Industry Department....................................... 509 499 |
| Establishment (number of posts) — Transport Department 2025-26 · Revised estimate |
1 894 | PDF p.3 printed 30 |
186 Transport Department ..................................................... 1 894 (4) 1 833 (1) |
| Establishment (number of posts) — Treasury 2025-26 · Revised estimate |
507 | PDF p.3 printed 30 |
188 Treasury........................................................................... 507 497 |
| Establishment (number of posts) — University Grants Committee 2025-26 · Revised estimate |
87 | PDF p.3 printed 30 |
190 University Grants Committee ......................................... 87 85 |
| Establishment (number of posts) — Water Supplies Department 2025-26 · Revised estimate |
4 618 | PDF p.3 printed 30 |
194 Water Supplies Department ............................................ 4 618 4 514 |
The 2026-27 Budget – Appendices to the Budget Speech – Appendix B: Analysis of Expenditure and Revenue (150)
https://www.budget.gov.hk/2026/eng/pdf/e_appendices_b.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Housing Authority 2026-27 · Estimate |
57,058 | PDF p.4 printed 18 |
Housing Authority 57,058 |
| Capital Investment Fund 2026-27 · Estimate |
3,767 | PDF p.4 printed 18 |
Capital Investment Fund 3,767 |
| Innovation and Technology Fund 2026-27 · Estimate |
10,270 | PDF p.4 printed 18 |
Innovation and Technology Fund 10,270 |
| Loan Fund 2026-27 · Estimate |
3,784 | PDF p.4 printed 18 |
Loan Fund 3,784 |
| Lotteries Fund 2026-27 · Estimate |
4,190 | PDF p.4 printed 18 |
Lotteries Fund 4,190 |
| General Revenue Account — total 2026-27 · Estimate |
648,408 | PDF p.4 printed 18 |
648,408 |
| Capital Works Reserve Fund 2026-27 · Estimate |
172,997 | PDF p.4 printed 18 |
Capital Works Reserve Fund 172,997 |
| Government Expenditure 2026-27 · Estimate |
843,416 | PDF p.4 printed 18 |
Government Expenditure 843,416 |
| Trading Funds 2026-27 · Estimate |
4,250 | PDF p.4 printed 18 |
Trading Funds 4,250 |
| Public Expenditure 2026-27 · Estimate |
904,724 | PDF p.4 printed 18 |
Public Expenditure 904,724 |
| Security — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
2.9 | PDF p.9 printed 23 |
Security 59,167 58,840 60,517 2.9 1.4 |
| Social Welfare — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.9 | PDF p.9 printed 23 |
Social Welfare 116,887 123,614 135,865 9.9 7.3 |
| Infrastructure — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
4.8 | PDF p.9 printed 23 |
Infrastructure 33,406 33,129 34,727 4.8 2.7 |
| Health — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
4.0 | PDF p.9 printed 23 |
Health 109,247 114,347 118,881 4.0 2.4 |
| Support — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
5.0 | PDF p.9 printed 23 |
Support 73,663 77,410 81,310 5.0 3.9 |
| Economic — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
5.0 | PDF p.9 printed 23 |
Economic 18,320 18,292 19,202 5.0 2.2 |
| Education — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
0.3 | PDF p.9 printed 23 |
Education 105,281 101,991 102,308 0.3 -1.0 |
| Community and External Affairs — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
2.7 | PDF p.9 printed 23 |
Community and External Affairs 18,039 18,418 18,913 2.7 0.6 |
| Environment and Food — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
4.9 | PDF p.9 printed 23 |
Environment and Food 25,358 25,484 26,728 4.9 2.7 |
| Housing — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
45.3 | PDF p.9 printed 23 |
Housing 765 844 1,226 45.3 39.5 |
| Total (Recurrent Government Expenditure) — Recurrent Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
4.8 | PDF p.9 printed 23 |
560,133 572,369 599,677 4.8 3.0 |
| Education — Recurrent Government Expenditure 2026-27 · Estimate |
102,308 | PDF p.9 printed 23 |
Education 105,281 101,991 102,308 0.3 -1.0 |
| Education — Recurrent Government Expenditure 2024-25 · Actual |
105,281 | PDF p.9 printed 23 |
Education 105,281 101,991 102,308 0.3 -1.0 |
| Education — Recurrent Government Expenditure 2025-26 · Revised estimate |
101,991 | PDF p.9 printed 23 |
Education 105,281 101,991 102,308 0.3 -1.0 |
| Social Welfare — Recurrent Government Expenditure 2026-27 · Estimate |
135,865 | PDF p.9 printed 23 |
Social Welfare 116,887 123,614 135,865 9.9 7.3 |
| Social Welfare — Recurrent Government Expenditure 2024-25 · Actual |
116,887 | PDF p.9 printed 23 |
Social Welfare 116,887 123,614 135,865 9.9 7.3 |
| Social Welfare — Recurrent Government Expenditure 2025-26 · Revised estimate |
123,614 | PDF p.9 printed 23 |
Social Welfare 116,887 123,614 135,865 9.9 7.3 |
| Health — Recurrent Government Expenditure 2026-27 · Estimate |
118,881 | PDF p.9 printed 23 |
Health 109,247 114,347 118,881 4.0 2.4 |
| Health — Recurrent Government Expenditure 2024-25 · Actual |
109,247 | PDF p.9 printed 23 |
Health 109,247 114,347 118,881 4.0 2.4 |
| Health — Recurrent Government Expenditure 2025-26 · Revised estimate |
114,347 | PDF p.9 printed 23 |
Health 109,247 114,347 118,881 4.0 2.4 |
| Security — Recurrent Government Expenditure 2026-27 · Estimate |
60,517 | PDF p.9 printed 23 |
Security 59,167 58,840 60,517 2.9 1.4 |
| Security — Recurrent Government Expenditure 2024-25 · Actual |
59,167 | PDF p.9 printed 23 |
Security 59,167 58,840 60,517 2.9 1.4 |
| Security — Recurrent Government Expenditure 2025-26 · Revised estimate |
58,840 | PDF p.9 printed 23 |
Security 59,167 58,840 60,517 2.9 1.4 |
| Infrastructure — Recurrent Government Expenditure 2026-27 · Estimate |
34,727 | PDF p.9 printed 23 |
Infrastructure 33,406 33,129 34,727 4.8 2.7 |
| Infrastructure — Recurrent Government Expenditure 2024-25 · Actual |
33,406 | PDF p.9 printed 23 |
Infrastructure 33,406 33,129 34,727 4.8 2.7 |
| Infrastructure — Recurrent Government Expenditure 2025-26 · Revised estimate |
33,129 | PDF p.9 printed 23 |
Infrastructure 33,406 33,129 34,727 4.8 2.7 |
| Environment and Food — Recurrent Government Expenditure 2026-27 · Estimate |
26,728 | PDF p.9 printed 23 |
Environment and Food 25,358 25,484 26,728 4.9 2.7 |
| Environment and Food — Recurrent Government Expenditure 2024-25 · Actual |
25,358 | PDF p.9 printed 23 |
Environment and Food 25,358 25,484 26,728 4.9 2.7 |
| Environment and Food — Recurrent Government Expenditure 2025-26 · Revised estimate |
25,484 | PDF p.9 printed 23 |
Environment and Food 25,358 25,484 26,728 4.9 2.7 |
| Economic — Recurrent Government Expenditure 2026-27 · Estimate |
19,202 | PDF p.9 printed 23 |
Economic 18,320 18,292 19,202 5.0 2.2 |
| Economic — Recurrent Government Expenditure 2024-25 · Actual |
18,320 | PDF p.9 printed 23 |
Economic 18,320 18,292 19,202 5.0 2.2 |
| Economic — Recurrent Government Expenditure 2025-26 · Revised estimate |
18,292 | PDF p.9 printed 23 |
Economic 18,320 18,292 19,202 5.0 2.2 |
| Housing — Recurrent Government Expenditure 2026-27 · Estimate |
1,226 | PDF p.9 printed 23 |
Housing 765 844 1,226 45.3 39.5 |
| Housing — Recurrent Government Expenditure 2024-25 · Actual |
765 | PDF p.9 printed 23 |
Housing 765 844 1,226 45.3 39.5 |
| Housing — Recurrent Government Expenditure 2025-26 · Revised estimate |
844 | PDF p.9 printed 23 |
Housing 765 844 1,226 45.3 39.5 |
| Community and External Affairs — Recurrent Government Expenditure 2026-27 · Estimate |
18,913 | PDF p.9 printed 23 |
Community and External Affairs 18,039 18,418 18,913 2.7 0.6 |
| Community and External Affairs — Recurrent Government Expenditure 2024-25 · Actual |
18,039 | PDF p.9 printed 23 |
Community and External Affairs 18,039 18,418 18,913 2.7 0.6 |
| Community and External Affairs — Recurrent Government Expenditure 2025-26 · Revised estimate |
18,418 | PDF p.9 printed 23 |
Community and External Affairs 18,039 18,418 18,913 2.7 0.6 |
| Support — Recurrent Government Expenditure 2026-27 · Estimate |
81,310 | PDF p.9 printed 23 |
Support 73,663 77,410 81,310 5.0 3.9 |
| Support — Recurrent Government Expenditure 2024-25 · Actual |
73,663 | PDF p.9 printed 23 |
Support 73,663 77,410 81,310 5.0 3.9 |
| Support — Recurrent Government Expenditure 2025-26 · Revised estimate |
77,410 | PDF p.9 printed 23 |
Support 73,663 77,410 81,310 5.0 3.9 |
| Housing — Total Public Expenditure 2026-27 · Estimate |
64,474 | PDF p.11 printed 25 |
Housing 51,310 60,620 64,474 6.4 3.6 |
| Education — Total Public Expenditure 2026-27 · Estimate |
111,975 | PDF p.11 printed 25 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Education — Total Public Expenditure 2024-25 · Actual |
113,783 | PDF p.11 printed 25 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Education — Total Public Expenditure 2025-26 · Revised estimate |
110,904 | PDF p.11 printed 25 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Education — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
1.0 | PDF p.11 printed 25 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Social Welfare — Total Public Expenditure 2026-27 · Estimate |
148,140 | PDF p.11 printed 25 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Social Welfare — Total Public Expenditure 2024-25 · Actual |
122,123 | PDF p.11 printed 25 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Social Welfare — Total Public Expenditure 2025-26 · Revised estimate |
129,519 | PDF p.11 printed 25 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Social Welfare — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
14.4 | PDF p.11 printed 25 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Health — Total Public Expenditure 2026-27 · Estimate |
153,102 | PDF p.11 printed 25 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Health — Total Public Expenditure 2024-25 · Actual |
130,340 | PDF p.11 printed 25 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Health — Total Public Expenditure 2025-26 · Revised estimate |
144,823 | PDF p.11 printed 25 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Health — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
5.7 | PDF p.11 printed 25 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Security — Total Public Expenditure 2026-27 · Estimate |
71,516 | PDF p.11 printed 25 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Security — Total Public Expenditure 2024-25 · Actual |
65,746 | PDF p.11 printed 25 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Security — Total Public Expenditure 2025-26 · Revised estimate |
65,127 | PDF p.11 printed 25 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Security — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.8 | PDF p.11 printed 25 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Infrastructure — Total Public Expenditure 2026-27 · Estimate |
125,267 | PDF p.11 printed 25 |
Infrastructure 99,830 114,803 125,267 9.1 6.5 |
| Infrastructure — Total Public Expenditure 2024-25 · Actual |
99,830 | PDF p.11 printed 25 |
Infrastructure 99,830 114,803 125,267 9.1 6.5 |
| Infrastructure — Total Public Expenditure 2025-26 · Revised estimate |
114,803 | PDF p.11 printed 25 |
Infrastructure 99,830 114,803 125,267 9.1 6.5 |
| Infrastructure — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.1 | PDF p.11 printed 25 |
Infrastructure 99,830 114,803 125,267 9.1 6.5 |
| Environment and Food — Total Public Expenditure 2026-27 · Estimate |
51,256 | PDF p.11 printed 25 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Environment and Food — Total Public Expenditure 2024-25 · Actual |
47,756 | PDF p.11 printed 25 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Environment and Food — Total Public Expenditure 2025-26 · Revised estimate |
50,854 | PDF p.11 printed 25 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Environment and Food — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
0.8 | PDF p.11 printed 25 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Economic — Total Public Expenditure 2026-27 · Estimate |
60,861 | PDF p.11 printed 25 |
Economic 58,725 55,879 60,861 8.9 6.7 |
| Economic — Total Public Expenditure 2024-25 · Actual |
58,725 | PDF p.11 printed 25 |
Economic 58,725 55,879 60,861 8.9 6.7 |
| Economic — Total Public Expenditure 2025-26 · Revised estimate |
55,879 | PDF p.11 printed 25 |
Economic 58,725 55,879 60,861 8.9 6.7 |
| Economic — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
8.9 | PDF p.11 printed 25 |
Economic 58,725 55,879 60,861 8.9 6.7 |
| Housing — Total Public Expenditure 2024-25 · Actual |
51,310 | PDF p.11 printed 25 |
Housing 51,310 60,620 64,474 6.4 3.6 |
| Housing — Total Public Expenditure 2025-26 · Revised estimate |
60,620 | PDF p.11 printed 25 |
Housing 51,310 60,620 64,474 6.4 3.6 |
| Housing — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
6.4 | PDF p.11 printed 25 |
Housing 51,310 60,620 64,474 6.4 3.6 |
| Community and External Affairs — Total Public Expenditure 2026-27 · Estimate |
27,990 | PDF p.11 printed 25 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Community and External Affairs — Total Public Expenditure 2024-25 · Actual |
30,374 | PDF p.11 printed 25 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Community and External Affairs — Total Public Expenditure 2025-26 · Revised estimate |
27,160 | PDF p.11 printed 25 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Community and External Affairs — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
3.1 | PDF p.11 printed 25 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Support — Total Public Expenditure 2026-27 · Estimate |
90,143 | PDF p.11 printed 25 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Support — Total Public Expenditure 2024-25 · Actual |
81,236 | PDF p.11 printed 25 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Support — Total Public Expenditure 2025-26 · Revised estimate |
84,528 | PDF p.11 printed 25 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Support — Total Public Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
6.6 | PDF p.11 printed 25 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Education — Total Government Expenditure 2024-25 · Actual |
113,783 | PDF p.12 printed 26 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Education — Total Government Expenditure 2025-26 · Revised estimate |
110,904 | PDF p.12 printed 26 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Education — Total Government Expenditure 2026-27 · Estimate |
111,975 | PDF p.12 printed 26 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Social Welfare — Total Government Expenditure 2024-25 · Actual |
122,123 | PDF p.12 printed 26 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Social Welfare — Total Government Expenditure 2025-26 · Revised estimate |
129,519 | PDF p.12 printed 26 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Social Welfare — Total Government Expenditure 2026-27 · Estimate |
148,140 | PDF p.12 printed 26 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Health — Total Government Expenditure 2024-25 · Actual |
130,340 | PDF p.12 printed 26 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Health — Total Government Expenditure 2025-26 · Revised estimate |
144,823 | PDF p.12 printed 26 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Health — Total Government Expenditure 2026-27 · Estimate |
153,102 | PDF p.12 printed 26 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Security — Total Government Expenditure 2024-25 · Actual |
65,746 | PDF p.12 printed 26 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Security — Total Government Expenditure 2025-26 · Revised estimate |
65,127 | PDF p.12 printed 26 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Security — Total Government Expenditure 2026-27 · Estimate |
71,516 | PDF p.12 printed 26 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Infrastructure — Total Government Expenditure 2024-25 · Actual |
99,546 | PDF p.12 printed 26 |
Infrastructure 99,546 114,482 124,923 9.1 6.5 |
| Infrastructure — Total Government Expenditure 2025-26 · Revised estimate |
114,482 | PDF p.12 printed 26 |
Infrastructure 99,546 114,482 124,923 9.1 6.5 |
| Infrastructure — Total Government Expenditure 2026-27 · Estimate |
124,923 | PDF p.12 printed 26 |
Infrastructure 99,546 114,482 124,923 9.1 6.5 |
| Environment and Food — Total Government Expenditure 2024-25 · Actual |
47,756 | PDF p.12 printed 26 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Environment and Food — Total Government Expenditure 2025-26 · Revised estimate |
50,854 | PDF p.12 printed 26 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Environment and Food — Total Government Expenditure 2026-27 · Estimate |
51,256 | PDF p.12 printed 26 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Economic — Total Government Expenditure 2024-25 · Actual |
54,913 | PDF p.12 printed 26 |
Economic 54,913 51,937 56,955 9.7 7.4 |
| Economic — Total Government Expenditure 2025-26 · Revised estimate |
51,937 | PDF p.12 printed 26 |
Economic 54,913 51,937 56,955 9.7 7.4 |
| Economic — Total Government Expenditure 2026-27 · Estimate |
56,955 | PDF p.12 printed 26 |
Economic 54,913 51,937 56,955 9.7 7.4 |
| Housing — Total Government Expenditure 2024-25 · Actual |
7,403 | PDF p.12 printed 26 |
Housing 7,403 9,837 7,416 -24.6 -26.4 |
| Housing — Total Government Expenditure 2025-26 · Revised estimate |
9,837 | PDF p.12 printed 26 |
Housing 7,403 9,837 7,416 -24.6 -26.4 |
| Housing — Total Government Expenditure 2026-27 · Estimate |
7,416 | PDF p.12 printed 26 |
Housing 7,403 9,837 7,416 -24.6 -26.4 |
| Community and External Affairs — Total Government Expenditure 2024-25 · Actual |
30,374 | PDF p.12 printed 26 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Community and External Affairs — Total Government Expenditure 2025-26 · Revised estimate |
27,160 | PDF p.12 printed 26 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Community and External Affairs — Total Government Expenditure 2026-27 · Estimate |
27,990 | PDF p.12 printed 26 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Support — Total Government Expenditure 2024-25 · Actual |
81,236 | PDF p.12 printed 26 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Support — Total Government Expenditure 2025-26 · Revised estimate |
84,528 | PDF p.12 printed 26 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Support — Total Government Expenditure 2026-27 · Estimate |
90,143 | PDF p.12 printed 26 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Total (Total Government Expenditure) 2024-25 · Actual |
753,220 | PDF p.12 printed 26 |
753,220 789,171 843,416 6.9 4.8 |
| Total (Total Government Expenditure) 2025-26 · Revised estimate |
789,171 | PDF p.12 printed 26 |
753,220 789,171 843,416 6.9 4.8 |
| Total (Total Government Expenditure) 2026-27 · Estimate |
843,416 | PDF p.12 printed 26 |
753,220 789,171 843,416 6.9 4.8 |
| Health — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
5.7 | PDF p.12 printed 26 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Social Welfare — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
14.4 | PDF p.12 printed 26 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Infrastructure — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.1 | PDF p.12 printed 26 |
Infrastructure 99,546 114,482 124,923 9.1 6.5 |
| Education — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
1.0 | PDF p.12 printed 26 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Support — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
6.6 | PDF p.12 printed 26 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Security — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.8 | PDF p.12 printed 26 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Economic — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
9.7 | PDF p.12 printed 26 |
Economic 54,913 51,937 56,955 9.7 7.4 |
| Environment and Food — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
0.8 | PDF p.12 printed 26 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Community and External Affairs — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
3.1 | PDF p.12 printed 26 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Housing — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
-24.6 | PDF p.12 printed 26 |
Housing 7,403 9,837 7,416 -24.6 -26.4 |
| Total (Total Government Expenditure) — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in nominal terms) 2026-27 · Estimate |
6.9 | PDF p.12 printed 26 |
753,220 789,171 843,416 6.9 4.8 |
| Total (Total Government Expenditure) — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
4.8 | PDF p.12 printed 26 |
753,220 789,171 843,416 6.9 4.8 |
| Social Welfare — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
11.6 | PDF p.12 printed 26 |
Social Welfare 122,123 129,519 148,140 14.4 11.6 |
| Infrastructure — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
6.5 | PDF p.12 printed 26 |
Infrastructure 99,546 114,482 124,923 9.1 6.5 |
| Health — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
3.8 | PDF p.12 printed 26 |
Health 130,340 144,823 153,102 5.7 3.8 |
| Security — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
8.1 | PDF p.12 printed 26 |
Security 65,746 65,127 71,516 9.8 8.1 |
| Support — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
5.3 | PDF p.12 printed 26 |
Support 81,236 84,528 90,143 6.6 5.3 |
| Economic — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
7.4 | PDF p.12 printed 26 |
Economic 54,913 51,937 56,955 9.7 7.4 |
| Education — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
-0.4 | PDF p.12 printed 26 |
Education 113,783 110,904 111,975 1.0 -0.4 |
| Community and External Affairs — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
0.8 | PDF p.12 printed 26 |
Community and External Affairs 30,374 27,160 27,990 3.1 0.8 |
| Environment and Food — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
-1.3 | PDF p.12 printed 26 |
Environment and Food 47,756 50,854 51,256 0.8 -1.3 |
| Housing — Total Government Expenditure: % change 2026-27 estimate over 2025-26 revised estimate (in real terms) 2026-27 · Estimate |
-26.4 | PDF p.12 printed 26 |
Housing 7,403 9,837 7,416 -24.6 -26.4 |
| Major capital projects planned to begin in 2026-27 — Education (total project estimates) 2026-27 · Estimate |
1.8 | PDF p.14 printed 28 |
Education 1.8 |
| Major capital projects planned to begin in 2026-27 — Infrastructure (total project estimates) 2026-27 · Estimate |
41.6 | PDF p.14 printed 28 |
Infrastructure 41.6 |
| Major capital projects planned to begin in 2026-27 — Environment and Food (total project estimates) 2026-27 · Estimate |
40.7 | PDF p.14 printed 28 |
Environment and Food 40.7 |
| Major capital projects planned to begin in 2026-27 — Support (total project estimates) 2026-27 · Estimate |
3.3 | PDF p.14 printed 28 |
Support 3.3 |
The 2026-27 Budget – Budget Speech Appendix A: Medium Range Forecast (83)
https://www.budget.gov.hk/2026/eng/pdf/e_appendices_a.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Assumed trend real GDP growth (MRF planning assumption) 2027 · Forecast |
3 % | PDF p.6 printed 6 |
assumed to be 3% per annum in the four-year period from 2027 to 2030. |
| Assumed trend real GDP growth (MRF planning assumption) 2028 · Forecast |
3 % | PDF p.6 printed 6 |
assumed to be 3% per annum in the four-year period from 2027 to 2030. |
| Assumed trend real GDP growth (MRF planning assumption) 2029 · Forecast |
3 % | PDF p.6 printed 6 |
assumed to be 3% per annum in the four-year period from 2027 to 2030. |
| Assumed trend real GDP growth (MRF planning assumption) 2030 · Forecast |
3 % | PDF p.6 printed 6 |
assumed to be 3% per annum in the four-year period from 2027 to 2030. |
| Assumed trend increase in GDP deflator 2027 · Forecast |
2 % | PDF p.6 printed 6 |
the GDP deflator is assumed to increase at a trend rate of 2% per annum. |
| Assumed trend increase in GDP deflator 2028 · Forecast |
2 % | PDF p.6 printed 6 |
the GDP deflator is assumed to increase at a trend rate of 2% per annum. |
| Assumed trend increase in GDP deflator 2029 · Forecast |
2 % | PDF p.6 printed 6 |
the GDP deflator is assumed to increase at a trend rate of 2% per annum. |
| Assumed trend increase in GDP deflator 2030 · Forecast |
2 % | PDF p.6 printed 6 |
the GDP deflator is assumed to increase at a trend rate of 2% per annum. |
| Assumed trend nominal GDP growth 2027 · Forecast |
5 % | PDF p.6 printed 6 |
to be 5% per annum. |
| Assumed trend nominal GDP growth 2028 · Forecast |
5 % | PDF p.6 printed 6 |
to be 5% per annum. |
| Assumed trend nominal GDP growth 2029 · Forecast |
5 % | PDF p.6 printed 6 |
to be 5% per annum. |
| Assumed trend nominal GDP growth 2030 · Forecast |
5 % | PDF p.6 printed 6 |
to be 5% per annum. |
| Government expenditure (consolidated) 2027-28 · Forecast |
866,602 HK$ million | PDF p.7 printed 7 |
Less: Government expenditure 789,171 843,416 866,602 |
| Government expenditure (consolidated) 2026-27 · Estimate |
843,416 HK$ million | PDF p.7 printed 7 |
Less: Government expenditure 789,171 843,416 |
| Government revenue (consolidated) 2026-27 · Estimate |
765,234 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 765,234 |
| Proceeds from issuance of government bonds 2026-27 · Estimate |
160,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 160,000 |
| Repayment of government bonds 2026-27 · Estimate |
59,708 HK$ million | PDF p.7 printed 7 |
Less: Repayment of government bonds 51,686 59,708 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2026-27 · Estimate |
22,110 HK$ million | PDF p.7 printed 7 |
Consolidated surplus after issuance and 2,905 22,110 |
| Government revenue (consolidated) 2025-26 · Revised estimate |
688,762 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 |
| Proceeds from issuance of government bonds 2025-26 · Revised estimate |
155,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 |
| Operating revenue 2026-27 · Estimate |
652,110 HK$ million | PDF p.7 printed 7 |
Operating revenue (Note (b)) 653,257 652,110 |
| Capital revenue 2026-27 · Estimate |
113,124 HK$ million | PDF p.7 printed 7 |
Capital revenue (Note (d)) 35,505 113,124 |
| Operating expenditure 2026-27 · Estimate |
640,200 HK$ million | PDF p.7 printed 7 |
Less: Operating expenditure (Note (c)) 601,971 640,200 |
| Capital expenditure 2026-27 · Estimate |
203,216 HK$ million | PDF p.7 printed 7 |
Less: Capital expenditure (Note (e)) 187,200 203,216 |
| Operating surplus/(deficit) 2026-27 · Estimate |
11,910 HK$ million | PDF p.7 printed 7 |
Operating surplus 51,286 11,910 |
| Capital surplus/(deficit) 2026-27 · Estimate |
−90,092 HK$ million | PDF p.7 printed 7 |
Capital deficit (151,695) (90,092) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2026-27 · Estimate |
−78,182 HK$ million | PDF p.7 printed 7 |
Consolidated deficit before issuance and (100,409) (78,182) |
| Fiscal reserves at 31 March 2026-27 · Estimate |
679,332 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 679,332 |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2027-28 · Forecast |
−72,146 HK$ million | PDF p.7 printed 7 |
Consolidated deficit before issuance and (100,409) (78,182) (72,146) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2028-29 · Forecast |
−106,066 HK$ million | PDF p.7 printed 7 |
Consolidated deficit before issuance and (100,409) (78,182) (72,146) (106,066) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2029-30 · Forecast |
−71,058 HK$ million | PDF p.7 printed 7 |
Consolidated deficit before issuance and (100,409) (78,182) (72,146) (106,066) (71,058) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2030-31 · Forecast |
−38,458 HK$ million | PDF p.7 printed 7 |
Consolidated deficit before issuance and (100,409) (78,182) (72,146) (106,066) (71,058) (38,458) |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2027-28 · Forecast |
7,931 HK$ million | PDF p.7 printed 7 |
Consolidated surplus after issuance and 2,905 22,110 7,931 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2028-29 · Forecast |
10,627 HK$ million | PDF p.7 printed 7 |
Consolidated surplus after issuance and 2,905 22,110 7,931 10,627 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2029-30 · Forecast |
17,371 HK$ million | PDF p.7 printed 7 |
Consolidated surplus after issuance and 2,905 22,110 7,931 10,627 17,371 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2030-31 · Forecast |
18,394 HK$ million | PDF p.7 printed 7 |
Consolidated surplus after issuance and 2,905 22,110 7,931 10,627 17,371 18,394 |
| Government expenditure (consolidated) 2030-31 · Forecast |
913,606 HK$ million | PDF p.7 printed 7 |
Less: Government expenditure 789,171 843,416 866,602 871,863 890,799 913,606 |
| Government revenue (consolidated) 2030-31 · Forecast |
875,148 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 765,234 794,456 765,797 819,741 875,148 |
| Fiscal reserves at 31 March 2025-26 · Revised estimate |
657,222 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 |
| Fiscal reserves at 31 March 2027-28 · Forecast |
687,263 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 679,332 687,263 |
| Fiscal reserves at 31 March 2028-29 · Forecast |
697,890 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 679,332 687,263 697,890 |
| Fiscal reserves at 31 March 2029-30 · Forecast |
715,261 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 679,332 687,263 697,890 715,261 |
| Fiscal reserves at 31 March 2030-31 · Forecast |
733,655 HK$ million | PDF p.7 printed 7 |
Fiscal reserves at 31 March 657,222 679,332 687,263 697,890 715,261 733,655 |
| Fiscal reserves in terms of number of months of government expenditure 2026-27 · Estimate |
10 | PDF p.7 printed 7 |
government expenditure 10 10 |
| Fiscal reserves in terms of number of months of government expenditure 2027-28 · Forecast |
10 | PDF p.7 printed 7 |
government expenditure 10 10 10 |
| Fiscal reserves in terms of number of months of government expenditure 2028-29 · Forecast |
10 | PDF p.7 printed 7 |
government expenditure 10 10 10 10 |
| Fiscal reserves in terms of number of months of government expenditure 2029-30 · Forecast |
10 | PDF p.7 printed 7 |
government expenditure 10 10 10 10 10 |
| Fiscal reserves in terms of number of months of government expenditure 2030-31 · Forecast |
10 | PDF p.7 printed 7 |
government expenditure 10 10 10 10 10 10 |
| Government revenue (consolidated) 2027-28 · Forecast |
794,456 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 765,234 794,456 |
| Government revenue (consolidated) 2028-29 · Forecast |
765,797 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 765,234 794,456 765,797 |
| Government expenditure (consolidated) 2028-29 · Forecast |
871,863 HK$ million | PDF p.7 printed 7 |
Less: Government expenditure 789,171 843,416 866,602 871,863 |
| Government revenue (consolidated) 2029-30 · Forecast |
819,741 HK$ million | PDF p.7 printed 7 |
Government revenue 688,762 765,234 794,456 765,797 819,741 |
| Government expenditure (consolidated) 2029-30 · Forecast |
890,799 HK$ million | PDF p.7 printed 7 |
Less: Government expenditure 789,171 843,416 866,602 871,863 890,799 |
| Proceeds from issuance of government bonds 2027-28 · Forecast |
210,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 160,000 210,000 |
| Repayment of government bonds 2027-28 · Forecast |
129,923 HK$ million | PDF p.7 printed 7 |
Less: Repayment of government bonds 51,686 59,708 129,923 |
| Proceeds from issuance of government bonds 2028-29 · Forecast |
220,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 160,000 210,000 220,000 |
| Repayment of government bonds 2028-29 · Forecast |
103,307 HK$ million | PDF p.7 printed 7 |
Less: Repayment of government bonds 51,686 59,708 129,923 103,307 |
| Proceeds from issuance of government bonds 2029-30 · Forecast |
190,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 160,000 210,000 220,000 190,000 |
| Repayment of government bonds 2029-30 · Forecast |
101,571 HK$ million | PDF p.7 printed 7 |
Less: Repayment of government bonds 51,686 59,708 129,923 103,307 101,571 |
| Proceeds from issuance of government bonds 2030-31 · Forecast |
190,000 HK$ million | PDF p.7 printed 7 |
Add: Proceeds from issuance of government 155,000 160,000 210,000 220,000 190,000 190,000 |
| Repayment of government bonds 2030-31 · Forecast |
133,148 HK$ million | PDF p.7 printed 7 |
Less: Repayment of government bonds 51,686 59,708 129,923 103,307 101,571 133,148 |
| Fiscal reserves as a percentage of GDP 2026-27 · Estimate |
19.5 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% 19.5% |
| Fiscal reserves as a percentage of GDP 2030-31 · Forecast |
17.3 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% 19.5% 18.8% 18.1% 17.7% 17.3% |
| Fiscal reserves in terms of number of months of government expenditure 2025-26 · Revised estimate |
10 | PDF p.7 printed 7 |
government expenditure 10 |
| Fiscal reserves as a percentage of GDP 2025-26 · Revised estimate |
19.7 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% |
| Fiscal reserves as a percentage of GDP 2027-28 · Forecast |
18.8 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% 19.5% 18.8% |
| Fiscal reserves as a percentage of GDP 2028-29 · Forecast |
18.1 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% 19.5% 18.8% 18.1% |
| Fiscal reserves as a percentage of GDP 2029-30 · Forecast |
17.7 % | PDF p.7 printed 7 |
In terms of percentage of GDP 19.7% 19.5% 18.8% 18.1% 17.7% |
| Operating surplus/(deficit) 2027-28 · Forecast |
26,442 HK$ million | PDF p.7 printed 7 |
Operating surplus 51,286 11,910 26,442 |
| Operating surplus/(deficit) 2028-29 · Forecast |
41,197 HK$ million | PDF p.7 printed 7 |
Operating surplus 51,286 11,910 26,442 41,197 |
| Operating surplus/(deficit) 2029-30 · Forecast |
52,162 HK$ million | PDF p.7 printed 7 |
Operating surplus 51,286 11,910 26,442 41,197 52,162 |
| Operating surplus/(deficit) 2030-31 · Forecast |
68,870 HK$ million | PDF p.7 printed 7 |
Operating surplus 51,286 11,910 26,442 41,197 52,162 68,870 |
| Capital surplus/(deficit) 2027-28 · Forecast |
−98,588 HK$ million | PDF p.7 printed 7 |
Capital deficit (151,695) (90,092) (98,588) |
| Capital surplus/(deficit) 2028-29 · Forecast |
−147,263 HK$ million | PDF p.7 printed 7 |
Capital deficit (151,695) (90,092) (98,588) (147,263) |
| Capital surplus/(deficit) 2029-30 · Forecast |
−123,220 HK$ million | PDF p.7 printed 7 |
Capital deficit (151,695) (90,092) (98,588) (147,263) (123,220) |
| Capital surplus/(deficit) 2030-31 · Forecast |
−107,328 HK$ million | PDF p.7 printed 7 |
Capital deficit (151,695) (90,092) (98,588) (147,263) (123,220) (107,328) |
| Investment income (operating account) 2026-27 · Estimate |
29,561 HK$ million | PDF p.9 printed 9 |
Investment income 26,052 29,561 |
| Investment income (capital account) 2026-27 · Estimate |
9,515 HK$ million | PDF p.10 printed 10 |
Investment income 9,435 9,515 |
| Land premium assumption: progressively rising to 2% of GDP from 2027-28 2027-28 · Forecast |
2 % | PDF p.10 printed 10 |
be progressively rising to 2% of GDP, which is lower than that of the past 20-year historical average ratio of |
| Capital expenditure — Capital Works Reserve Fund 2025-26 · Revised estimate |
161,298 | PDF p.10 printed 10 |
Capital Works Reserve Fund 161,298 172,997 183,755 180,416 175,769 177,669 |
| Gross Domestic Product (nominal, calendar year) 2026 · Estimate |
3,488,400 HK$ million | PDF p.11 printed 11 |
Gross Domestic Product 3,331,774 3,488,400 |
| Gross Domestic Product (nominal, calendar year) 2030 · Forecast |
4,240,100 HK$ million | PDF p.11 printed 11 |
Gross Domestic Product 3,331,774 3,488,400 3,662,800 3,845,900 4,038,200 4,240,100 |
| GRA transfer to funds (appropriated, not counted as government expenditure) 2026-27 · Estimate |
4,063 | PDF p.12 printed 12 |
Transfer to Funds 4,063 - - - - |
The 2026-27 Budget – Speech by the Financial Secretary (25 February 2026) (79)
https://www.budget.gov.hk/2026/eng/pdf/e_budget_speech_2026-27.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| AI application courses, seminars and competitions for students and the public 2026-27 · Estimate |
$50 million | PDF p.20 printed 15 |
users. We will allocate $50 million to take forward this initiative. |
| Introducing leading industry technologies to accelerate the Government’s digital-intelligence transformation 2026-27 · Estimate |
$100 million | PDF p.22 printed 17 |
allocate $100 million for introducing leading technologies from the |
| Injection into the Chinese Medicine Development Fund 2026-27 · Estimate |
$500 million | PDF p.24 printed 19 |
development of Chinese medicine. We will inject $500 million |
| Earmark for the first national manufacturing innovation centre outside the Mainland 2026-27 · Estimate |
$220 million | PDF p.25 printed 20 |
$220 million for establishing in Hong Kong the first national |
| Funding injection to the Hetao Hong Kong Park company (subject to LegCo approval) 2026-27 · Estimate |
$10 billion | PDF p.27 printed 22 |
LegCo) to inject a funding of $10 billion to the park company to |
| Initial capital for a dedicated San Tin Technopole development company (subject to LegCo approval) 2026-27 · Estimate |
$10 billion | PDF p.28 printed 23 |
inject $10 billion as initial capital to take forward the development, |
| Injection into the BUD Fund (Branding, Upgrading and Domestic Sales) 2026-27 · Estimate |
$200 million | PDF p.47 printed 42 |
Government will inject $200 million into the fund, raise the funding |
| Earmark for attracting large-scale international exhibitions (pilot) 2026-27 · Estimate |
$100 million | PDF p.48 printed 43 |
hub, the Government will earmark $100 million for attracting large- |
| Port dues concessions and incentives for green-fuel vessels (government subsidies) 2026-27 · Estimate |
$34 million | PDF p.52 printed 47 |
around $34 million. The Government will take forward a |
| Additional government-funded training places for construction professionals 2026-27 · Estimate |
$65 million | PDF p.59 printed 54 |
obtaining professional qualifications, we will allocate $65 million |
| Earmark for loans to support campus development in the Northern Metropolis University Town 2026-27 · Estimate |
$10 billion | PDF p.61 printed 56 |
$10 billion for providing loans to support campus development. |
| Allocation to the Hong Kong Tourism Board for 2026-27 2026-27 · Estimate |
$1,660 million | PDF p.63 printed 58 |
coming year, we will allocate $1,660 million to the Hong Kong |
| Additional funding for the Built Heritage Conservation Fund 2026-27 · Estimate |
$1 billion | PDF p.64 printed 59 |
will earmark an additional funding of $1 billion for the Built |
| NM Urban-rural Integration Fund (pilot scheme) 2026-27 · Estimate |
$200 million | PDF p.65 printed 60 |
integration”, we propose allocating $200 million for launching the |
| Injection into the sports portion of the Arts and Sport Development Fund 2026-27 · Estimate |
$1.2 billion | PDF p.66 printed 61 |
192. We will inject $1.2 billion into the sports portion of the Arts |
| Initial capital injection for the Hung Shui Kiu Industry Park Company Limited (subject to LegCo approval) 2026-27 · Estimate |
$10 billion | PDF p.71 printed 66 |
of $10 billion to support its initial operation and development needs, |
| Injection into the Construction Innovation and Technology Fund 2026-27 · Estimate |
$1 billion | PDF p.76 printed 71 |
We will inject $1 billion into the fund to continue supporting |
| Earmark for the Building Technology Research Institute studies 2026-27 · Estimate |
$100 million | PDF p.77 printed 72 |
construction costs, we have earmarked $100 million for |
| Tai Po fire: long-term housing arrangements for Wang Fuk Court (earmark) 2026-27 · Estimate |
$4 billion | PDF p.78 printed 73 |
long-term housing arrangements and earmarked $4 billion |
| Community Care Service Vouchers for the Elderly: +4 000 to 16 000 (estimated full-year expenditure) 2026-27 · Estimate |
$1.2 billion | PDF p.78 printed 73 |
estimated full-year expenditure of $1.2 billion and $1.97 billion |
| Residential Care Service Vouchers for the Elderly: +1 000 to 7 000 (estimated full-year expenditure) 2026-27 · Estimate |
$1.97 billion | PDF p.78 printed 73 |
estimated full-year expenditure of $1.2 billion and $1.97 billion |
| New building rehabilitation subsidy scheme replacing Operation Building Bright 2.0 (earmark) 2026-27 · Estimate |
$3 billion | PDF p.78 printed 73 |
We will earmark $3 billion accordingly. Moreover, we will |
| Extension of the Lift Modernisation Subsidy Scheme 2026-27 · Estimate |
$1 billion | PDF p.78 printed 73 |
allocate $1 billion to extend the Lift Modernisation Subsidy Scheme |
| Allocation to the URA for enhanced "Smart Tender" and subsidies 2026-27 · Estimate |
$300 million | PDF p.78 printed 73 |
measures, we propose allocating a total of $300 million to the URA. |
| Additional funding for the HYAB Funding Scheme for International Youth Exchange 2026-27 · Estimate |
$60 million | PDF p.79 printed 74 |
Mainland and allocating an additional $60 million for implementing |
| Bridging and support services for children from On-site Pre-school Rehabilitation Services entering primary school (additional annual expenditure) 2026-27 · Estimate |
$260 million | PDF p.80 printed 75 |
additional annual expenditure of about $260 million. |
| About 450 additional rehabilitation day, residential and pre-school places (additional annual expenditure) 2026-27 · Estimate |
$107 million | PDF p.80 printed 75 |
additional annual expenditure of about $107 million. For school |
| Women Empowerment Fund annual funding (from 2026-27) 2026-27 · Estimate |
$30 million | PDF p.80 printed 75 |
$30 million starting from the next financial year. |
| Re-employment Allowance Pilot Scheme provision for 2026-27 2026-27 · Estimate |
$222 million | PDF p.80 printed 75 |
will be increased to $222 million in the coming financial year. |
| Elderly Health Care Voucher Pilot Reward Scheme extended to end-2028 (additional expenditure) 2026-27 · Estimate |
$1 billion | PDF p.81 printed 76 |
expenditure of about $1 billion. |
| Productivity Enhancement Programme: further savings in 2026-27 over 2025-26 (2% cut in recurrent expenditure; CSSA, SSA and statutory expenditure unaffected) 2026-27 · Estimate |
$7.8 billion | PDF p.85 printed 80 |
and 2027-28, delivering further savings of about $7.8 billion and |
| Global minimum tax / Hong Kong minimum top-up tax on large MNE groups (consolidated revenue ≥ EUR750 million) 2027-28 · Forecast |
15 HK$ billion | PDF p.86 printed 81 |
revenue of about $15 billion for the Government annually |
| Transfer of accumulated surplus of the Bond Fund to the Consolidated Account 2026-27 · Estimate |
37 HK$ billion | PDF p.87 printed 82 |
about $37 billion after deducting outstanding bond balances and |
| Unspent balances brought back from funds established outside the Government's accounts (review of 36 funds) 2026-27 · Estimate |
15.8 HK$ billion | PDF p.87 printed 82 |
The above measures are expected to bring back about $15.8 billion |
| Transfer of Exchange Fund investment income to the Capital Works Reserve Fund 2026-27 · Estimate |
75 HK$ billion | PDF p.88 printed 83 |
transferring $75 billion in each of the coming two financial years, |
| Transfer of Exchange Fund investment income to the Capital Works Reserve Fund 2027-28 · Forecast |
75 HK$ billion | PDF p.88 printed 83 |
transferring $75 billion in each of the coming two financial years, |
| Capital works expenditure 2026-27 (about) 2026-27 · Estimate |
$128 billion | PDF p.88 printed 83 |
expenditure is estimated to be about $128 billion for 2026-27. |
| Additional earmark for works projects over the next two to three years (2025 Policy Address) 2026-27 · Estimate |
$30 billion | PDF p.88 printed 83 |
would earmark an additional $30 billion in the next two to three |
| Transfer from the Exchange Fund to the Capital Works Reserve Fund in each of 2026-27 and 2027-28 (financing, not expenditure) 2026-27 · Estimate |
$75 billion | PDF p.88 printed 83 |
transferring $75 billion in each of the coming two financial years, |
| Government expenditure as a percentage of nominal GDP 2026-27 · Estimate |
24.2 % | PDF p.91 printed 86 |
projected to be 24.2 per cent. |
| One-off reduction of salaries tax / tax under personal assessment – % of tax (YA2025/26) YA2025/26 · Actual |
100 % | PDF p.93 printed 88 |
the year of assessment 2025/26 by 100 per cent, subject to |
| One-off reduction – ceiling per case (YA2025/26) YA2025/26 · Actual |
3,000 HK$ | PDF p.93 printed 88 |
a ceiling of $3,000. The reduction will be reflected in the |
| Taxpayers benefiting from YA2025/26 one-off reduction (estimate) YA2025/26 · Estimate |
2,120,000 | PDF p.93 printed 88 |
measure will benefit about 2.12 million taxpayers and |
| Rates concession for domestic properties – ceiling per rateable property per quarter (first two quarters of 2026-27) 2026-27 · Estimate |
500 HK$ | PDF p.93 printed 88 |
two quarters of 2026/27, subject to a ceiling of $500 for |
| Domestic properties covered by rates concession 2026-27 · Estimate |
3,150,000 | PDF p.93 printed 88 |
involve about 3.15 million domestic properties and reduce |
| Revenue forgone – domestic rates concession 2026-27 2026-27 · Estimate |
3.1 HK$ billion | PDF p.93 printed 88 |
government revenue by about $3.1 billion; |
| One-off extra payment: one month of CSSA standard rate / Old Age Allowance / Old Age Living Allowance / Disability Allowance (and similar for Working Family Allowance) 2026-27 · Estimate |
$6.5 billion | PDF p.94 printed 89 |
$6.5 billion. |
| Increase basic and single parent allowances ($132,000 to $145,000) and married person's allowance ($264,000 to $290,000) YA2026/27 · Estimate |
3.56 HK$ billion | PDF p.94 printed 89 |
by about $3.56 billion a year; |
| Increase child allowance and additional child allowance ($130,000 to $140,000) YA2026/27 · Estimate |
680 HK$ million | PDF p.94 printed 89 |
about $680 million a year; and |
| Increase dependent parent/grandparent allowances and elderly residential care expenses deduction ceiling YA2026/27 · Estimate |
970 HK$ million | PDF p.94 printed 89 |
about $970 million a year. I will make the following three |
| Government expenditure as a percentage of GDP 2030-31 · Forecast |
21.5 % | PDF p.96 printed 91 |
from about 24.2 per cent for 2026-27 to about 21.5 per cent for |
| Average annual capital works expenditure over the Medium Range Forecast period (2026-27 to 2030-31) 2026-27 · Estimate |
$120 billion | PDF p.96 printed 91 |
expenditure will be about $120 billion, while recurrent government |
| Average rates payable, all domestic premises, 2026-27, before concession (per year) 2026-27 · Estimate |
7,332 HK$ | PDF p.106 printed Supplement (1) |
All Domestic 7,332 611 6,372 531 |
| Average rates payable, all domestic premises, 2026-27, after concession (per year) 2026-27 · Estimate |
6,372 HK$ | PDF p.106 printed Supplement (1) |
All Domestic 7,332 611 6,372 531 |
| Average rates payable, public domestic premises, 2026-27, after concession (per year) 2026-27 · Estimate |
2,484 HK$ | PDF p.106 printed Supplement (1) |
Public Domestic 3,468 289 2,484 207 |
| Basic allowance (YA2025/26) YA2025/26 · Actual |
132,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 132,000 145,000 13,000 10 |
| Married person's allowance (YA2025/26) YA2025/26 · Actual |
264,000 HK$ | PDF p.107 printed Supplement (2) |
Married 264,000 290,000 26,000 10 |
| Child allowance (each of 1st–9th child) (YA2025/26) YA2025/26 · Actual |
130,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 130,000 140,000 10,000 8 |
| Additional child allowance for newborn (each child) (YA2025/26) YA2025/26 · Actual |
130,000 HK$ | PDF p.107 printed Supplement (2) |
Additional allowance 130,000 140,000 10,000 8 |
| Dependent parent/grandparent allowance, aged 60+ (each) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 50,000 55,000 5,000 10 |
| Dependent parent/grandparent allowance, aged 55–59 (each) (YA2025/26) YA2025/26 · Actual |
25,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 25,000 27,500 2,500 10 |
| Additional dependent parent/grandparent allowance, aged 60+, living with taxpayer all year (each) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.107 printed Supplement (2) |
Additional allowance 50,000 55,000 5,000 10 |
| Claim period for additional (newborn) child allowance – years of assessment (YA2025/26) YA2025/26 · Actual |
1 | PDF p.107 printed Supplement (2) |
(Claim period for additional allowance) (1 year of (2 years of (Claim period |
| Mandatory contributions to MPF / recognised retirement schemes – deduction ceiling (YA2025/26) YA2025/26 · Actual |
18,000 HK$ | PDF p.107 printed Supplement (2) |
Contributions to Recognised Retirement Schemes 18,000 18,000 — — |
| Basic allowance (YA2026/27) YA2026/27 · Actual |
145,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 132,000 145,000 13,000 10 |
| Married person's allowance (YA2026/27) YA2026/27 · Actual |
290,000 HK$ | PDF p.107 printed Supplement (2) |
Married 264,000 290,000 26,000 10 |
| Child allowance (each of 1st–9th child) (YA2026/27) YA2026/27 · Actual |
140,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 130,000 140,000 10,000 8 |
| Additional child allowance for newborn (each child) (YA2026/27) YA2026/27 · Actual |
140,000 HK$ | PDF p.107 printed Supplement (2) |
Additional allowance 130,000 140,000 10,000 8 |
| Dependent parent/grandparent allowance, aged 60+ (each) (YA2026/27) YA2026/27 · Actual |
55,000 HK$ | PDF p.107 printed Supplement (2) |
Basic 50,000 55,000 5,000 10 |
| Dependent parent/grandparent allowance, aged 55–59 (each) (YA2026/27) YA2026/27 · Actual |
27,500 HK$ | PDF p.107 printed Supplement (2) |
Basic 25,000 27,500 2,500 10 |
| Additional dependent parent/grandparent allowance, aged 60+, living with taxpayer all year (each) (YA2026/27) YA2026/27 · Actual |
55,000 HK$ | PDF p.107 printed Supplement (2) |
Additional allowance 50,000 55,000 5,000 10 |
| Claim period for additional (newborn) child allowance – years of assessment (YA2026/27) YA2026/27 · Actual |
2 | PDF p.107 printed Supplement (2) |
(Claim period for additional allowance) (1 year of (2 years of (Claim period |
| Mandatory contributions to MPF / recognised retirement schemes – deduction ceiling (YA2026/27) YA2026/27 · Actual |
18,000 HK$ | PDF p.107 printed Supplement (2) |
Contributions to Recognised Retirement Schemes 18,000 18,000 — — |
| Employed persons, Q4 2025 (as cited in Budget supplement) 2025 · Statistic |
3,670,000 persons | PDF p.109 printed Supplement (4) |
3.67 million. |
| Real GDP growth forecast 2026 – lower end of range 2026 · Estimate |
2.5 % | PDF p.115 printed Supplement (10) |
Real GDP 2.5 to 3.5 |
| Real GDP growth forecast 2026 – upper end of range 2026 · Estimate |
3.5 % | PDF p.115 printed Supplement (10) |
Real GDP 2.5 to 3.5 |
| Nominal GDP growth forecast 2026 – lower end of range 2026 · Estimate |
4.2 % | PDF p.115 printed Supplement (10) |
Nominal GDP 4.2 to 5.2 |
| Nominal GDP growth forecast 2026 – upper end of range 2026 · Estimate |
5.2 % | PDF p.115 printed Supplement (10) |
Nominal GDP 4.2 to 5.2 |
| GDP deflator change forecast 2026 2026 · Estimate |
1.7 % | PDF p.115 printed Supplement (10) |
GDP Deflator 1.7 |
Estimates for the year ending 31 March 2027 – Volume I – Head 156 — Government Secretariat: Education Bureau (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (42)
https://www.budget.gov.hk/2026/eng/pdf/head156.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Government Secretariat: Education Bureau — Programme (1) Director of Bureau’s Office 2026-27 · Estimate |
14.9 | PDF p.14 printed 419 |
(1) Director of Bureau’s Office ......................... 14.9 14.9 14.9 14.9 |
| Government Secretariat: Education Bureau — Programme (1) Director of Bureau’s Office 2025-26 · Revised estimate |
14.9 | PDF p.14 printed 419 |
(1) Director of Bureau’s Office ......................... 14.9 14.9 14.9 14.9 |
| Government Secretariat: Education Bureau — Programme (1) Director of Bureau’s Office 2024-25 · Actual |
14.9 | PDF p.14 printed 419 |
(1) Director of Bureau’s Office ......................... 14.9 14.9 14.9 14.9 |
| Government Secretariat: Education Bureau — Programme (2) Pre-primary Education 2026-27 · Estimate |
4,520.8 | PDF p.14 printed 419 |
(2) Pre-primary Education ................................. 5,313.0 4,944.5 4,841.5 4,520.8 |
| Government Secretariat: Education Bureau — Programme (2) Pre-primary Education 2025-26 · Revised estimate |
4,841.5 | PDF p.14 printed 419 |
(2) Pre-primary Education ................................. 5,313.0 4,944.5 4,841.5 4,520.8 |
| Government Secretariat: Education Bureau — Programme (2) Pre-primary Education 2024-25 · Actual |
5,313.0 | PDF p.14 printed 419 |
(2) Pre-primary Education ................................. 5,313.0 4,944.5 4,841.5 4,520.8 |
| Government Secretariat: Education Bureau — Programme (3) Primary Education 2026-27 · Estimate |
24,445.3 | PDF p.14 printed 419 |
(3) Primary Education........................................ 25,001.8 24,883.1 24,892.7 24,445.3 |
| Government Secretariat: Education Bureau — Programme (3) Primary Education 2025-26 · Revised estimate |
24,892.7 | PDF p.14 printed 419 |
(3) Primary Education........................................ 25,001.8 24,883.1 24,892.7 24,445.3 |
| Government Secretariat: Education Bureau — Programme (3) Primary Education 2024-25 · Actual |
25,001.8 | PDF p.14 printed 419 |
(3) Primary Education........................................ 25,001.8 24,883.1 24,892.7 24,445.3 |
| Government Secretariat: Education Bureau — Programme (4) Secondary Education 2026-27 · Estimate |
31,905.4 | PDF p.14 printed 419 |
(4) Secondary Education.................................... 32,524.9 32,126.4 32,140.7 31,905.4 |
| Government Secretariat: Education Bureau — Programme (4) Secondary Education 2025-26 · Revised estimate |
32,140.7 | PDF p.14 printed 419 |
(4) Secondary Education.................................... 32,524.9 32,126.4 32,140.7 31,905.4 |
| Government Secretariat: Education Bureau — Programme (4) Secondary Education 2024-25 · Actual |
32,524.9 | PDF p.14 printed 419 |
(4) Secondary Education.................................... 32,524.9 32,126.4 32,140.7 31,905.4 |
| Government Secretariat: Education Bureau — Programme (5) Special Education 2026-27 · Estimate |
3,997.6 | PDF p.14 printed 419 |
(5) Special Education ......................................... 3,885.9 3,894.9 3,958.9 3,997.6 |
| Government Secretariat: Education Bureau — Programme (5) Special Education 2025-26 · Revised estimate |
3,958.9 | PDF p.14 printed 419 |
(5) Special Education ......................................... 3,885.9 3,894.9 3,958.9 3,997.6 |
| Government Secretariat: Education Bureau — Programme (5) Special Education 2024-25 · Actual |
3,885.9 | PDF p.14 printed 419 |
(5) Special Education ......................................... 3,885.9 3,894.9 3,958.9 3,997.6 |
| Government Secretariat: Education Bureau — Programme (6) Other Educational Services and Subsidies 2026-27 · Estimate |
1,468.8 | PDF p.14 printed 419 |
(6) Other Educational Services and Subsidies ...................................................... 1,290.2 1,510.6 1,486.8 1,468.8 |
| Government Secretariat: Education Bureau — Programme (6) Other Educational Services and Subsidies 2025-26 · Revised estimate |
1,486.8 | PDF p.14 printed 419 |
(6) Other Educational Services and Subsidies ...................................................... 1,290.2 1,510.6 1,486.8 1,468.8 |
| Government Secretariat: Education Bureau — Programme (6) Other Educational Services and Subsidies 2024-25 · Actual |
1,290.2 | PDF p.14 printed 419 |
(6) Other Educational Services and Subsidies ...................................................... 1,290.2 1,510.6 1,486.8 1,468.8 |
| Government Secretariat: Education Bureau — Programme (7) Post-secondary, Vocational and Professional Education 2026-27 · Estimate |
5,662.5 | PDF p.14 printed 419 |
(7) Post-secondary, Vocational and Professional Education ................................. 6,442.6 5,494.7 5,446.3 5,662.5 |
| Government Secretariat: Education Bureau — Programme (7) Post-secondary, Vocational and Professional Education 2025-26 · Revised estimate |
5,446.3 | PDF p.14 printed 419 |
(7) Post-secondary, Vocational and Professional Education ................................. 6,442.6 5,494.7 5,446.3 5,662.5 |
| Government Secretariat: Education Bureau — Programme (7) Post-secondary, Vocational and Professional Education 2024-25 · Actual |
6,442.6 | PDF p.14 printed 419 |
(7) Post-secondary, Vocational and Professional Education ................................. 6,442.6 5,494.7 5,446.3 5,662.5 |
| Government Secretariat: Education Bureau — Programme (8) Policy and Support 2026-27 · Estimate |
2,964.3 | PDF p.14 printed 419 |
(8) Policy and Support ....................................... 4,689.3 2,965.1 2,964.8 2,964.3 |
| Government Secretariat: Education Bureau — Programme (8) Policy and Support 2025-26 · Revised estimate |
2,964.8 | PDF p.14 printed 419 |
(8) Policy and Support ....................................... 4,689.3 2,965.1 2,964.8 2,964.3 |
| Government Secretariat: Education Bureau — Programme (8) Policy and Support 2024-25 · Actual |
4,689.3 | PDF p.14 printed 419 |
(8) Policy and Support ....................................... 4,689.3 2,965.1 2,964.8 2,964.3 |
| Education Bureau — Code of Aid for secondary schools (subvention within Subhead 000) 2026-27 · Estimate |
24,540,903 | PDF p.17 printed 422 |
- Code of Aid for secondary schools ........................................25,332,788 24,871,308 24,933,900 24,540,903 |
| Education Bureau — Code of Aid for primary schools (subvention within Subhead 000) 2026-27 · Estimate |
20,527,373 | PDF p.17 printed 422 |
- Code of Aid for primary schools ........................................... 21,173,985 20,920,930 21,016,565 20,527,373 |
| Education Bureau — Direct Subsidy Scheme (subvention within Subhead 000) 2026-27 · Estimate |
5,806,704 | PDF p.17 printed 422 |
- Direct Subsidy Scheme .......................................................... 5,535,272 5,678,177 5,716,106 5,806,704 |
| Education Bureau — Kindergarten Education Scheme (subvention within Subhead 000) 2026-27 · Estimate |
4,481,164 | PDF p.17 printed 422 |
- Kindergarten Education Scheme ........................................... 5,285,933 4,914,901 4,812,695 4,481,164 |
| Education Bureau — Code of Aid for special schools (subvention within Subhead 000) 2026-27 · Estimate |
3,883,670 | PDF p.17 printed 422 |
- Code of Aid for special schools ............................................. 3,791,708 3,783,230 3,847,228 3,883,670 |
| Education Bureau — Vocational Training Council (recurrent subvention) (subvention within Subhead 000) 2026-27 · Estimate |
2,804,391 | PDF p.17 printed 422 |
- Vocational Training Council ................................................. 4,192,754 2,854,915 2,907,915 2,804,391 |
| Education Bureau — Code of Aid for primary schools (subvention within Subhead 000) 2024-25 · Actual |
21,173,985 | PDF p.17 printed 422 |
- Code of Aid for primary schools ........................................... 21,173,985 20,920,930 21,016,565 20,527,373 |
| Education Bureau — Code of Aid for primary schools (subvention within Subhead 000) 2025-26 · Revised estimate |
21,016,565 | PDF p.17 printed 422 |
- Code of Aid for primary schools ........................................... 21,173,985 20,920,930 21,016,565 20,527,373 |
| Education Bureau — Code of Aid for secondary schools (subvention within Subhead 000) 2024-25 · Actual |
25,332,788 | PDF p.17 printed 422 |
- Code of Aid for secondary schools ........................................25,332,788 24,871,308 24,933,900 24,540,903 |
| Education Bureau — Code of Aid for secondary schools (subvention within Subhead 000) 2025-26 · Revised estimate |
24,933,900 | PDF p.17 printed 422 |
- Code of Aid for secondary schools ........................................25,332,788 24,871,308 24,933,900 24,540,903 |
| Education Bureau — Code of Aid for special schools (subvention within Subhead 000) 2024-25 · Actual |
3,791,708 | PDF p.17 printed 422 |
- Code of Aid for special schools ............................................. 3,791,708 3,783,230 3,847,228 3,883,670 |
| Education Bureau — Code of Aid for special schools (subvention within Subhead 000) 2025-26 · Revised estimate |
3,847,228 | PDF p.17 printed 422 |
- Code of Aid for special schools ............................................. 3,791,708 3,783,230 3,847,228 3,883,670 |
| Education Bureau — Direct Subsidy Scheme (subvention within Subhead 000) 2024-25 · Actual |
5,535,272 | PDF p.17 printed 422 |
- Direct Subsidy Scheme .......................................................... 5,535,272 5,678,177 5,716,106 5,806,704 |
| Education Bureau — Direct Subsidy Scheme (subvention within Subhead 000) 2025-26 · Revised estimate |
5,716,106 | PDF p.17 printed 422 |
- Direct Subsidy Scheme .......................................................... 5,535,272 5,678,177 5,716,106 5,806,704 |
| Education Bureau — Kindergarten Education Scheme (subvention within Subhead 000) 2024-25 · Actual |
5,285,933 | PDF p.17 printed 422 |
- Kindergarten Education Scheme ........................................... 5,285,933 4,914,901 4,812,695 4,481,164 |
| Education Bureau — Kindergarten Education Scheme (subvention within Subhead 000) 2025-26 · Revised estimate |
4,812,695 | PDF p.17 printed 422 |
- Kindergarten Education Scheme ........................................... 5,285,933 4,914,901 4,812,695 4,481,164 |
| Education Bureau — Vocational Training Council (recurrent subvention) (subvention within Subhead 000) 2024-25 · Actual |
4,192,754 | PDF p.17 printed 422 |
- Vocational Training Council ................................................. 4,192,754 2,854,915 2,907,915 2,804,391 |
| Education Bureau — Vocational Training Council (recurrent subvention) (subvention within Subhead 000) 2025-26 · Revised estimate |
2,907,915 | PDF p.17 printed 422 |
- Vocational Training Council ................................................. 4,192,754 2,854,915 2,907,915 2,804,391 |
Estimates for the year ending 31 March 2027 – Volume I – Head 170 — Social Welfare Department (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (33)
https://www.budget.gov.hk/2026/eng/pdf/head170.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Social Welfare Department — Programme (3) Services for The Elderly 2026-27 · Estimate |
17,281.4 | PDF p.19 printed 903 |
(3) Services for The Elderly............................... 15,551.4 17,127.7 16,487.2 17,281.4 |
| Social Welfare Department — Programme (4) Rehabilitation and Medical Social Services 2026-27 · Estimate |
12,882.4 | PDF p.19 printed 903 |
(4) Rehabilitation and Medical Social Services ........................................................ 11,851.2 12,633.9 12,377.4 12,882.4 |
| Social Welfare Department — Programme (1) Family and Child Welfare 2026-27 · Estimate |
5,973.4 | PDF p.19 printed 903 |
(1) Family and Child Welfare ............................ 5,400.8 5,898.3 5,594.9 5,973.4 |
| Social Welfare Department — Programme (7) Young People 2026-27 · Estimate |
2,990.4 | PDF p.19 printed 903 |
(7) Young People ............................................... 2,947.6 3,043.6 3,029.1 2,990.4 |
| Social Welfare Department — Programme (1) Family and Child Welfare 2025-26 · Revised estimate |
5,594.9 | PDF p.19 printed 903 |
(1) Family and Child Welfare ............................ 5,400.8 5,898.3 5,594.9 5,973.4 |
| Social Welfare Department — Programme (1) Family and Child Welfare 2024-25 · Actual |
5,400.8 | PDF p.19 printed 903 |
(1) Family and Child Welfare ............................ 5,400.8 5,898.3 5,594.9 5,973.4 |
| Social Welfare Department — Programme (2) Social Security 2026-27 · Estimate |
93,149.9 | PDF p.19 printed 903 |
(2) Social Security ............................................. 76,258.3 85,775.5 81,085.4 93,149.9 |
| Social Welfare Department — Programme (2) Social Security 2025-26 · Revised estimate |
81,085.4 | PDF p.19 printed 903 |
(2) Social Security ............................................. 76,258.3 85,775.5 81,085.4 93,149.9 |
| Social Welfare Department — Programme (2) Social Security 2024-25 · Actual |
76,258.3 | PDF p.19 printed 903 |
(2) Social Security ............................................. 76,258.3 85,775.5 81,085.4 93,149.9 |
| Social Welfare Department — Programme (3) Services for The Elderly 2025-26 · Revised estimate |
16,487.2 | PDF p.19 printed 903 |
(3) Services for The Elderly............................... 15,551.4 17,127.7 16,487.2 17,281.4 |
| Social Welfare Department — Programme (3) Services for The Elderly 2024-25 · Actual |
15,551.4 | PDF p.19 printed 903 |
(3) Services for The Elderly............................... 15,551.4 17,127.7 16,487.2 17,281.4 |
| Social Welfare Department — Programme (4) Rehabilitation and Medical Social Services 2025-26 · Revised estimate |
12,377.4 | PDF p.19 printed 903 |
(4) Rehabilitation and Medical Social Services ........................................................ 11,851.2 12,633.9 12,377.4 12,882.4 |
| Social Welfare Department — Programme (4) Rehabilitation and Medical Social Services 2024-25 · Actual |
11,851.2 | PDF p.19 printed 903 |
(4) Rehabilitation and Medical Social Services ........................................................ 11,851.2 12,633.9 12,377.4 12,882.4 |
| Social Welfare Department — Programme (5) Services for Offenders 2026-27 · Estimate |
437.7 | PDF p.19 printed 903 |
(5) Services for Offenders.................................. 441.3 464.2 438.7 437.7 |
| Social Welfare Department — Programme (5) Services for Offenders 2025-26 · Revised estimate |
438.7 | PDF p.19 printed 903 |
(5) Services for Offenders.................................. 441.3 464.2 438.7 437.7 |
| Social Welfare Department — Programme (5) Services for Offenders 2024-25 · Actual |
441.3 | PDF p.19 printed 903 |
(5) Services for Offenders.................................. 441.3 464.2 438.7 437.7 |
| Social Welfare Department — Programme (6) Community Development 2026-27 · Estimate |
220.8 | PDF p.19 printed 903 |
(6) Community Development ............................ 229.7 225.4 225.4 220.8 |
| Social Welfare Department — Programme (6) Community Development 2025-26 · Revised estimate |
225.4 | PDF p.19 printed 903 |
(6) Community Development ............................ 229.7 225.4 225.4 220.8 |
| Social Welfare Department — Programme (6) Community Development 2024-25 · Actual |
229.7 | PDF p.19 printed 903 |
(6) Community Development ............................ 229.7 225.4 225.4 220.8 |
| Social Welfare Department — Programme (7) Young People 2025-26 · Revised estimate |
3,029.1 | PDF p.19 printed 903 |
(7) Young People ............................................... 2,947.6 3,043.6 3,029.1 2,990.4 |
| Social Welfare Department — Programme (7) Young People 2024-25 · Actual |
2,947.6 | PDF p.19 printed 903 |
(7) Young People ............................................... 2,947.6 3,043.6 3,029.1 2,990.4 |
| Social Welfare Department — Subhead 180 Social Security Allowance (SSA) scheme (Old Age Allowance, Old Age Living Allowance, Disability Allowance) 2026-27 · Estimate |
61,872,000 | PDF p.21 printed 905 |
180 Social security allowance scheme ....................... 50,175,056 57,948,000 54,187,000 61,872,000 |
| Social Welfare Department — Subhead 179 Comprehensive Social Security Assistance (CSSA) scheme 2026-27 · Estimate |
23,367,000 | PDF p.21 printed 905 |
179 Comprehensive social security assistance scheme ............................................................ 21,782,758 23,096,000 22,456,000 23,367,000 |
| Social Welfare Department — Subhead 180 Social Security Allowance (SSA) scheme (Old Age Allowance, Old Age Living Allowance, Disability Allowance) 2025-26 · Revised estimate |
54,187,000 | PDF p.21 printed 905 |
180 Social security allowance scheme ....................... 50,175,056 57,948,000 54,187,000 61,872,000 |
| Social Welfare Department — Subhead 700 General non-recurrent 2025-26 · Revised estimate |
3,017,541 | PDF p.21 printed 905 |
700 General non-recurrent ......................................... 2,879,299 3,516,782 3,017,541 6,622,136 |
| Social Welfare Department — Subhead 700 General non-recurrent 2026-27 · Estimate |
6,622,136 | PDF p.21 printed 905 |
700 General non-recurrent ......................................... 2,879,299 3,516,782 3,017,541 6,622,136 |
| Social Welfare Department — Subhead 179 Comprehensive Social Security Assistance (CSSA) scheme 2024-25 · Actual |
21,782,758 | PDF p.21 printed 905 |
179 Comprehensive social security assistance scheme ............................................................ 21,782,758 23,096,000 22,456,000 23,367,000 |
| Social Welfare Department — Subhead 179 Comprehensive Social Security Assistance (CSSA) scheme 2025-26 · Revised estimate |
22,456,000 | PDF p.21 printed 905 |
179 Comprehensive social security assistance scheme ............................................................ 21,782,758 23,096,000 22,456,000 23,367,000 |
| Social Welfare Department — Subhead 180 Social Security Allowance (SSA) scheme (Old Age Allowance, Old Age Living Allowance, Disability Allowance) 2024-25 · Actual |
50,175,056 | PDF p.21 printed 905 |
180 Social security allowance scheme ....................... 50,175,056 57,948,000 54,187,000 61,872,000 |
| Social Welfare Department — Subhead 700 General non-recurrent 2024-25 · Actual |
2,879,299 | PDF p.21 printed 905 |
700 General non-recurrent ......................................... 2,879,299 3,516,782 3,017,541 6,622,136 |
| Social Welfare Department — subventions for social welfare services (grants to NGOs, within Subhead 000) 2024-25 · Actual |
26,224,880 | PDF p.22 printed 906 |
- Social welfare services (grants) ............................................. 26,224,880 26,991,588 26,741,296 27,241,398 |
| Social Welfare Department — subventions for social welfare services (grants to NGOs, within Subhead 000) 2025-26 · Revised estimate |
26,741,296 | PDF p.22 printed 906 |
- Social welfare services (grants) ............................................. 26,224,880 26,991,588 26,741,296 27,241,398 |
| Social Welfare Department — subventions for social welfare services (grants to NGOs, within Subhead 000) 2026-27 · Estimate |
27,241,398 | PDF p.22 printed 906 |
- Social welfare services (grants) ............................................. 26,224,880 26,991,588 26,741,296 27,241,398 |
Hong Kong 2021 Population Census – Thematic Report: Household Income Distribution in Hong Kong (bilingual) (32)
https://www.censtatd.gov.hk/en/data/stat_report/product/B1120108/att/B11201082021XXXXB0100.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Census 2021 report legend: '*' means less than $10 2021 · Statistic |
10 HK$ | PDF p.24 printed 12 |
* Less than $10 |
| Census 2021 report legend: '0.0' means less than 0.05% 2021 · Statistic |
0.05 % | PDF p.24 printed 12 |
0.0 Less than 0.05% |
| Median original monthly household income, decile 1st (lowest) (2021 Census, incl. FDHs) 2021 · Statistic |
2,860 HK$ | PDF p.51 printed 39 |
第一(最低) 2,290 3,290 2,860 7,000 9,250 8,310 1.44 0.87 1.25 1.32 0.90 1.19 |
| Median original monthly household income, decile 2nd (2021 Census, incl. FDHs) 2021 · Statistic |
7,630 HK$ | PDF p.51 printed 39 |
第二 6,610 7,900 7,630 10,340 13,500 15,000 1.20 0.97 1.16 1.31 1.11 1.45 |
| Median original monthly household income, decile 3rd (2021 Census, incl. FDHs) 2021 · Statistic |
12,410 HK$ | PDF p.51 printed 39 |
第三 10,000 12,000 12,410 14,500 17,750 20,040 1.20 1.03 1.24 1.22 1.13 1.38 |
| Median original monthly household income, decile 4th (2021 Census, incl. FDHs) 2021 · Statistic |
18,040 HK$ | PDF p.51 printed 39 |
第四 14,010 16,500 18,040 18,000 22,000 25,160 1.18 1.09 1.29 1.22 1.14 1.40 |
| Median original monthly household income, decile 5th (2021 Census, incl. FDHs) 2021 · Statistic |
24,030 HK$ | PDF p.51 printed 39 |
第五 18,500 21,650 24,030 22,000 27,950 31,330 1.17 1.11 1.30 1.27 1.12 1.42 |
| Median original monthly household income, decile 6th (2021 Census, incl. FDHs) 2021 · Statistic |
31,240 HK$ | PDF p.51 printed 39 |
第六 23,110 28,400 31,240 27,070 33,990 39,040 1.23 1.10 1.35 1.26 1.15 1.44 |
| Median original monthly household income, decile 7th (2021 Census, incl. FDHs) 2021 · Statistic |
40,210 HK$ | PDF p.51 printed 39 |
第七 29,700 36,000 40,210 33,300 41,650 48,170 1.21 1.12 1.35 1.25 1.16 1.45 |
| Median original monthly household income, decile 8th (2021 Census, incl. FDHs) 2021 · Statistic |
52,720 HK$ | PDF p.51 printed 39 |
第八 38,000 46,250 52,720 42,000 52,250 60,290 1.22 1.14 1.39 1.24 1.15 1.44 |
| Median original monthly household income, decile 9th (2021 Census, incl. FDHs) 2021 · Statistic |
73,210 HK$ | PDF p.51 printed 39 |
第九 52,480 63,750 73,210 58,000 70,490 82,750 1.21 1.15 1.40 1.22 1.17 1.43 |
| Median original monthly household income, decile 10th (highest) (2021 Census, incl. FDHs) 2021 · Statistic |
131,360 HK$ | PDF p.51 printed 39 |
第十(最高) 96,480 114,500 131,360 103,480 121,160 145,040 1.19 1.15 1.36 1.17 1.20 1.40 |
| Average salaries tax + property tax paid per household per month, decile 1st (lowest) (2021 Census) 2021 · Statistic |
– | PDF p.87 printed 75 |
第一(最低) – – – – – – |
| Share of all salaries tax + property tax paid by households, decile 1st (lowest) (2021 Census) 2021 · Statistic |
– | PDF p.87 printed 75 |
第一(最低) – – – – – – |
| Average salaries tax + property tax paid per household per month, decile 2nd (2021 Census) 2021 · Statistic |
– | PDF p.87 printed 75 |
第二 – – – – – – |
| Share of all salaries tax + property tax paid by households, decile 2nd (2021 Census) 2021 · Statistic |
– | PDF p.87 printed 75 |
第二 – – – – – – |
| Average salaries tax + property tax paid per household per month, decile 3rd (2021 Census) 2021 · Statistic |
* | PDF p.87 printed 75 |
第三 * 0.0% * 0.0% * 0.0% |
| Share of all salaries tax + property tax paid by households, decile 3rd (2021 Census) 2021 · Statistic |
0 % | PDF p.87 printed 75 |
第三 * 0.0% * 0.0% * 0.0% |
| Average salaries tax + property tax paid per household per month, decile 4th (2021 Census) 2021 · Statistic |
40 HK$ | PDF p.87 printed 75 |
第四 20 0.1% 30 0.2% 40 0.2% |
| Share of all salaries tax + property tax paid by households, decile 4th (2021 Census) 2021 · Statistic |
0.2 % | PDF p.87 printed 75 |
第四 20 0.1% 30 0.2% 40 0.2% |
| Average salaries tax + property tax paid per household per month, decile 5th (2021 Census) 2021 · Statistic |
90 HK$ | PDF p.87 printed 75 |
第五 50 0.3% 100 0.4% 90 0.3% |
| Share of all salaries tax + property tax paid by households, decile 5th (2021 Census) 2021 · Statistic |
0.3 % | PDF p.87 printed 75 |
第五 50 0.3% 100 0.4% 90 0.3% |
| Average salaries tax + property tax paid per household per month, decile 6th (2021 Census) 2021 · Statistic |
240 HK$ | PDF p.87 printed 75 |
第六 120 0.7% 250 1.1% 240 1.0% |
| Share of all salaries tax + property tax paid by households, decile 6th (2021 Census) 2021 · Statistic |
1 % | PDF p.87 printed 75 |
第六 120 0.7% 250 1.1% 240 1.0% |
| Average salaries tax + property tax paid per household per month, decile 7th (2021 Census) 2021 · Statistic |
510 HK$ | PDF p.87 printed 75 |
第七 330 2.0% 460 2.1% 510 2.0% |
| Share of all salaries tax + property tax paid by households, decile 7th (2021 Census) 2021 · Statistic |
2 % | PDF p.87 printed 75 |
第七 330 2.0% 460 2.1% 510 2.0% |
| Average salaries tax + property tax paid per household per month, decile 8th (2021 Census) 2021 · Statistic |
1,280 HK$ | PDF p.87 printed 75 |
第八 810 4.9% 1,080 4.9% 1,280 5.2% |
| Share of all salaries tax + property tax paid by households, decile 8th (2021 Census) 2021 · Statistic |
5.2 % | PDF p.87 printed 75 |
第八 810 4.9% 1,080 4.9% 1,280 5.2% |
| Average salaries tax + property tax paid per household per month, decile 9th (2021 Census) 2021 · Statistic |
3,400 HK$ | PDF p.87 printed 75 |
第九 2,420 14.6% 2,960 13.4% 3,400 13.7% |
| Share of all salaries tax + property tax paid by households, decile 9th (2021 Census) 2021 · Statistic |
13.7 % | PDF p.87 printed 75 |
第九 2,420 14.6% 2,960 13.4% 3,400 13.7% |
| Average salaries tax + property tax paid per household per month, decile 10th (highest) (2021 Census) 2021 · Statistic |
19,290 HK$ | PDF p.87 printed 75 |
第十(最高) 12,780 77.3% 17,310 78.0% 19,290 77.6% |
| Share of all salaries tax + property tax paid by households, decile 10th (highest) (2021 Census) 2021 · Statistic |
77.6 % | PDF p.87 printed 75 |
第十(最高) 12,780 77.3% 17,310 78.0% 19,290 77.6% |
Estimates for the year ending 31 March 2027 – Volume I – Head 122 — Hong Kong Police Force (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (32)
https://www.budget.gov.hk/2026/eng/pdf/head122.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Hong Kong Police Force — non-directorate posts (31 March 2026) 2025-26 · Revised estimate |
37 716 | PDF p.1 printed 617 |
37 716 non-directorate posts as at 31 March 2026 reducing by 1 335 posts to 36 381 posts as at |
| Hong Kong Police Force — non-directorate posts (31 March 2027) 2026-27 · Estimate |
36 381 | PDF p.1 printed 617 |
37 716 non-directorate posts as at 31 March 2026 reducing by 1 335 posts to 36 381 posts as at |
| Hong Kong Police Force — net change in non-directorate posts in 2026-27 2026-27 · Estimate |
1 335 | PDF p.1 printed 617 |
37 716 non-directorate posts as at 31 March 2026 reducing by 1 335 posts to 36 381 posts as at |
| Hong Kong Police Force — directorate posts (31 March 2026 and 2027) 2026-27 · Estimate |
77 | PDF p.1 printed 617 |
In addition, there will be an estimated 77 directorate posts as at 31 March 2026 and 31 March 2027. |
| Hong Kong Police Force — Programme (1) Maintenance of Law and Order in the Community 2026-27 · Estimate |
11,910.4 | PDF p.11 printed 627 |
(1) Maintenance of Law and Order in the Community .................................................. 10,933.4 12,568.9 11,952.3 11,910.4 |
| Hong Kong Police Force — Programme (1) Maintenance of Law and Order in the Community 2025-26 · Revised estimate |
11,952.3 | PDF p.11 printed 627 |
(1) Maintenance of Law and Order in the Community .................................................. 10,933.4 12,568.9 11,952.3 11,910.4 |
| Hong Kong Police Force — Programme (1) Maintenance of Law and Order in the Community 2024-25 · Actual |
10,933.4 | PDF p.11 printed 627 |
(1) Maintenance of Law and Order in the Community .................................................. 10,933.4 12,568.9 11,952.3 11,910.4 |
| Hong Kong Police Force — Programme (2) Prevention and Detection of Crime 2026-27 · Estimate |
6,237.9 | PDF p.11 printed 627 |
(2) Prevention and Detection of Crime ............. 6,832.8 5,965.2 6,108.9 6,237.9 |
| Hong Kong Police Force — Programme (2) Prevention and Detection of Crime 2025-26 · Revised estimate |
6,108.9 | PDF p.11 printed 627 |
(2) Prevention and Detection of Crime ............. 6,832.8 5,965.2 6,108.9 6,237.9 |
| Hong Kong Police Force — Programme (2) Prevention and Detection of Crime 2024-25 · Actual |
6,832.8 | PDF p.11 printed 627 |
(2) Prevention and Detection of Crime ............. 6,832.8 5,965.2 6,108.9 6,237.9 |
| Hong Kong Police Force — Programme (3) Road Safety 2026-27 · Estimate |
2,395.6 | PDF p.11 printed 627 |
(3) Road Safety.................................................. 2,095.8 2,512.4 2,363.9 2,395.6 |
| Hong Kong Police Force — Programme (3) Road Safety 2025-26 · Revised estimate |
2,363.9 | PDF p.11 printed 627 |
(3) Road Safety.................................................. 2,095.8 2,512.4 2,363.9 2,395.6 |
| Hong Kong Police Force — Programme (3) Road Safety 2024-25 · Actual |
2,095.8 | PDF p.11 printed 627 |
(3) Road Safety.................................................. 2,095.8 2,512.4 2,363.9 2,395.6 |
| Hong Kong Police Force — Programme (4) Operations 2026-27 · Estimate |
6,408.8 | PDF p.11 printed 627 |
(4) Operations .................................................... 6,701.8 7,010.0 6,135.5 6,408.8 |
| Hong Kong Police Force — Programme (4) Operations 2025-26 · Revised estimate |
6,135.5 | PDF p.11 printed 627 |
(4) Operations .................................................... 6,701.8 7,010.0 6,135.5 6,408.8 |
| Hong Kong Police Force — Programme (4) Operations 2024-25 · Actual |
6,701.8 | PDF p.11 printed 627 |
(4) Operations .................................................... 6,701.8 7,010.0 6,135.5 6,408.8 |
| Hong Kong Police Force — staff by programme, Programme (1) (as at 31 March 2027) 2026-27 · Estimate |
19 107 | PDF p.12 printed 628 |
(19 107) |
| Hong Kong Police Force — share of 2026-27 provision, Programme (1) 2026-27 · Estimate |
44.2% | PDF p.12 printed 628 |
(44.2%) |
| Hong Kong Police Force — staff by programme, Programme (2) (as at 31 March 2027) 2026-27 · Estimate |
7 601 | PDF p.12 printed 628 |
(7 601) |
| Hong Kong Police Force — share of 2026-27 provision, Programme (2) 2026-27 · Estimate |
23.1% | PDF p.12 printed 628 |
(23.1%) |
| Hong Kong Police Force — staff by programme, Programme (3) (as at 31 March 2027) 2026-27 · Estimate |
3 390 | PDF p.12 printed 628 |
(3 390) |
| Hong Kong Police Force — share of 2026-27 provision, Programme (3) 2026-27 · Estimate |
8.9% | PDF p.12 printed 628 |
(8.9%) |
| Hong Kong Police Force — staff by programme, Programme (4) (as at 31 March 2027) 2026-27 · Estimate |
6 360 | PDF p.12 printed 628 |
(6 360) |
| Hong Kong Police Force — share of 2026-27 provision, Programme (4) 2026-27 · Estimate |
23.8% | PDF p.12 printed 628 |
(23.8%) |
| Hong Kong Police Force — Subhead 000 Operational expenses (recurrent) 2024-25 · Actual |
25,634,328 | PDF p.14 printed 630 |
000 Operational expenses .......................................... 25,634,328 26,223,449 25,241,286 25,364,481 |
| Hong Kong Police Force — Subhead 000 Operational expenses (recurrent) 2025-26 · Revised estimate |
25,241,286 | PDF p.14 printed 630 |
000 Operational expenses .......................................... 25,634,328 26,223,449 25,241,286 25,364,481 |
| Hong Kong Police Force — Subhead 000 Operational expenses (recurrent) 2026-27 · Estimate |
25,364,481 | PDF p.14 printed 630 |
000 Operational expenses .......................................... 25,634,328 26,223,449 25,241,286 25,364,481 |
| Hong Kong Police Force — total Capital Account (plant, vehicles, equipment) 2024-25 · Actual |
765,045 | PDF p.14 printed 630 |
Total, Capital Account............................. 765,045 1,694,912 1,181,533 1,461,326 |
| Hong Kong Police Force — total Capital Account (plant, vehicles, equipment) 2025-26 · Revised estimate |
1,181,533 | PDF p.14 printed 630 |
Total, Capital Account............................. 765,045 1,694,912 1,181,533 1,461,326 |
| Hong Kong Police Force — total Capital Account (plant, vehicles, equipment) 2026-27 · Estimate |
1,461,326 | PDF p.14 printed 630 |
Total, Capital Account............................. 765,045 1,694,912 1,181,533 1,461,326 |
| Hong Kong Police Force — salaries (within Subhead 000) 2025-26 · Revised estimate |
19,042,000 | PDF p.15 printed 631 |
- Salaries .................................................................................. 18,899,842 19,139,283 19,042,000 18,952,845 |
| Hong Kong Police Force — salaries (within Subhead 000) 2026-27 · Estimate |
18,952,845 | PDF p.15 printed 631 |
- Salaries .................................................................................. 18,899,842 19,139,283 19,042,000 18,952,845 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Summary of Payments by Heads (28)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-00.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Head 707 — New Towns and Urban Area Development 2026-27 · Estimate |
25,371,317 | PDF p.1 printed 20 |
707—New Towns and Urban Area Development ........................................ 299,906,600 105,267,057 22,772,985 25,371,317 |
| Head 701 — Land Acquisition 2026-27 · Estimate |
19,973,780 | PDF p.1 printed 20 |
701—Land Acquisition ........................................ 5,296,890 3,804,125 20,116,605 19,973,780 |
| Head 705 — Civil Engineering 2026-27 · Estimate |
11,756,841 | PDF p.1 printed 20 |
705—Civil Engineering ....................................... 153,609,300 66,561,524 12,108,697 11,756,841 |
| Head 704 — Drainage 2026-27 · Estimate |
11,655,564 | PDF p.1 printed 20 |
704—Drainage ..................................................... 104,407,900 29,730,251 10,000,000 11,655,564 |
| Head 709 — Waterworks 2026-27 · Estimate |
8,544,756 | PDF p.1 printed 20 |
709—Waterworks ................................................ 55,790,700 28,105,062 5,740,000 8,544,756 |
| Head 706 — Highways 2026-27 · Estimate |
7,333,005 | PDF p.1 printed 20 |
706—Highways ................................................... 351,560,600 308,598,542 9,750,789 7,333,005 |
| Head 711 — Housing 2026-27 · Estimate |
5,517,436 | PDF p.1 printed 20 |
711—Housing ...................................................... 59,499,000 16,687,384 12,233,245 5,517,436 |
| Head 702 — Port and Airport Development 2026-27 · Estimate |
150 | PDF p.1 printed 20 |
702—Port and Airport Development ................... 287,000 275,300 110 150 |
| Head 703 — Buildings 2026-27 · Estimate |
45,515,010 | PDF p.1 printed 20 |
703—Buildings .................................................... 326,783,600 127,557,117 39,106,062 45,515,010 |
| Head 708 (part) — Capital Subventions 2026-27 · Estimate |
12,306,781 | PDF p.1 printed 20 |
708 (part)—Capital Subventions .......................... 113,783,000 53,784,843 13,088,999 12,306,781 |
| Head 708 (part) — Major Systems and Equipment 2026-27 · Estimate |
1,512,117 | PDF p.1 printed 20 |
708 (part)—Major Systems and Equipment ......... 13,685,391 4,908,222 1,247,601 1,512,117 |
| Head 710 — Computerisation 2026-27 · Estimate |
6,868,895 | PDF p.1 printed 20 |
710—Computerisation ......................................... 18,261,648 6,937,216 4,577,393 6,868,895 |
| CWRF Heads 701–711 total (capital works, land acquisition, capital subventions, computerisation) 2026-27 · Estimate |
156,355,652 | PDF p.1 printed 20 |
Heads 701—711: total ................... 1,502,871,629 752,216,643 150,742,486 156,355,652 |
| Government bonds — interest and other expenses 2026-27 · Estimate |
16,641,000 | PDF p.1 printed 20 |
Interest and Other Expenses# ............................... — — 10,556,000 16,641,000 |
| Head 711 — Housing 2025-26 · Revised estimate |
12,233,245 | PDF p.1 printed 20 |
711—Housing ...................................................... 59,499,000 16,687,384 12,233,245 5,517,436 |
| Head 701 — Land Acquisition 2025-26 · Revised estimate |
20,116,605 | PDF p.1 printed 20 |
701—Land Acquisition ........................................ 5,296,890 3,804,125 20,116,605 19,973,780 |
| Head 702 — Port and Airport Development 2025-26 · Revised estimate |
110 | PDF p.1 printed 20 |
702—Port and Airport Development ................... 287,000 275,300 110 150 |
| Head 703 — Buildings 2025-26 · Revised estimate |
39,106,062 | PDF p.1 printed 20 |
703—Buildings .................................................... 326,783,600 127,557,117 39,106,062 45,515,010 |
| Head 704 — Drainage 2025-26 · Revised estimate |
10,000,000 | PDF p.1 printed 20 |
704—Drainage ..................................................... 104,407,900 29,730,251 10,000,000 11,655,564 |
| Head 705 — Civil Engineering 2025-26 · Revised estimate |
12,108,697 | PDF p.1 printed 20 |
705—Civil Engineering ....................................... 153,609,300 66,561,524 12,108,697 11,756,841 |
| Head 706 — Highways 2025-26 · Revised estimate |
9,750,789 | PDF p.1 printed 20 |
706—Highways ................................................... 351,560,600 308,598,542 9,750,789 7,333,005 |
| Head 707 — New Towns and Urban Area Development 2025-26 · Revised estimate |
22,772,985 | PDF p.1 printed 20 |
707—New Towns and Urban Area Development ........................................ 299,906,600 105,267,057 22,772,985 25,371,317 |
| Head 708 (part) — Capital Subventions 2025-26 · Revised estimate |
13,088,999 | PDF p.1 printed 20 |
708 (part)—Capital Subventions .......................... 113,783,000 53,784,843 13,088,999 12,306,781 |
| Head 708 (part) — Major Systems and Equipment 2025-26 · Revised estimate |
1,247,601 | PDF p.1 printed 20 |
708 (part)—Major Systems and Equipment ......... 13,685,391 4,908,222 1,247,601 1,512,117 |
| Head 709 — Waterworks 2025-26 · Revised estimate |
5,740,000 | PDF p.1 printed 20 |
709—Waterworks ................................................ 55,790,700 28,105,062 5,740,000 8,544,756 |
| Head 710 — Computerisation 2025-26 · Revised estimate |
4,577,393 | PDF p.1 printed 20 |
710—Computerisation ......................................... 18,261,648 6,937,216 4,577,393 6,868,895 |
| CWRF Heads 701–711 total (capital works, land acquisition, capital subventions, computerisation) 2025-26 · Revised estimate |
150,742,486 | PDF p.1 printed 20 |
Heads 701—711: total ................... 1,502,871,629 752,216,643 150,742,486 156,355,652 |
| Government bonds — interest and other expenses 2025-26 · Revised estimate |
10,556,000 | PDF p.1 printed 20 |
Interest and Other Expenses# ............................... — — 10,556,000 16,641,000 |
Estimates for the year ending 31 March 2027 – Volume I: Revenue Head 9 – Loans, Reimbursements, Contributions and Other Receipts (28)
https://www.budget.gov.hk/2026/eng/pdf/head009b.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Pension contributions 2026-27 · Estimate |
0.7 HK$ million | PDF p.1 printed 1000 |
020 Pension contributions....................................... 941 700 800 700 |
| Recovery of salaries and staff on-costs 2026-27 · Estimate |
2,212 HK$ million | PDF p.1 printed 1000 |
030 Recovery of salaries and staff on-costs ............ 1,783,747 2,444,000 2,207,000 2,212,000 |
| Light and fuel in government buildings 2026-27 · Estimate |
28 HK$ million | PDF p.1 printed 1000 |
040 Light and fuel in government buildings ........... 25,962 25,000 32,000 28,000 |
| Recovery of overpayments and losses 2026-27 · Estimate |
1,244 HK$ million | PDF p.1 printed 1000 |
050 Recovery of overpayments and losses ............. 1,900,352 1,145,000 1,581,000 1,244,000 |
| Other receipts 2026-27 · Estimate |
1,255 HK$ million | PDF p.1 printed 1000 |
090 Other receipts ................................................... 4,333,904 5,218,000 5,337,000 1,255,000 |
| Payments by Trading Funds – transfer of statutory return and interest income 2026-27 · Estimate |
323 HK$ million | PDF p.1 printed 1000 |
(001) Transfer of statutory return and interest 367,391 329,000 363,000 323,000 |
| Payments by Trading Funds – payments for "insurance" premium 2026-27 · Estimate |
4.9 HK$ million | PDF p.1 printed 1000 |
(002) Payments for “insurance” premium ...... 4,851 4,900 4,900 4,900 |
| Payments by Trading Funds – reimbursements arising from policy on "insurance" 2026-27 · Estimate |
0.4 HK$ million | PDF p.1 printed 1000 |
arising from policy on “insurance” ....... 235 350 420 400 |
| One-off transfer from other funds (funds outside the Government's accounts, incl. Bond Fund surplus) 2026-27 · Estimate |
52,830 HK$ million | PDF p.1 printed 1000 |
120 One-off transfer from other funds ................... 15,000,000 61,990,000 61,500,000 52,830,000 |
| One-off transfer from other funds (funds outside the Government's accounts, incl. Bond Fund surplus) 2024-25 · Actual |
15,000 HK$ million | PDF p.1 printed 1000 |
120 One-off transfer from other funds ................... 15,000,000 |
| Repayments of loans and advances 2024-25 · Actual |
0.001 HK$ million | PDF p.1 printed 1000 |
010 Repayments of loans and advances.................. 1 |
| Pension contributions 2024-25 · Actual |
0.941 HK$ million | PDF p.1 printed 1000 |
020 Pension contributions....................................... 941 |
| Recovery of salaries and staff on-costs 2024-25 · Actual |
1,783.747 HK$ million | PDF p.1 printed 1000 |
030 Recovery of salaries and staff on-costs ............ 1,783,747 |
| Light and fuel in government buildings 2024-25 · Actual |
25.962 HK$ million | PDF p.1 printed 1000 |
040 Light and fuel in government buildings ........... 25,962 |
| Recovery of overpayments and losses 2024-25 · Actual |
1,900.352 HK$ million | PDF p.1 printed 1000 |
050 Recovery of overpayments and losses ............. 1,900,352 |
| Other receipts 2024-25 · Actual |
4,333.904 HK$ million | PDF p.1 printed 1000 |
090 Other receipts ................................................... 4,333,904 |
| Payments by Trading Funds – transfer of statutory return and interest income 2024-25 · Actual |
367.391 HK$ million | PDF p.1 printed 1000 |
(001) Transfer of statutory return and interest 367,391 |
| Payments by Trading Funds – payments for "insurance" premium 2024-25 · Actual |
4.851 HK$ million | PDF p.1 printed 1000 |
(002) Payments for “insurance” premium ...... 4,851 |
| Payments by Trading Funds – reimbursements arising from policy on "insurance" 2024-25 · Actual |
0.235 HK$ million | PDF p.1 printed 1000 |
arising from policy on “insurance” ....... 235 |
| One-off transfer from other funds (funds outside the Government's accounts, incl. Bond Fund surplus) 2025-26 · Revised estimate |
61,500 HK$ million | PDF p.1 printed 1000 |
120 One-off transfer from other funds ................... 15,000,000 61,990,000 61,500,000 |
| Pension contributions 2025-26 · Revised estimate |
0.8 HK$ million | PDF p.1 printed 1000 |
020 Pension contributions....................................... 941 700 800 |
| Recovery of salaries and staff on-costs 2025-26 · Revised estimate |
2,207 HK$ million | PDF p.1 printed 1000 |
030 Recovery of salaries and staff on-costs ............ 1,783,747 2,444,000 2,207,000 |
| Light and fuel in government buildings 2025-26 · Revised estimate |
32 HK$ million | PDF p.1 printed 1000 |
040 Light and fuel in government buildings ........... 25,962 25,000 32,000 |
| Recovery of overpayments and losses 2025-26 · Revised estimate |
1,581 HK$ million | PDF p.1 printed 1000 |
050 Recovery of overpayments and losses ............. 1,900,352 1,145,000 1,581,000 |
| Other receipts 2025-26 · Revised estimate |
5,337 HK$ million | PDF p.1 printed 1000 |
090 Other receipts ................................................... 4,333,904 5,218,000 5,337,000 |
| Payments by Trading Funds – transfer of statutory return and interest income 2025-26 · Revised estimate |
363 HK$ million | PDF p.1 printed 1000 |
(001) Transfer of statutory return and interest 367,391 329,000 363,000 |
| Payments by Trading Funds – payments for "insurance" premium 2025-26 · Revised estimate |
4.9 HK$ million | PDF p.1 printed 1000 |
(002) Payments for “insurance” premium ...... 4,851 4,900 4,900 |
| Payments by Trading Funds – reimbursements arising from policy on "insurance" 2025-26 · Revised estimate |
0.42 HK$ million | PDF p.1 printed 1000 |
arising from policy on “insurance” ....... 235 350 420 |
Estimates for the year ending 31 March 2027 – Volume I: Revenue Head 3 – Internal Revenue (26)
https://www.budget.gov.hk/2026/eng/pdf/head003b.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Salaries tax 2026-27 · Estimate |
98,000 HK$ million | PDF p.1 printed 992 |
(050) Salaries tax ............................................. 88,878,791 96,470,000 97,000,000 98,000,000† |
| Profits tax 2026-27 · Estimate |
210,000 HK$ million | PDF p.1 printed 992 |
(020) Profits tax ............................................... 177,687,849 192,200,000 209,000,000 210,000,000† |
| Stamp duties 2026-27 · Estimate |
101,000 HK$ million | PDF p.1 printed 992 |
070 Stamp duties..................................................... 63,880,244 67,585,000 99,500,000 101,000,000^ |
| Personal assessment 2026-27 · Estimate |
9,000 HK$ million | PDF p.1 printed 992 |
(030) Personal assessment ............................... 8,223,258 8,280,000 8,900,000 9,000,000† |
| Property tax 2026-27 · Estimate |
4,200 HK$ million | PDF p.1 printed 992 |
(040) Property tax ............................................ 3,983,656 4,200,000 4,100,000 4,200,000 |
| Bets and sweeps tax 2026-27 · Estimate |
28,700 HK$ million | PDF p.1 printed 992 |
010 Bets and sweeps tax ......................................... 28,511,716 28,390,000 28,100,000 28,700,000 |
| Estate duty 2026-27 · Estimate |
100 HK$ million | PDF p.1 printed 992 |
050 Estate duty ....................................................... 10,064 8,000 8,000 100,000 |
| Hotel accommodation tax 2026-27 · Estimate |
800 HK$ million | PDF p.1 printed 992 |
060 Hotel accommodation tax ................................ — 970,000 770,000 800,000 |
| Air passenger departure tax 2026-27 · Estimate |
4,396 HK$ million | PDF p.1 printed 992 |
080 Air passenger departure tax ............................. 2,279,277 3,417,000 3,066,000 4,396,000 |
| Profits tax 2024-25 · Actual |
177,687.849 HK$ million | PDF p.1 printed 992 |
(020) Profits tax ............................................... 177,687,849 |
| Salaries tax 2024-25 · Actual |
88,878.791 HK$ million | PDF p.1 printed 992 |
(050) Salaries tax ............................................. 88,878,791 |
| Personal assessment 2024-25 · Actual |
8,223.258 HK$ million | PDF p.1 printed 992 |
(030) Personal assessment ............................... 8,223,258 |
| Property tax 2024-25 · Actual |
3,983.656 HK$ million | PDF p.1 printed 992 |
(040) Property tax ............................................ 3,983,656 |
| Stamp duties 2024-25 · Actual |
63,880.244 HK$ million | PDF p.1 printed 992 |
070 Stamp duties..................................................... 63,880,244 |
| Bets and sweeps tax 2024-25 · Actual |
28,511.716 HK$ million | PDF p.1 printed 992 |
010 Bets and sweeps tax ......................................... 28,511,716 |
| Estate duty 2024-25 · Actual |
10.064 HK$ million | PDF p.1 printed 992 |
050 Estate duty ....................................................... 10,064 |
| Air passenger departure tax 2024-25 · Actual |
2,279.277 HK$ million | PDF p.1 printed 992 |
080 Air passenger departure tax ............................. 2,279,277 |
| Profits tax 2025-26 · Revised estimate |
209,000 HK$ million | PDF p.1 printed 992 |
(020) Profits tax ............................................... 177,687,849 192,200,000 209,000,000 |
| Salaries tax 2025-26 · Revised estimate |
97,000 HK$ million | PDF p.1 printed 992 |
(050) Salaries tax ............................................. 88,878,791 96,470,000 97,000,000 |
| Personal assessment 2025-26 · Revised estimate |
8,900 HK$ million | PDF p.1 printed 992 |
(030) Personal assessment ............................... 8,223,258 8,280,000 8,900,000 |
| Property tax 2025-26 · Revised estimate |
4,100 HK$ million | PDF p.1 printed 992 |
(040) Property tax ............................................ 3,983,656 4,200,000 4,100,000 |
| Stamp duties 2025-26 · Revised estimate |
99,500 HK$ million | PDF p.1 printed 992 |
070 Stamp duties..................................................... 63,880,244 67,585,000 99,500,000 |
| Bets and sweeps tax 2025-26 · Revised estimate |
28,100 HK$ million | PDF p.1 printed 992 |
010 Bets and sweeps tax ......................................... 28,511,716 28,390,000 28,100,000 |
| Estate duty 2025-26 · Revised estimate |
8 HK$ million | PDF p.1 printed 992 |
050 Estate duty ....................................................... 10,064 8,000 8,000 |
| Hotel accommodation tax 2025-26 · Revised estimate |
770 HK$ million | PDF p.1 printed 992 |
060 Hotel accommodation tax ................................ — 970,000 770,000 |
| Air passenger departure tax 2025-26 · Revised estimate |
3,066 HK$ million | PDF p.1 printed 992 |
080 Air passenger departure tax ............................. 2,279,277 3,417,000 3,066,000 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 707 — New Towns and Urban Area Development (26)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-07.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 7747CL: Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area 2026-27 · Estimate |
843,025 | PDF p.2 printed 53 |
7747CL Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area .....................................17,320,100 10,728,987 2,361,064 843,025 |
| CWRF 7747CL: approved project estimate — Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area 2026-27 · Estimate |
17,320,100 | PDF p.2 printed 53 |
7747CL Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area .....................................17,320,100 10,728,987 2,361,064 843,025 |
| CWRF 7763CL: Integrated Basement for West Kowloon Cultural District— remaining works 2026-27 · Estimate |
1,335,170 | PDF p.2 printed 53 |
7763CL Integrated Basement for West Kowloon Cultural District— remaining works.......................................17,472,300 3,306,306 907,963 1,335,170 |
| CWRF 7763CL: approved project estimate — Integrated Basement for West Kowloon Cultural District— remaining works 2026-27 · Estimate |
17,472,300 | PDF p.2 printed 53 |
7763CL Integrated Basement for West Kowloon Cultural District— remaining works.......................................17,472,300 3,306,306 907,963 1,335,170 |
| CWRF 7787CL: Hung Shui Kiu/Ha Tsuen New Development Area advance works phase 3—site formation and engineering infrastructure 2026-27 · Estimate |
671,182 | PDF p.3 printed 54 |
7787CL Hung Shui Kiu/Ha Tsuen New Development Area advance works phase 3—site formation and engineering infrastructure ........................ 5,674,800 81,302 355,725 671,182 |
| CWRF 7787CL: approved project estimate — Hung Shui Kiu/Ha Tsuen New Development Area advance works phase 3—site formation and engineering infrastructure 2026-27 · Estimate |
5,674,800 | PDF p.3 printed 54 |
7787CL Hung Shui Kiu/Ha Tsuen New Development Area advance works phase 3—site formation and engineering infrastructure ........................ 5,674,800 81,302 355,725 671,182 |
| CWRF 7828CL: Remaining phase of site formation and engineering infrastructure works at Kwu Tung North New Development Area and Fanling North New Development Area— construction 2026-27 · Estimate |
3,972,100 | PDF p.4 printed 55 |
7828CL Remaining phase of site formation and engineering infrastructure works at Kwu Tung North New Development Area and Fanling North New Development Area— construction ..............................................30,167,900 361,432 1,255,841 3,972,100 |
| CWRF 7829CL: Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works— site formation and engineering infrastructure 2026-27 · Estimate |
2,344,772 | PDF p.4 printed 55 |
7829CL Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works— site formation and engineering infrastructure ............................................20,272,000 270,396 835,465 2,344,772 |
| CWRF 7828CL: approved project estimate — Remaining phase of site formation and engineering infrastructure works at Kwu Tung North New Development Area and Fanling North New Development Area— construction 2026-27 · Estimate |
30,167,900 | PDF p.4 printed 55 |
7828CL Remaining phase of site formation and engineering infrastructure works at Kwu Tung North New Development Area and Fanling North New Development Area— construction ..............................................30,167,900 361,432 1,255,841 3,972,100 |
| CWRF 7829CL: approved project estimate — Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works— site formation and engineering infrastructure 2026-27 · Estimate |
20,272,000 | PDF p.4 printed 55 |
7829CL Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works— site formation and engineering infrastructure ............................................20,272,000 270,396 835,465 2,344,772 |
| CWRF 7856CL: Development of the Loop—Main Works Package 1—site formation and infrastructure works 2026-27 · Estimate |
1,385,640 | PDF p.5 printed 56 |
7856CL Development of the Loop—Main Works Package 1—site formation and infrastructure works ..........................13,217,300 2,886,370 1,792,000 1,385,640 |
| CWRF 7856CL: approved project estimate — Development of the Loop—Main Works Package 1—site formation and infrastructure works 2026-27 · Estimate |
13,217,300 | PDF p.5 printed 56 |
7856CL Development of the Loop—Main Works Package 1—site formation and infrastructure works ..........................13,217,300 2,886,370 1,792,000 1,385,640 |
| CWRF 7859CL: Tung Chung New Town Extension— site formation and infrastructure works 2026-27 · Estimate |
2,545,000 | PDF p.5 printed 56 |
7859CL Tung Chung New Town Extension— site formation and infrastructure works........................................................19,332,900 9,191,030 3,655,438 2,545,000 |
| CWRF 7859CL: approved project estimate — Tung Chung New Town Extension— site formation and infrastructure works 2026-27 · Estimate |
19,332,900 | PDF p.5 printed 56 |
7859CL Tung Chung New Town Extension— site formation and infrastructure works........................................................19,332,900 9,191,030 3,655,438 2,545,000 |
| CWRF 7899CL: Phase 1 Stage 1 works of San Tin Technopole—site formation and engineering infrastructure 2026-27 · Estimate |
1,316,430 | PDF p.6 printed 57 |
7899CL Phase 1 Stage 1 works of San Tin Technopole—site formation and engineering infrastructure ........................27,175,100 17,825 381,568 1,316,430 |
| CWRF 7899CL: approved project estimate — Phase 1 Stage 1 works of San Tin Technopole—site formation and engineering infrastructure 2026-27 · Estimate |
27,175,100 | PDF p.6 printed 57 |
7899CL Phase 1 Stage 1 works of San Tin Technopole—site formation and engineering infrastructure ........................27,175,100 17,825 381,568 1,316,430 |
| CWRF 7898CL: Tung Chung New Town Extension— Site Formation and Infrastructure Works (Second Phase) 2026-27 · Estimate |
1,353,440 | PDF p.6 printed 57 |
7898CL Tung Chung New Town Extension— Site Formation and Infrastructure Works (Second Phase) ............................. 4,758,100 — 188,120 1,353,440 |
| CWRF 7872CL: Yuen Long South development— stage 2A works—site formation and engineering infrastructure and stages 2B and 3 works—detailed design and site investigation 2026-27 · Estimate |
1,147,960 | PDF p.6 printed 57 |
7872CL Yuen Long South development— stage 2A works—site formation and engineering infrastructure and stages 2B and 3 works—detailed design and site investigation .................... 4,994,400 1,055,008 855,218 1,147,960 |
| CWRF 7898CL: approved project estimate — Tung Chung New Town Extension— Site Formation and Infrastructure Works (Second Phase) 2026-27 · Estimate |
4,758,100 | PDF p.6 printed 57 |
7898CL Tung Chung New Town Extension— Site Formation and Infrastructure Works (Second Phase) ............................. 4,758,100 — 188,120 1,353,440 |
| CWRF 7872CL: approved project estimate — Yuen Long South development— stage 2A works—site formation and engineering infrastructure and stages 2B and 3 works—detailed design and site investigation 2026-27 · Estimate |
4,994,400 | PDF p.6 printed 57 |
7872CL Yuen Long South development— stage 2A works—site formation and engineering infrastructure and stages 2B and 3 works—detailed design and site investigation .................... 4,994,400 1,055,008 855,218 1,147,960 |
| Head 707 New Towns — Civil Engineering—Land development (sub-total; incl. Northern Metropolis new development areas) 2025-26 · Revised estimate |
17,023,861 | PDF p.7 printed 58 |
Sub-total .............................................. 249,028,800 71,329,711 17,023,861 20,751,129 |
| Head 707 New Towns — Civil Engineering—Land development (sub-total; incl. Northern Metropolis new development areas) 2026-27 · Estimate |
20,751,129 | PDF p.7 printed 58 |
Sub-total .............................................. 249,028,800 71,329,711 17,023,861 20,751,129 |
| CWRF 7785TH: Trunk Road T2 and Cha Kwo Ling Tunnel—construction 2026-27 · Estimate |
1,650,000 | PDF p.7 printed 58 |
7785TH Trunk Road T2 and Cha Kwo Ling Tunnel—construction ..............................16,017,000 9,335,062 2,941,516 1,650,000 |
| CWRF 7705TH: Trunk Road T4 in Sha Tin 2026-27 · Estimate |
1,437,500 | PDF p.7 printed 58 |
7705TH Trunk Road T4 in Sha Tin ............................ 6,810,000 149,840 866,519 1,437,500 |
| CWRF 7785TH: approved project estimate — Trunk Road T2 and Cha Kwo Ling Tunnel—construction 2026-27 · Estimate |
16,017,000 | PDF p.7 printed 58 |
7785TH Trunk Road T2 and Cha Kwo Ling Tunnel—construction ..............................16,017,000 9,335,062 2,941,516 1,650,000 |
| CWRF 7705TH: approved project estimate — Trunk Road T4 in Sha Tin 2026-27 · Estimate |
6,810,000 | PDF p.7 printed 58 |
7705TH Trunk Road T4 in Sha Tin ............................ 6,810,000 149,840 866,519 1,437,500 |
IRD PAM 61(e) Allowances, Deductions and Tax Rate Table (Salaries Tax / Personal Assessment), August 2026 (24)
https://www.ird.gov.hk/eng/pdf/pam61e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Progressive band 1 width (net chargeable income) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the First 50,000 2% 1,000 50,000 2% 1,000 |
| Progressive band 1 marginal rate (YA2025/26) YA2025/26 · Actual |
2 % | PDF p.1 printed PAM 61(e) |
On the First 50,000 2% 1,000 50,000 2% 1,000 |
| Progressive band 2 width (net chargeable income) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 6% 3,000 50,000 6% 3,000 |
| Progressive band 2 marginal rate (YA2025/26) YA2025/26 · Actual |
6 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 6% 3,000 50,000 6% 3,000 |
| Progressive band 3 width (net chargeable income) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 10% 5,000 50,000 10% 5,000 |
| Progressive band 3 marginal rate (YA2025/26) YA2025/26 · Actual |
10 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 10% 5,000 50,000 10% 5,000 |
| Progressive band 4 width (net chargeable income) (YA2025/26) YA2025/26 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 14% 7,000 50,000 14% 7,000 |
| Progressive band 4 marginal rate (YA2025/26) YA2025/26 · Actual |
14 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 14% 7,000 50,000 14% 7,000 |
| Progressive rate on remainder above $200,000 net chargeable income (YA2025/26) YA2025/26 · Actual |
17 % | PDF p.1 printed PAM 61(e) |
Remainder 17% 17% |
| Two-tiered standard rate threshold (net income) (YA2025/26) YA2025/26 · Actual |
5,000,000 HK$ | PDF p.1 printed PAM 61(e) |
On the first $5,000,000 of net income - 15% |
| Standard rate on first $5,000,000 of net income (YA2025/26) YA2025/26 · Actual |
15 % | PDF p.1 printed PAM 61(e) |
On the first $5,000,000 of net income - 15% |
| Standard rate on net income above $5,000,000 (YA2025/26) YA2025/26 · Actual |
16 % | PDF p.1 printed PAM 61(e) |
Remainder - 16% |
| Progressive band 1 width (net chargeable income) (YA2026/27) YA2026/27 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the First 50,000 2% 1,000 50,000 2% 1,000 |
| Progressive band 1 marginal rate (YA2026/27) YA2026/27 · Actual |
2 % | PDF p.1 printed PAM 61(e) |
On the First 50,000 2% 1,000 50,000 2% 1,000 |
| Progressive band 2 width (net chargeable income) (YA2026/27) YA2026/27 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 6% 3,000 50,000 6% 3,000 |
| Progressive band 2 marginal rate (YA2026/27) YA2026/27 · Actual |
6 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 6% 3,000 50,000 6% 3,000 |
| Progressive band 3 width (net chargeable income) (YA2026/27) YA2026/27 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 10% 5,000 50,000 10% 5,000 |
| Progressive band 3 marginal rate (YA2026/27) YA2026/27 · Actual |
10 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 10% 5,000 50,000 10% 5,000 |
| Progressive band 4 width (net chargeable income) (YA2026/27) YA2026/27 · Actual |
50,000 HK$ | PDF p.1 printed PAM 61(e) |
On the Next 50,000 14% 7,000 50,000 14% 7,000 |
| Progressive band 4 marginal rate (YA2026/27) YA2026/27 · Actual |
14 % | PDF p.1 printed PAM 61(e) |
On the Next 50,000 14% 7,000 50,000 14% 7,000 |
| Progressive rate on remainder above $200,000 net chargeable income (YA2026/27) YA2026/27 · Actual |
17 % | PDF p.1 printed PAM 61(e) |
Remainder 17% 17% |
| Two-tiered standard rate threshold (net income) (YA2026/27) YA2026/27 · Actual |
5,000,000 HK$ | PDF p.1 printed PAM 61(e) |
On the first $5,000,000 of net income - 15% |
| Standard rate on first $5,000,000 of net income (YA2026/27) YA2026/27 · Actual |
15 % | PDF p.1 printed PAM 61(e) |
On the first $5,000,000 of net income - 15% |
| Standard rate on net income above $5,000,000 (YA2026/27) YA2026/27 · Actual |
16 % | PDF p.1 printed PAM 61(e) |
Remainder - 16% |
Estimates for the year ending 31 March 2027 – Volume I – Head 37 — Department of Health (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (24)
https://www.budget.gov.hk/2026/eng/pdf/head037.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Department of Health — Programme (1) Statutory Functions 2026-27 · Estimate |
2,019.2 | PDF p.13 printed 170 |
(1) Statutory Functions ............................... 1,558.1 1,986.4 1,877.5 2,019.2 |
| Department of Health — Programme (1) Statutory Functions 2025-26 · Revised estimate |
1,877.5 | PDF p.13 printed 170 |
(1) Statutory Functions ............................... 1,558.1 1,986.4 1,877.5 2,019.2 |
| Department of Health — Programme (1) Statutory Functions 2024-25 · Actual |
1,558.1 | PDF p.13 printed 170 |
(1) Statutory Functions ............................... 1,558.1 1,986.4 1,877.5 2,019.2 |
| Department of Health — Programme (2) Disease Prevention 2026-27 · Estimate |
8,290.9 | PDF p.13 printed 170 |
(2) Disease Prevention ................................ 7,362.8 8,384.2 7,793.7 8,290.9 |
| Department of Health — Programme (2) Disease Prevention 2025-26 · Revised estimate |
7,793.7 | PDF p.13 printed 170 |
(2) Disease Prevention ................................ 7,362.8 8,384.2 7,793.7 8,290.9 |
| Department of Health — Programme (2) Disease Prevention 2024-25 · Actual |
7,362.8 | PDF p.13 printed 170 |
(2) Disease Prevention ................................ 7,362.8 8,384.2 7,793.7 8,290.9 |
| Department of Health — Programme (3) Health Promotion 2026-27 · Estimate |
584.4 | PDF p.13 printed 170 |
(3) Health Promotion .................................. 496.7 593.5 577.1 584.4 |
| Department of Health — Programme (3) Health Promotion 2025-26 · Revised estimate |
577.1 | PDF p.13 printed 170 |
(3) Health Promotion .................................. 496.7 593.5 577.1 584.4 |
| Department of Health — Programme (3) Health Promotion 2024-25 · Actual |
496.7 | PDF p.13 printed 170 |
(3) Health Promotion .................................. 496.7 593.5 577.1 584.4 |
| Department of Health — Programme (4) Curative Care 2026-27 · Estimate |
1,310.2 | PDF p.13 printed 170 |
(4) Curative Care ........................................ 1,315.2 1,380.0 1,273.1 1,310.2 |
| Department of Health — Programme (4) Curative Care 2025-26 · Revised estimate |
1,273.1 | PDF p.13 printed 170 |
(4) Curative Care ........................................ 1,315.2 1,380.0 1,273.1 1,310.2 |
| Department of Health — Programme (4) Curative Care 2024-25 · Actual |
1,315.2 | PDF p.13 printed 170 |
(4) Curative Care ........................................ 1,315.2 1,380.0 1,273.1 1,310.2 |
| Department of Health — Programme (5) Rehabilitation 2026-27 · Estimate |
193.0 | PDF p.13 printed 170 |
(5) Rehabilitation ........................................ 166.2 202.3 184.2 193.0 |
| Department of Health — Programme (5) Rehabilitation 2025-26 · Revised estimate |
184.2 | PDF p.13 printed 170 |
(5) Rehabilitation ........................................ 166.2 202.3 184.2 193.0 |
| Department of Health — Programme (5) Rehabilitation 2024-25 · Actual |
166.2 | PDF p.13 printed 170 |
(5) Rehabilitation ........................................ 166.2 202.3 184.2 193.0 |
| Department of Health — Programme (6) Treatment of Drug Abusers 2026-27 · Estimate |
218.6 | PDF p.13 printed 170 |
(6) Treatment of Drug Abusers................... 210.0 219.3 212.7 218.6 |
| Department of Health — Programme (6) Treatment of Drug Abusers 2025-26 · Revised estimate |
212.7 | PDF p.13 printed 170 |
(6) Treatment of Drug Abusers................... 210.0 219.3 212.7 218.6 |
| Department of Health — Programme (6) Treatment of Drug Abusers 2024-25 · Actual |
210.0 | PDF p.13 printed 170 |
(6) Treatment of Drug Abusers................... 210.0 219.3 212.7 218.6 |
| Department of Health — Programme (7) Medical and Dental Treatment for Civil Servants 2026-27 · Estimate |
3,079.9 | PDF p.13 printed 170 |
(7) Medical and Dental Treatment for Civil Servants ........................................ 2,547.4 2,923.7 2,630.5 3,079.9 |
| Department of Health — Programme (7) Medical and Dental Treatment for Civil Servants 2025-26 · Revised estimate |
2,630.5 | PDF p.13 printed 170 |
(7) Medical and Dental Treatment for Civil Servants ........................................ 2,547.4 2,923.7 2,630.5 3,079.9 |
| Department of Health — Programme (7) Medical and Dental Treatment for Civil Servants 2024-25 · Actual |
2,547.4 | PDF p.13 printed 170 |
(7) Medical and Dental Treatment for Civil Servants ........................................ 2,547.4 2,923.7 2,630.5 3,079.9 |
| Department of Health — Programme (8) Personnel Management of Civil Servants Working in Hospital Authority 2026-27 · Estimate |
11.5 | PDF p.13 printed 170 |
(8) Personnel Management of Civil Servants Working in Hospital Authority ............................................... 11.7 11.5 11.5 11.5 |
| Department of Health — Programme (8) Personnel Management of Civil Servants Working in Hospital Authority 2025-26 · Revised estimate |
11.5 | PDF p.13 printed 170 |
(8) Personnel Management of Civil Servants Working in Hospital Authority ............................................... 11.7 11.5 11.5 11.5 |
| Department of Health — Programme (8) Personnel Management of Civil Servants Working in Hospital Authority 2024-25 · Actual |
11.7 | PDF p.13 printed 170 |
(8) Personnel Management of Civil Servants Working in Hospital Authority ............................................... 11.7 11.5 11.5 11.5 |
Inland Revenue Department Annual Report 2024-25 (23)
https://www.ird.gov.hk/dar/2024-25/table/en/ar_2425.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Salaries taxpayers (YA2023/24) YA2023/24 · Statistic |
1,965,135 | PDF p.11 printed 9 |
Total number of taxpayers 1,833,827 1,965,135 |
| Total final salaries tax assessed (YA2023/24) YA2023/24 · Statistic |
88,973 HK$ million | PDF p.11 printed 9 |
Total final tax assessed ($m) 83,079 88,973 |
| Salaries taxpayers charged at standard rate (YA2023/24) YA2023/24 · Statistic |
26,719 | PDF p.11 printed 9 |
Standard rate taxpayers 26,919 26,719 |
| Standard-rate taxpayers as % of all salaries taxpayers (YA2023/24) YA2023/24 · Statistic |
1.4 % | PDF p.11 printed 9 |
Percentage 1.5% 1.4% |
| Share of final salaries tax paid by standard-rate taxpayers (YA2023/24) YA2023/24 · Statistic |
27.8 % | PDF p.11 printed 9 |
Percentage 30.8% 27.8% |
| Number of salaries taxpayers, annual income $132,001 - 200,000 (YA2023/24) YA2023/24 · Statistic |
156,017 | PDF p.60 printed 58 |
132,001 - 200,000 156,017 7.94 0 26,813,546 20,710,082 25,395 79,750 43,820 1,978 487,366 31,665 14,379 76,615 28,123 5,314,373 0 0.00 0 |
| Number of salaries taxpayers, annual income $200,001 - 300,000 (YA2023/24) YA2023/24 · Statistic |
419,305 | PDF p.60 printed 58 |
200,001 - 300,000 419,305 21.34 912 105,820,457 63,445,719 320,604 365,883 738,070 31,105 2,505,187 208,741 311,125 354,195 636,997 36,902,831 668,374 0.75 1,594 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $132,001 - 200,000 (YA2023/24) YA2023/24 · Statistic |
0 HK$ million | PDF p.60 printed 58 |
132,001 - 200,000 156,017 7.94 0 26,813,546 20,710,082 25,395 79,750 43,820 1,978 487,366 31,665 14,379 76,615 28,123 5,314,373 0 0.00 0 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $200,001 - 300,000 (YA2023/24) YA2023/24 · Statistic |
668.374 HK$ million | PDF p.60 printed 58 |
200,001 - 300,000 419,305 21.34 912 105,820,457 63,445,719 320,604 365,883 738,070 31,105 2,505,187 208,741 311,125 354,195 636,997 36,902,831 668,374 0.75 1,594 |
| Number of salaries taxpayers, annual income $1,000,001 - 1,500,000 (YA2023/24) YA2023/24 · Statistic |
127,376 | PDF p.60 printed 58 |
1,000,001 - 1,500,000 127,376 6.48 9,250 153,177,690 41,249,747 282,817 1,108,247 2,945,203 87,518 1,665,928 650,238 2,413,241 357,760 870,146 101,546,845 14,592,239 16.41 114,560 |
| Number of salaries taxpayers, annual income $1,500,001 - 2,000,000 (YA2023/24) YA2023/24 · Statistic |
48,701 | PDF p.60 printed 58 |
1,500,001 - 2,000,000 48,701 2.48 2,553 83,349,090 16,037,265 92,880 563,962 1,144,540 37,230 609,890 289,665 1,002,120 129,452 323,503 63,118,583 9,707,467 10.91 199,328 |
| Number of salaries taxpayers, annual income $2,000,001 - 3,000,000 (YA2023/24) YA2023/24 · Statistic |
35,216 | PDF p.60 printed 58 |
2,000,001 - 3,000,000 35,216 1.79 1,497 84,202,394 10,536,295 70,176 557,583 778,081 21,297 414,924 222,937 675,299 81,018 236,322 70,608,462 11,024,041 12.39 313,041 |
| Number of salaries taxpayers, annual income $3,000,001 - 5,000,000 (YA2023/24) YA2023/24 · Statistic |
17,244 | PDF p.60 printed 58 |
3,000,001 - 5,000,000 17,244 0.88 465 64,613,488 3,741,322 24,849 416,288 320,701 8,073 195,507 111,281 282,233 32,903 116,454 59,363,877 9,184,634 10.32 532,628 |
| Number of salaries taxpayers, annual income $5,000,001 - 7,500,000 (YA2023/24) YA2023/24 · Statistic |
5,102 | PDF p.60 printed 58 |
5,000,001 - 7,500,000 5,102 0.26 57 30,586,108 348,743 5,432 201,105 85,883 2,416 57,405 26,920 66,693 8,223 31,507 29,751,781 4,490,518 5.05 880,149 |
| Number of salaries taxpayers, annual income $7,500,001 - 10,000,000 (YA2023/24) YA2023/24 · Statistic |
1,988 | PDF p.60 printed 58 |
7,500,001 - 10,000,000 1,988 0.10 5 17,027,439 6,389 1,961 114,134 30,010 510 21,660 8,850 23,099 3,371 13,713 16,803,742 2,515,396 2.83 1,265,290 |
| Number of salaries taxpayers, annual income $10,000,001 & over (YA2023/24) YA2023/24 · Statistic |
2,899 | PDF p.60 printed 58 |
10,000,001 & over 2,899 0.15 5 67,470,533 0 2,194 526,517 37,983 736 31,687 9,087 25,717 3,504 23,215 66,809,893 10,012,789 11.25 3,453,877 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $1,000,001 - 1,500,000 (YA2023/24) YA2023/24 · Statistic |
14,592.239 HK$ million | PDF p.60 printed 58 |
1,000,001 - 1,500,000 127,376 6.48 9,250 153,177,690 41,249,747 282,817 1,108,247 2,945,203 87,518 1,665,928 650,238 2,413,241 357,760 870,146 101,546,845 14,592,239 16.41 114,560 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $1,500,001 - 2,000,000 (YA2023/24) YA2023/24 · Statistic |
9,707.467 HK$ million | PDF p.60 printed 58 |
1,500,001 - 2,000,000 48,701 2.48 2,553 83,349,090 16,037,265 92,880 563,962 1,144,540 37,230 609,890 289,665 1,002,120 129,452 323,503 63,118,583 9,707,467 10.91 199,328 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $2,000,001 - 3,000,000 (YA2023/24) YA2023/24 · Statistic |
11,024.041 HK$ million | PDF p.60 printed 58 |
2,000,001 - 3,000,000 35,216 1.79 1,497 84,202,394 10,536,295 70,176 557,583 778,081 21,297 414,924 222,937 675,299 81,018 236,322 70,608,462 11,024,041 12.39 313,041 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $3,000,001 - 5,000,000 (YA2023/24) YA2023/24 · Statistic |
9,184.634 HK$ million | PDF p.60 printed 58 |
3,000,001 - 5,000,000 17,244 0.88 465 64,613,488 3,741,322 24,849 416,288 320,701 8,073 195,507 111,281 282,233 32,903 116,454 59,363,877 9,184,634 10.32 532,628 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $5,000,001 - 7,500,000 (YA2023/24) YA2023/24 · Statistic |
4,490.518 HK$ million | PDF p.60 printed 58 |
5,000,001 - 7,500,000 5,102 0.26 57 30,586,108 348,743 5,432 201,105 85,883 2,416 57,405 26,920 66,693 8,223 31,507 29,751,781 4,490,518 5.05 880,149 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $7,500,001 - 10,000,000 (YA2023/24) YA2023/24 · Statistic |
2,515.396 HK$ million | PDF p.60 printed 58 |
7,500,001 - 10,000,000 1,988 0.10 5 17,027,439 6,389 1,961 114,134 30,010 510 21,660 8,850 23,099 3,371 13,713 16,803,742 2,515,396 2.83 1,265,290 |
| Final salaries tax (HK$ million; printed in HK$'000), annual income $10,000,001 & over (YA2023/24) YA2023/24 · Statistic |
10,012.789 HK$ million | PDF p.60 printed 58 |
10,000,001 & over 2,899 0.15 5 67,470,533 0 2,194 526,517 37,983 736 31,687 9,087 25,717 3,504 23,215 66,809,893 10,012,789 11.25 3,453,877 |
Estimates for the year ending 31 March 2027 – Volume I: Summary of Revenue Estimates (21)
https://www.budget.gov.hk/2026/eng/pdf/sumrev_p_e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| General Rates 2026-27 · Estimate |
35,183 HK$ million | PDF p.2 printed 989 |
2 General Rates ........................................... 32,723,501 36,165,000 36,516,000 35,183,000 |
| Duties 2026-27 · Estimate |
8,358.7 HK$ million | PDF p.2 printed 989 |
1 Duties ....................................................... 7,330,571 6,430,600 8,116,000 8,358,700 |
| Motor Vehicle Taxes 2026-27 · Estimate |
8,880 HK$ million | PDF p.2 printed 989 |
4 Motor Vehicle Taxes ............................... 4,744,736 4,821,000 4,890,000 8,880,000 |
| Utilities 2026-27 · Estimate |
3,492.66 HK$ million | PDF p.2 printed 989 |
10 Utilities .................................................... 4,123,563 4,206,780 4,012,190 3,492,660 |
| Fees and Charges 2026-27 · Estimate |
18,698 HK$ million | PDF p.2 printed 989 |
11 Fees and Charges ..................................... 17,874,617 19,137,000 18,559,000 18,698,000 |
| Fines, Forfeitures and Penalties 2026-27 · Estimate |
1,972.83 HK$ million | PDF p.2 printed 989 |
5 Fines, Forfeitures and Penalties ............... 2,011,426 1,716,630 2,158,830 1,972,830 |
| Royalties and Concessions 2026-27 · Estimate |
5,964.8 HK$ million | PDF p.2 printed 989 |
6 Royalties and Concessions ...................... 4,681,631 5,117,800 5,406,800 5,964,800 |
| General Rates 2024-25 · Actual |
32,723.501 HK$ million | PDF p.2 printed 989 |
2 General Rates ........................................... 32,723,501 |
| Duties 2024-25 · Actual |
7,330.571 HK$ million | PDF p.2 printed 989 |
1 Duties ....................................................... 7,330,571 |
| Motor Vehicle Taxes 2024-25 · Actual |
4,744.736 HK$ million | PDF p.2 printed 989 |
4 Motor Vehicle Taxes ............................... 4,744,736 |
| Utilities 2024-25 · Actual |
4,123.563 HK$ million | PDF p.2 printed 989 |
10 Utilities .................................................... 4,123,563 |
| Fees and Charges 2024-25 · Actual |
17,874.617 HK$ million | PDF p.2 printed 989 |
11 Fees and Charges ..................................... 17,874,617 |
| Fines, Forfeitures and Penalties 2024-25 · Actual |
2,011.426 HK$ million | PDF p.2 printed 989 |
5 Fines, Forfeitures and Penalties ............... 2,011,426 |
| Royalties and Concessions 2024-25 · Actual |
4,681.631 HK$ million | PDF p.2 printed 989 |
6 Royalties and Concessions ...................... 4,681,631 |
| General Rates 2025-26 · Revised estimate |
36,516 HK$ million | PDF p.2 printed 989 |
2 General Rates ........................................... 32,723,501 36,165,000 36,516,000 |
| Duties 2025-26 · Revised estimate |
8,116 HK$ million | PDF p.2 printed 989 |
1 Duties ....................................................... 7,330,571 6,430,600 8,116,000 |
| Motor Vehicle Taxes 2025-26 · Revised estimate |
4,890 HK$ million | PDF p.2 printed 989 |
4 Motor Vehicle Taxes ............................... 4,744,736 4,821,000 4,890,000 |
| Utilities 2025-26 · Revised estimate |
4,012.19 HK$ million | PDF p.2 printed 989 |
10 Utilities .................................................... 4,123,563 4,206,780 4,012,190 |
| Fees and Charges 2025-26 · Revised estimate |
18,559 HK$ million | PDF p.2 printed 989 |
11 Fees and Charges ..................................... 17,874,617 19,137,000 18,559,000 |
| Fines, Forfeitures and Penalties 2025-26 · Revised estimate |
2,158.83 HK$ million | PDF p.2 printed 989 |
5 Fines, Forfeitures and Penalties ............... 2,011,426 1,716,630 2,158,830 |
| Royalties and Concessions 2025-26 · Revised estimate |
5,406.8 HK$ million | PDF p.2 printed 989 |
6 Royalties and Concessions ...................... 4,681,631 5,117,800 5,406,800 |
Estimates for the year ending 31 March 2027 – Volume I: Revenue Head 7 – Properties and Investments (21)
https://www.budget.gov.hk/2026/eng/pdf/head007b.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Government land licences, Government rents (other than 3% rent) and rents from short term tenancies 2026-27 · Estimate |
2,776 HK$ million | PDF p.1 printed 998 |
term tenancies ................................................ 2,783,576 2,663,000 2,634,000 2,776,000 |
| Rents from government quarters 2026-27 · Estimate |
1,193 HK$ million | PDF p.1 printed 998 |
020 Rents from government quarters ........................ 1,160,933 1,201,000 1,188,000 1,193,000 |
| Rents from government properties 2026-27 · Estimate |
1,598 HK$ million | PDF p.1 printed 998 |
030 Rents from government properties ..................... 1,219,746 1,300,000 1,251,000 1,598,000 |
| Government rents charged at 3% of rateable values (Cap. 515) 2026-27 · Estimate |
14,401 HK$ million | PDF p.1 printed 998 |
Ordinance (Cap. 515) .................................... 13,035,386 13,992,000 13,921,000 14,401,000 |
| Returns on equity investments in statutory agencies/corporations 2026-27 · Estimate |
7,271 HK$ million | PDF p.1 printed 998 |
agencies/corporations .................................... 9,070,768 9,632,000 8,371,000 7,271,000 |
| Recovery from Housing Authority under the current financial arrangement 2026-27 · Estimate |
3,565 HK$ million | PDF p.1 printed 998 |
current financial arrangement ........................ 2,656,444 2,104,000 1,499,000 3,565,000 |
| Investment income and interest (GRA) 2026-27 · Estimate |
9,561 HK$ million | PDF p.1 printed 998 |
040 Investment income and interest.......................... 5,403,985 6,258,000 7,552,000 9,561,000 |
| Government land licences, Government rents (other than 3% rent) and rents from short term tenancies 2024-25 · Actual |
2,783.576 HK$ million | PDF p.1 printed 998 |
term tenancies ................................................ 2,783,576 |
| Rents from government quarters 2024-25 · Actual |
1,160.933 HK$ million | PDF p.1 printed 998 |
020 Rents from government quarters ........................ 1,160,933 |
| Rents from government properties 2024-25 · Actual |
1,219.746 HK$ million | PDF p.1 printed 998 |
030 Rents from government properties ..................... 1,219,746 |
| Government rents charged at 3% of rateable values (Cap. 515) 2024-25 · Actual |
13,035.386 HK$ million | PDF p.1 printed 998 |
Ordinance (Cap. 515) .................................... 13,035,386 |
| Investment income and interest (GRA) 2024-25 · Actual |
5,403.985 HK$ million | PDF p.1 printed 998 |
040 Investment income and interest.......................... 5,403,985 |
| Returns on equity investments in statutory agencies/corporations 2024-25 · Actual |
9,070.768 HK$ million | PDF p.1 printed 998 |
agencies/corporations .................................... 9,070,768 |
| Recovery from Housing Authority under the current financial arrangement 2024-25 · Actual |
2,656.444 HK$ million | PDF p.1 printed 998 |
current financial arrangement ........................ 2,656,444 |
| Government land licences, Government rents (other than 3% rent) and rents from short term tenancies 2025-26 · Revised estimate |
2,634 HK$ million | PDF p.1 printed 998 |
term tenancies ................................................ 2,783,576 2,663,000 2,634,000 |
| Rents from government quarters 2025-26 · Revised estimate |
1,188 HK$ million | PDF p.1 printed 998 |
020 Rents from government quarters ........................ 1,160,933 1,201,000 1,188,000 |
| Rents from government properties 2025-26 · Revised estimate |
1,251 HK$ million | PDF p.1 printed 998 |
030 Rents from government properties ..................... 1,219,746 1,300,000 1,251,000 |
| Government rents charged at 3% of rateable values (Cap. 515) 2025-26 · Revised estimate |
13,921 HK$ million | PDF p.1 printed 998 |
Ordinance (Cap. 515) .................................... 13,035,386 13,992,000 13,921,000 |
| Investment income and interest (GRA) 2025-26 · Revised estimate |
7,552 HK$ million | PDF p.1 printed 998 |
040 Investment income and interest.......................... 5,403,985 6,258,000 7,552,000 |
| Returns on equity investments in statutory agencies/corporations 2025-26 · Revised estimate |
8,371 HK$ million | PDF p.1 printed 998 |
agencies/corporations .................................... 9,070,768 9,632,000 8,371,000 |
| Recovery from Housing Authority under the current financial arrangement 2025-26 · Revised estimate |
1,499 HK$ million | PDF p.1 printed 998 |
current financial arrangement ........................ 2,656,444 2,104,000 1,499,000 |
C&SD Quarterly Report on General Household Survey, Second Quarter 2026 (released 28 August 2026) (20)
https://www.censtatd.gov.hk/wbr/B1050001/B10500012026QQ02/att/en/B10500012026QQ02.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Median monthly employment earnings of employed persons (Q2 2026) 2026 · Statistic |
21,000 HK$ | PDF p.1 printed 1 / 54 |
The total employment was 3 646 100 and the median monthly employment earnings was HK$21,000 in Q2 2026. |
| Employed persons (2023 annual) 2023 · Statistic |
3,709,600 persons | PDF p.2 printed 2 / 54 |
Employed persons No. ('000) 3 709.6 3 693.6 3 672.0 |
| Median monthly domestic household income (Q2 2026) 2026 · Statistic |
30,000 HK$ | PDF p.17 printed 17 / 54 |
The median monthly household income was HK$30,000 in Q2 2026. As for economically active domestic households, the median monthly household |
| Domestic households (Q2 2026) 2026 · Statistic |
2,794,200 | PDF p.17 printed 17 / 54 |
The number of domestic households in Q2 2026 was 2 794 200, of which 74.3% were economically active households. |
| Domestic households with monthly income HK$< 4,000 (Q2 2026) 2026 · Statistic |
157,500 | PDF p.47 printed 47 / 54 |
< 4,000 162.8 r 168.4 r 167.4 r 172.1 157.5 |
| Domestic households with monthly income HK$4,000 - 5,999 (Q2 2026) 2026 · Statistic |
112,700 | PDF p.47 printed 47 / 54 |
4,000 - 5,999 116.1 r 148.6 r 142.5 r 139.1 112.7 |
| Domestic households with monthly income HK$6,000 - 7,999 (Q2 2026) 2026 · Statistic |
99,800 | PDF p.47 printed 47 / 54 |
6,000 - 7,999 125.5 r 105.0 r 106.7 r 105.4 99.8 |
| Domestic households with monthly income HK$8,000 - 9,999 (Q2 2026) 2026 · Statistic |
178,400 | PDF p.47 printed 47 / 54 |
8,000 - 9,999 149.8 r 158.7 r 162.5 r 168.5 178.4 |
| Domestic households with monthly income HK$10,000 - 14,999 (Q2 2026) 2026 · Statistic |
187,500 | PDF p.47 printed 47 / 54 |
10,000 - 14,999 196.2 r 187.3 r 184.4 r 183.6 187.5 |
| Domestic households with monthly income HK$15,000 - 19,999 (Q2 2026) 2026 · Statistic |
227,500 | PDF p.47 printed 47 / 54 |
15,000 - 19,999 205.8 r 210.9 r 204.8 r 206.0 227.5 |
| Domestic households with monthly income HK$20,000 - 24,999 (Q2 2026) 2026 · Statistic |
220,000 | PDF p.47 printed 47 / 54 |
20,000 - 24,999 221.8 r 222.1 r 215.5 r 223.9 220.0 |
| Domestic households with monthly income HK$25,000 - 29,999 (Q2 2026) 2026 · Statistic |
178,600 | PDF p.47 printed 47 / 54 |
25,000 - 29,999 180.2 r 180.6 r 177.2 r 162.3 178.6 |
| Domestic households with monthly income HK$30,000 - 34,999 (Q2 2026) 2026 · Statistic |
183,800 | PDF p.47 printed 47 / 54 |
30,000 - 34,999 180.7 r 177.0 r 175.4 r 169.8 183.8 |
| Domestic households with monthly income HK$35,000 - 39,999 (Q2 2026) 2026 · Statistic |
147,700 | PDF p.47 printed 47 / 54 |
35,000 - 39,999 149.9 r 147.7 r 149.2 r 141.4 147.7 |
| Domestic households with monthly income HK$40,000 - 44,999 (Q2 2026) 2026 · Statistic |
133,000 | PDF p.47 printed 47 / 54 |
40,000 - 44,999 136.7 r 144.1 r 133.6 r 130.9 133.0 |
| Domestic households with monthly income HK$45,000 - 49,999 (Q2 2026) 2026 · Statistic |
107,300 | PDF p.47 printed 47 / 54 |
45,000 - 49,999 107.5 r 111.0 r 116.8 r 108.6 107.3 |
| Domestic households with monthly income HK$50,000 - 59,999 (Q2 2026) 2026 · Statistic |
188,800 | PDF p.47 printed 47 / 54 |
50,000 - 59,999 192.1 r 189.0 r 184.7 r 178.8 188.8 |
| Domestic households with monthly income HK$60,000 - 79,999 (Q2 2026) 2026 · Statistic |
253,900 | PDF p.47 printed 47 / 54 |
60,000 - 79,999 235.5 r 232.0 r 246.9 r 248.2 253.9 |
| Domestic households with monthly income HK$80,000 - 99,999 (Q2 2026) 2026 · Statistic |
145,300 | PDF p.47 printed 47 / 54 |
80,000 - 99,999 143.3 r 140.9 r 143.9 r 156.9 145.3 |
| Domestic households with monthly income HK$≥ 100,000 (Q2 2026) 2026 · Statistic |
272,400 | PDF p.47 printed 47 / 54 |
≥ 100,000 268.1 r 256.1 r 257.5 r 285.3 272.4 |
Estimates for the year ending 31 March 2027 – Volume I – Head 62 — Government Secretariat: Housing Bureau (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (20)
https://www.budget.gov.hk/2026/eng/pdf/head062.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Housing Bureau — 2026-27 programme total excluding the Wang Fuk Court plan 2026-27 · Estimate |
1,344.7 | PDF p.9 printed 492 |
3,186.2 1,965.0 1,758.2 1,344.7α |
| Government Secretariat: Housing Bureau — Programme (1) Director of Bureau’s Office 2026-27 · Estimate |
24.6 | PDF p.9 printed 492 |
(1) Director of Bureau’s Office ......................... 24.2 24.6 24.4 24.6 |
| Government Secretariat: Housing Bureau — Programme (1) Director of Bureau’s Office 2025-26 · Revised estimate |
24.4 | PDF p.9 printed 492 |
(1) Director of Bureau’s Office ......................... 24.2 24.6 24.4 24.6 |
| Government Secretariat: Housing Bureau — Programme (1) Director of Bureau’s Office 2024-25 · Actual |
24.2 | PDF p.9 printed 492 |
(1) Director of Bureau’s Office ......................... 24.2 24.6 24.4 24.6 |
| Government Secretariat: Housing Bureau — Programme (2) Building Control 2026-27 · Estimate |
226.0 | PDF p.9 printed 492 |
(2) Building Control........................................... 180.1 176.7 215.8 226.0 |
| Government Secretariat: Housing Bureau — Programme (2) Building Control 2025-26 · Revised estimate |
215.8 | PDF p.9 printed 492 |
(2) Building Control........................................... 180.1 176.7 215.8 226.0 |
| Government Secretariat: Housing Bureau — Programme (2) Building Control 2024-25 · Actual |
180.1 | PDF p.9 printed 492 |
(2) Building Control........................................... 180.1 176.7 215.8 226.0 |
| Government Secretariat: Housing Bureau — Programme (3) Private Housing 2026-27 · Estimate |
97.3 | PDF p.9 printed 492 |
(3) Private Housing ............................................ 100.3 103.7 99.7 97.3 |
| Government Secretariat: Housing Bureau — Programme (3) Private Housing 2025-26 · Revised estimate |
99.7 | PDF p.9 printed 492 |
(3) Private Housing ............................................ 100.3 103.7 99.7 97.3 |
| Government Secretariat: Housing Bureau — Programme (3) Private Housing 2024-25 · Actual |
100.3 | PDF p.9 printed 492 |
(3) Private Housing ............................................ 100.3 103.7 99.7 97.3 |
| Government Secretariat: Housing Bureau — Programme (4) Appeal Panel (Housing) 2026-27 · Estimate |
13.1 | PDF p.9 printed 492 |
(4) Appeal Panel (Housing) ............................... 13.6 14.2 12.8 13.1 |
| Government Secretariat: Housing Bureau — Programme (4) Appeal Panel (Housing) 2025-26 · Revised estimate |
12.8 | PDF p.9 printed 492 |
(4) Appeal Panel (Housing) ............................... 13.6 14.2 12.8 13.1 |
| Government Secretariat: Housing Bureau — Programme (4) Appeal Panel (Housing) 2024-25 · Actual |
13.6 | PDF p.9 printed 492 |
(4) Appeal Panel (Housing) ............................... 13.6 14.2 12.8 13.1 |
| Government Secretariat: Housing Bureau — Programme (5) Rehousing of Occupants upon Clearance 2026-27 · Estimate |
26.9 | PDF p.9 printed 492 |
(5) Rehousing of Occupants upon Clearance ...................................................... 24.7 25.7 29.3 26.9 |
| Government Secretariat: Housing Bureau — Programme (5) Rehousing of Occupants upon Clearance 2025-26 · Revised estimate |
29.3 | PDF p.9 printed 492 |
(5) Rehousing of Occupants upon Clearance ...................................................... 24.7 25.7 29.3 26.9 |
| Government Secretariat: Housing Bureau — Programme (5) Rehousing of Occupants upon Clearance 2024-25 · Actual |
24.7 | PDF p.9 printed 492 |
(5) Rehousing of Occupants upon Clearance ...................................................... 24.7 25.7 29.3 26.9 |
| Government Secretariat: Housing Bureau — Programme (6) Support Services 2026-27 · Estimate |
956.8 | PDF p.9 printed 492 |
(6) Support Services........................................... 2,843.3 1,620.1 1,376.2 956.8 |
| Government Secretariat: Housing Bureau — Programme (6) Support Services 2025-26 · Revised estimate |
1,376.2 | PDF p.9 printed 492 |
(6) Support Services........................................... 2,843.3 1,620.1 1,376.2 956.8 |
| Government Secretariat: Housing Bureau — Programme (6) Support Services 2024-25 · Actual |
2,843.3 | PDF p.9 printed 492 |
(6) Support Services........................................... 2,843.3 1,620.1 1,376.2 956.8 |
| Housing Bureau — new commitment: Plan for Wang Fuk Court long-term housing arrangements (Subhead 700 item 804) 2026-27 · Estimate |
4,000,000 | PDF p.13 printed 496 |
804 Plan for Wang Fuk Court long-term housing arrangements§..................................4,000,000§ — — 4,000,000 |
Estimates for the year ending 31 March 2027 – Volume I: Consolidated Summary of Estimates (20)
https://www.budget.gov.hk/2026/eng/pdf/consum_p_e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Fiscal reserves at 1 April (opening balance) 2026-27 · Estimate |
657,222 HK$ million | PDF p.3 printed 16 |
Opening Balance 927,767 957,128 834,790 734,585 654,317 657,222 |
| Fiscal reserves at 31 March (closing balance) 2022-23 · Actual |
834,790 HK$ million | PDF p.3 printed 16 |
Closing Balance 957,128 834,790 |
| Fiscal reserves at 31 March (closing balance) 2021-22 · Actual |
957,128 HK$ million | PDF p.3 printed 16 |
Closing Balance 957,128 |
| Fiscal reserves at 31 March (closing balance) 2023-24 · Actual |
734,585 HK$ million | PDF p.3 printed 16 |
Closing Balance 957,128 834,790 734,585 |
| Government revenue (consolidated) 2021-22 · Actual |
693,576 HK$ million | PDF p.3 printed 16 |
Revenue# 693,576 |
| Government expenditure (consolidated) 2021-22 · Actual |
693,339 HK$ million | PDF p.3 printed 16 |
Expenditure# 693,339 |
| Government revenue (consolidated) 2022-23 · Actual |
622,147 HK$ million | PDF p.3 printed 16 |
Revenue# 693,576 622,147 |
| Government expenditure (consolidated) 2022-23 · Actual |
810,477 HK$ million | PDF p.3 printed 16 |
Expenditure# 693,339 810,477 |
| Government revenue (consolidated) 2023-24 · Actual |
549,406 HK$ million | PDF p.3 printed 16 |
Revenue# 693,576 622,147 549,406 |
| Government expenditure (consolidated) 2023-24 · Actual |
721,301 HK$ million | PDF p.3 printed 16 |
Expenditure# 693,339 810,477 721,301 |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2021-22 · Actual |
237 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) before 237 |
| Proceeds from issuance of government bonds 2021-22 · Actual |
29,124 HK$ million | PDF p.3 printed 16 |
Proceeds from Issuance of Government 29,124 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2021-22 · Actual |
29,361 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) after 29,361 |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2022-23 · Actual |
−188,330 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) before 237 (188,330) |
| Proceeds from issuance of government bonds 2022-23 · Actual |
65,992 HK$ million | PDF p.3 printed 16 |
Proceeds from Issuance of Government 29,124 65,992 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2022-23 · Actual |
−122,338 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) after 29,361 (122,338) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2023-24 · Actual |
−171,895 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) before 237 (188,330) (171,895) |
| Proceeds from issuance of government bonds 2023-24 · Actual |
72,490 HK$ million | PDF p.3 printed 16 |
Proceeds from Issuance of Government 29,124 65,992 72,490 |
| Repayment of government bonds 2023-24 · Actual |
800 HK$ million | PDF p.3 printed 16 |
Repayment of Government Bonds — — 800 |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2023-24 · Actual |
−100,205 HK$ million | PDF p.3 printed 16 |
Consolidated Surplus/(Deficit) after 29,361 (122,338) (100,205) |
Estimates for the year ending 31 March 2027 – Volume I – Head 140 — Government Secretariat: Health Bureau (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (18)
https://www.budget.gov.hk/2026/eng/pdf/head140.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Government Secretariat: Health Bureau — Programme (3) Subvention: Hospital Authority 2026-27 · Estimate |
103,059.1 | PDF p.10 printed 468 |
(3) Subvention: Hospital Authority ................... 98,796.4 100,164.4 100,168.9 103,059.1 |
| Government Secretariat: Health Bureau — Programme (1) Director of Bureau’s Office 2026-27 · Estimate |
25.6 | PDF p.10 printed 468 |
(1) Director of Bureau’s Office ......................... 23.2 24.9 24.3 25.6 |
| Government Secretariat: Health Bureau — Programme (1) Director of Bureau’s Office 2025-26 · Revised estimate |
24.3 | PDF p.10 printed 468 |
(1) Director of Bureau’s Office ......................... 23.2 24.9 24.3 25.6 |
| Government Secretariat: Health Bureau — Programme (1) Director of Bureau’s Office 2024-25 · Actual |
23.2 | PDF p.10 printed 468 |
(1) Director of Bureau’s Office ......................... 23.2 24.9 24.3 25.6 |
| Government Secretariat: Health Bureau — Programme (2) Health 2026-27 · Estimate |
4,291.2 | PDF p.10 printed 468 |
(2) Health........................................................... 2,003.2 4,384.5 4,137.9 4,291.2 |
| Government Secretariat: Health Bureau — Programme (2) Health 2025-26 · Revised estimate |
4,137.9 | PDF p.10 printed 468 |
(2) Health........................................................... 2,003.2 4,384.5 4,137.9 4,291.2 |
| Government Secretariat: Health Bureau — Programme (2) Health 2024-25 · Actual |
2,003.2 | PDF p.10 printed 468 |
(2) Health........................................................... 2,003.2 4,384.5 4,137.9 4,291.2 |
| Government Secretariat: Health Bureau — Programme (3) Subvention: Hospital Authority 2025-26 · Revised estimate |
100,168.9 | PDF p.10 printed 468 |
(3) Subvention: Hospital Authority ................... 98,796.4 100,164.4 100,168.9 103,059.1 |
| Government Secretariat: Health Bureau — Programme (3) Subvention: Hospital Authority 2024-25 · Actual |
98,796.4 | PDF p.10 printed 468 |
(3) Subvention: Hospital Authority ................... 98,796.4 100,164.4 100,168.9 103,059.1 |
| Government Secretariat: Health Bureau — Programme (4) Subvention: Prince Philip Dental Hospital 2026-27 · Estimate |
236.2 | PDF p.10 printed 468 |
(4) Subvention: Prince Philip Dental Hospital ........................................................ 237.7 238.6 238.6 236.2 |
| Government Secretariat: Health Bureau — Programme (4) Subvention: Prince Philip Dental Hospital 2025-26 · Revised estimate |
238.6 | PDF p.10 printed 468 |
(4) Subvention: Prince Philip Dental Hospital ........................................................ 237.7 238.6 238.6 236.2 |
| Government Secretariat: Health Bureau — Programme (4) Subvention: Prince Philip Dental Hospital 2024-25 · Actual |
237.7 | PDF p.10 printed 468 |
(4) Subvention: Prince Philip Dental Hospital ........................................................ 237.7 238.6 238.6 236.2 |
| Health Bureau — Subhead 979 Hospital Authority equipment and information systems (block vote) 2024-25 · Actual |
1,910,676 | PDF p.12 printed 470 |
979 Hospital Authority - equipment and information systems (block vote) ....................................... 1,910,676 1,204,178 1,204,178 1,284,659 |
| Health Bureau — Subhead 979 Hospital Authority equipment and information systems (block vote) 2025-26 · Revised estimate |
1,204,178 | PDF p.12 printed 470 |
979 Hospital Authority - equipment and information systems (block vote) ....................................... 1,910,676 1,204,178 1,204,178 1,284,659 |
| Health Bureau — Subhead 979 Hospital Authority equipment and information systems (block vote) 2026-27 · Estimate |
1,284,659 | PDF p.12 printed 470 |
979 Hospital Authority - equipment and information systems (block vote) ....................................... 1,910,676 1,204,178 1,204,178 1,284,659 |
| Health Bureau — recurrent subvention to the Hospital Authority (within Subhead 000) 2025-26 · Revised estimate |
98,964,779 | PDF p.13 printed 471 |
- Hospital Authority ................................................................. 96,885,760 98,960,189 98,964,779 101,768,482 |
| Health Bureau — recurrent subvention to the Hospital Authority (within Subhead 000) 2026-27 · Estimate |
101,768,482 | PDF p.13 printed 471 |
- Hospital Authority ................................................................. 96,885,760 98,960,189 98,964,779 101,768,482 |
| Health Bureau — recurrent subvention to the Hospital Authority (within Subhead 000) 2024-25 · Actual |
96,885,760 | PDF p.13 printed 471 |
- Hospital Authority ................................................................. 96,885,760 98,960,189 98,964,779 101,768,482 |
Estimates for the year ending 31 March 2027 – Volume I – Head 112 — Legislative Council Commission (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (18)
https://www.budget.gov.hk/2026/eng/pdf/head112.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Legislative Council Commission — Programme (1) Members’ Offices and Remuneration 2026-27 · Estimate |
438.6 | PDF p.10 printed 768 |
(1) Members’ Offices and Remuneration .......... 377.2 487.2 490.9 438.6 |
| Legislative Council Commission — Programme (1) Members’ Offices and Remuneration 2025-26 · Revised estimate |
490.9 | PDF p.10 printed 768 |
(1) Members’ Offices and Remuneration .......... 377.2 487.2 490.9 438.6 |
| Legislative Council Commission — Programme (1) Members’ Offices and Remuneration 2024-25 · Actual |
377.2 | PDF p.10 printed 768 |
(1) Members’ Offices and Remuneration .......... 377.2 487.2 490.9 438.6 |
| Legislative Council Commission — Programme (2) Council Business Services 2026-27 · Estimate |
516.8 | PDF p.10 printed 768 |
(2) Council Business Services ........................... 541.2 528.0 539.6 516.8 |
| Legislative Council Commission — Programme (2) Council Business Services 2025-26 · Revised estimate |
539.6 | PDF p.10 printed 768 |
(2) Council Business Services ........................... 541.2 528.0 539.6 516.8 |
| Legislative Council Commission — Programme (2) Council Business Services 2024-25 · Actual |
541.2 | PDF p.10 printed 768 |
(2) Council Business Services ........................... 541.2 528.0 539.6 516.8 |
| Legislative Council Commission — Programme (3) Legal Service 2026-27 · Estimate |
65.2 | PDF p.10 printed 768 |
(3) Legal Service................................................ 71.6 69.3 70.0 65.2 |
| Legislative Council Commission — Programme (3) Legal Service 2025-26 · Revised estimate |
70.0 | PDF p.10 printed 768 |
(3) Legal Service................................................ 71.6 69.3 70.0 65.2 |
| Legislative Council Commission — Programme (3) Legal Service 2024-25 · Actual |
71.6 | PDF p.10 printed 768 |
(3) Legal Service................................................ 71.6 69.3 70.0 65.2 |
| Legislative Council Commission — Programme (4) Redress System 2026-27 · Estimate |
25.2 | PDF p.10 printed 768 |
(4) Redress System ............................................ 26.1 28.5 25.6 25.2 |
| Legislative Council Commission — Programme (4) Redress System 2025-26 · Revised estimate |
25.6 | PDF p.10 printed 768 |
(4) Redress System ............................................ 26.1 28.5 25.6 25.2 |
| Legislative Council Commission — Programme (4) Redress System 2024-25 · Actual |
26.1 | PDF p.10 printed 768 |
(4) Redress System ............................................ 26.1 28.5 25.6 25.2 |
| Legislative Council Commission — Programme (5) Library and Archives Services 2026-27 · Estimate |
69.1 | PDF p.10 printed 768 |
(5) Library and Archives Services ..................... 54.8 55.9 55.5 69.1 |
| Legislative Council Commission — Programme (5) Library and Archives Services 2025-26 · Revised estimate |
55.5 | PDF p.10 printed 768 |
(5) Library and Archives Services ..................... 54.8 55.9 55.5 69.1 |
| Legislative Council Commission — Programme (5) Library and Archives Services 2024-25 · Actual |
54.8 | PDF p.10 printed 768 |
(5) Library and Archives Services ..................... 54.8 55.9 55.5 69.1 |
| Legislative Council Commission — Programme (6) Corporate Liaison and Education and Visitor Services 2026-27 · Estimate |
62.5 | PDF p.10 printed 768 |
(6) Corporate Liaison and Education and Visitor Services ............................................ 62.6 59.8 64.8 62.5 |
| Legislative Council Commission — Programme (6) Corporate Liaison and Education and Visitor Services 2025-26 · Revised estimate |
64.8 | PDF p.10 printed 768 |
(6) Corporate Liaison and Education and Visitor Services ............................................ 62.6 59.8 64.8 62.5 |
| Legislative Council Commission — Programme (6) Corporate Liaison and Education and Visitor Services 2024-25 · Actual |
62.6 | PDF p.10 printed 768 |
(6) Corporate Liaison and Education and Visitor Services ............................................ 62.6 59.8 64.8 62.5 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 703 — Buildings (16)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-03.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 3033LJ: Construction of a District Court Building at Caroline Hill Road 2026-27 · Estimate |
1,739,000 | PDF p.7 printed 29 |
3033LJ Construction of a District Court Building at Caroline Hill Road ................ 5,800,000 713,215 532,600 1,739,000 |
| CWRF 3033LJ: approved project estimate — Construction of a District Court Building at Caroline Hill Road 2026-27 · Estimate |
5,800,000 | PDF p.7 printed 29 |
3033LJ Construction of a District Court Building at Caroline Hill Road ................ 5,800,000 713,215 532,600 1,739,000 |
| CWRF 3003MI: Expansion of North District Hospital—main works 2026-27 · Estimate |
5,355,000 | PDF p.9 printed 31 |
3003MI Expansion of North District Hospital—main works .............................32,508,200 432,059 3,900,000 5,355,000 |
| CWRF 3114MH: Expansion of Lai King Building in Princess Margaret Hospital— main works 2026-27 · Estimate |
1,777,000 | PDF p.9 printed 31 |
3114MH Expansion of Lai King Building in Princess Margaret Hospital— main works............................................... 5,539,900 316,347 1,000,000 1,777,000 |
| CWRF 3070MM: Redevelopment of Queen Mary Hospital, phase 1 2026-27 · Estimate |
1,290,000 | PDF p.9 printed 31 |
3070MM Redevelopment of Queen Mary Hospital, phase 1 ......................................13,556,000 7,495,685 1,230,000 1,290,000 |
| CWRF 3116MH: The development of Chinese Medicine Hospital in Tseung Kwan O 2026-27 · Estimate |
1,145,000 | PDF p.9 printed 31 |
3116MH The development of Chinese Medicine Hospital in Tseung Kwan O ....................................... 8,620,000 3,491,672 2,350,000 1,145,000 |
| CWRF 3003MI: approved project estimate — Expansion of North District Hospital—main works 2026-27 · Estimate |
32,508,200 | PDF p.9 printed 31 |
3003MI Expansion of North District Hospital—main works .............................32,508,200 432,059 3,900,000 5,355,000 |
| CWRF 3114MH: approved project estimate — Expansion of Lai King Building in Princess Margaret Hospital— main works 2026-27 · Estimate |
5,539,900 | PDF p.9 printed 31 |
3114MH Expansion of Lai King Building in Princess Margaret Hospital— main works............................................... 5,539,900 316,347 1,000,000 1,777,000 |
| CWRF 3070MM: approved project estimate — Redevelopment of Queen Mary Hospital, phase 1 2026-27 · Estimate |
13,556,000 | PDF p.9 printed 31 |
3070MM Redevelopment of Queen Mary Hospital, phase 1 ......................................13,556,000 7,495,685 1,230,000 1,290,000 |
| CWRF 3116MH: approved project estimate — The development of Chinese Medicine Hospital in Tseung Kwan O 2026-27 · Estimate |
8,620,000 | PDF p.9 printed 31 |
3116MH The development of Chinese Medicine Hospital in Tseung Kwan O ....................................... 8,620,000 3,491,672 2,350,000 1,145,000 |
| Head 703 Buildings — Health—Hospitals (sub-total) 2026-27 · Estimate |
22,731,400 | PDF p.10 printed 32 |
Sub-total .............................................. 139,841,800 37,795,329 18,100,300 22,731,400 |
| Head 703 Buildings — Health—Hospitals (sub-total) 2025-26 · Revised estimate |
18,100,300 | PDF p.10 printed 32 |
Sub-total .............................................. 139,841,800 37,795,329 18,100,300 22,731,400 |
| CWRF 3087MM: New Acute Hospital at Kai Tak Development Area—main works 2026-27 · Estimate |
6,700,000 | PDF p.10 printed 32 |
3087MM New Acute Hospital at Kai Tak Development Area—main works...............30,441,100 5,510,007 5,100,000 6,700,000 |
| CWRF 3075MM: Redevelopment of Prince of Wales Hospital, phase 2 (stage 1)— main works 2026-27 · Estimate |
5,300,000 | PDF p.10 printed 32 |
3075MM Redevelopment of Prince of Wales Hospital, phase 2 (stage 1)— main works...............................................21,978,800 1,006,494 2,800,000 5,300,000 |
| CWRF 3087MM: approved project estimate — New Acute Hospital at Kai Tak Development Area—main works 2026-27 · Estimate |
30,441,100 | PDF p.10 printed 32 |
3087MM New Acute Hospital at Kai Tak Development Area—main works...............30,441,100 5,510,007 5,100,000 6,700,000 |
| CWRF 3075MM: approved project estimate — Redevelopment of Prince of Wales Hospital, phase 2 (stage 1)— main works 2026-27 · Estimate |
21,978,800 | PDF p.10 printed 32 |
3075MM Redevelopment of Prince of Wales Hospital, phase 2 (stage 1)— main works...............................................21,978,800 1,006,494 2,800,000 5,300,000 |
Estimates for the year ending 31 March 2027 – Volume I – Head 31 — Customs and Excise Department (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (15)
https://www.budget.gov.hk/2026/eng/pdf/head031.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Customs and Excise Department — Programme (1) Control and Enforcement 2026-27 · Estimate |
4,859.5 | PDF p.12 printed 153 |
(1) Control and Enforcement ............................. 4,648.4 4,796.6 4,616.9 4,859.5 |
| Customs and Excise Department — Programme (1) Control and Enforcement 2025-26 · Revised estimate |
4,616.9 | PDF p.12 printed 153 |
(1) Control and Enforcement ............................. 4,648.4 4,796.6 4,616.9 4,859.5 |
| Customs and Excise Department — Programme (1) Control and Enforcement 2024-25 · Actual |
4,648.4 | PDF p.12 printed 153 |
(1) Control and Enforcement ............................. 4,648.4 4,796.6 4,616.9 4,859.5 |
| Customs and Excise Department — Programme (2) Anti-narcotics Investigation 2026-27 · Estimate |
306.6 | PDF p.12 printed 153 |
(2) Anti-narcotics Investigation ......................... 304.5 311.7 306.0 306.6 |
| Customs and Excise Department — Programme (2) Anti-narcotics Investigation 2025-26 · Revised estimate |
306.0 | PDF p.12 printed 153 |
(2) Anti-narcotics Investigation ......................... 304.5 311.7 306.0 306.6 |
| Customs and Excise Department — Programme (2) Anti-narcotics Investigation 2024-25 · Actual |
304.5 | PDF p.12 printed 153 |
(2) Anti-narcotics Investigation ......................... 304.5 311.7 306.0 306.6 |
| Customs and Excise Department — Programme (3) Intellectual Property Rights and Consumer Protection 2026-27 · Estimate |
538.3 | PDF p.12 printed 153 |
(3) Intellectual Property Rights and Consumer Protection .................................... 478.3 541.7 477.0 538.3 |
| Customs and Excise Department — Programme (3) Intellectual Property Rights and Consumer Protection 2025-26 · Revised estimate |
477.0 | PDF p.12 printed 153 |
(3) Intellectual Property Rights and Consumer Protection .................................... 478.3 541.7 477.0 538.3 |
| Customs and Excise Department — Programme (3) Intellectual Property Rights and Consumer Protection 2024-25 · Actual |
478.3 | PDF p.12 printed 153 |
(3) Intellectual Property Rights and Consumer Protection .................................... 478.3 541.7 477.0 538.3 |
| Customs and Excise Department — Programme (4) Revenue Protection and Collection 2026-27 · Estimate |
232.5 | PDF p.12 printed 153 |
(4) Revenue Protection and Collection .............. 235.7 236.6 230.7 232.5 |
| Customs and Excise Department — Programme (4) Revenue Protection and Collection 2025-26 · Revised estimate |
230.7 | PDF p.12 printed 153 |
(4) Revenue Protection and Collection .............. 235.7 236.6 230.7 232.5 |
| Customs and Excise Department — Programme (4) Revenue Protection and Collection 2024-25 · Actual |
235.7 | PDF p.12 printed 153 |
(4) Revenue Protection and Collection .............. 235.7 236.6 230.7 232.5 |
| Customs and Excise Department — Programme (5) Trade Controls 2026-27 · Estimate |
226.1 | PDF p.12 printed 153 |
(5) Trade Controls.............................................. 225.8 230.7 224.8 226.1 |
| Customs and Excise Department — Programme (5) Trade Controls 2025-26 · Revised estimate |
224.8 | PDF p.12 printed 153 |
(5) Trade Controls.............................................. 225.8 230.7 224.8 226.1 |
| Customs and Excise Department — Programme (5) Trade Controls 2024-25 · Actual |
225.8 | PDF p.12 printed 153 |
(5) Trade Controls.............................................. 225.8 230.7 224.8 226.1 |
Estimates for the year ending 31 March 2027 – Volume I – Head 70 — Immigration Department (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (15)
https://www.budget.gov.hk/2026/eng/pdf/head070.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Immigration Department — Programme (1) Pre-entry Control 2026-27 · Estimate |
457.8 | PDF p.11 printed 644 |
(1) Pre-entry Control ......................................... 459.2 469.2 459.3 457.8 |
| Immigration Department — Programme (1) Pre-entry Control 2025-26 · Revised estimate |
459.3 | PDF p.11 printed 644 |
(1) Pre-entry Control ......................................... 459.2 469.2 459.3 457.8 |
| Immigration Department — Programme (1) Pre-entry Control 2024-25 · Actual |
459.2 | PDF p.11 printed 644 |
(1) Pre-entry Control ......................................... 459.2 469.2 459.3 457.8 |
| Immigration Department — Programme (2) Control upon Entry 2026-27 · Estimate |
4,064.1 | PDF p.11 printed 644 |
(2) Control upon Entry ...................................... 3,964.4 3,971.4 3,946.3 4,064.1 |
| Immigration Department — Programme (2) Control upon Entry 2025-26 · Revised estimate |
3,946.3 | PDF p.11 printed 644 |
(2) Control upon Entry ...................................... 3,964.4 3,971.4 3,946.3 4,064.1 |
| Immigration Department — Programme (2) Control upon Entry 2024-25 · Actual |
3,964.4 | PDF p.11 printed 644 |
(2) Control upon Entry ...................................... 3,964.4 3,971.4 3,946.3 4,064.1 |
| Immigration Department — Programme (3) Control after Entry 2026-27 · Estimate |
1,309.7 | PDF p.11 printed 644 |
(3) Control after Entry ....................................... 1,395.2 1,335.8 1,314.2 1,309.7 |
| Immigration Department — Programme (3) Control after Entry 2025-26 · Revised estimate |
1,314.2 | PDF p.11 printed 644 |
(3) Control after Entry ....................................... 1,395.2 1,335.8 1,314.2 1,309.7 |
| Immigration Department — Programme (3) Control after Entry 2024-25 · Actual |
1,395.2 | PDF p.11 printed 644 |
(3) Control after Entry ....................................... 1,395.2 1,335.8 1,314.2 1,309.7 |
| Immigration Department — Programme (4) Personal Documentation 2026-27 · Estimate |
1,468.4 | PDF p.11 printed 644 |
(4) Personal Documentation .............................. 1,519.6 1,489.0 1,482.3 1,468.4 |
| Immigration Department — Programme (4) Personal Documentation 2025-26 · Revised estimate |
1,482.3 | PDF p.11 printed 644 |
(4) Personal Documentation .............................. 1,519.6 1,489.0 1,482.3 1,468.4 |
| Immigration Department — Programme (4) Personal Documentation 2024-25 · Actual |
1,519.6 | PDF p.11 printed 644 |
(4) Personal Documentation .............................. 1,519.6 1,489.0 1,482.3 1,468.4 |
| Immigration Department — Programme (5) Nationality and Assistance to HKSAR Residents outside Hong Kong 2026-27 · Estimate |
35.4 | PDF p.11 printed 644 |
(5) Nationality and Assistance to HKSAR Residents outside Hong Kong ..................... 36.3 37.2 35.6 35.4 |
| Immigration Department — Programme (5) Nationality and Assistance to HKSAR Residents outside Hong Kong 2025-26 · Revised estimate |
35.6 | PDF p.11 printed 644 |
(5) Nationality and Assistance to HKSAR Residents outside Hong Kong ..................... 36.3 37.2 35.6 35.4 |
| Immigration Department — Programme (5) Nationality and Assistance to HKSAR Residents outside Hong Kong 2024-25 · Actual |
36.3 | PDF p.11 printed 644 |
(5) Nationality and Assistance to HKSAR Residents outside Hong Kong ..................... 36.3 37.2 35.6 35.4 |
Estimates for the year ending 31 March 2027 – Volume II: Capital Works Reserve Fund – Receipts, Movement of the Account and Revenue/Expenditure Analysis (12)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-receipts.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF donations and contributions 2026-27 · Estimate |
37.682 HK$ million | PDF p.1 printed 86 |
Donations and Contributions .................................................................................. 7,644 37,682 |
| CWRF investment income 2026-27 · Estimate |
3,968 HK$ million | PDF p.1 printed 86 |
Investment Income ................................................................................................... 4,174,848 3,968,000 |
| Land premium 2026-27 · Estimate |
18,000 HK$ million | PDF p.1 printed 86 |
Land Premium: total ............................................................................................ 17,500,000 18,000,000# |
| Transfer from Exchange Fund (investment income) 2026-27 · Estimate |
75,000 HK$ million | PDF p.1 printed 86 |
Transfer from Exchange Fund ................................................................................ — 75,000,000 |
| Land premium 2025-26 · Revised estimate |
17,500 HK$ million | PDF p.1 printed 86 |
Land Premium: total ............................................................................................ 17,500,000 |
| CWRF investment income 2025-26 · Revised estimate |
4,174.848 HK$ million | PDF p.1 printed 86 |
Investment Income ................................................................................................... 4,174,848 |
| CWRF donations and contributions 2025-26 · Revised estimate |
7.644 HK$ million | PDF p.1 printed 86 |
Donations and Contributions .................................................................................. 7,644 |
| CWRF other receipts 2025-26 · Revised estimate |
130.615 HK$ million | PDF p.1 printed 86 |
Others ........................................................................................................................ 130,615 |
| CWRF expenditure on Heads 701–711 ($m) 2025-26 · Revised estimate |
150,742 | PDF p.3 printed 88 |
150,742 156,356 |
| CWRF expenditure on Heads 701–711 ($m) 2026-27 · Estimate |
156,356 | PDF p.3 printed 88 |
150,742 156,356 |
| CWRF government bonds interest and other expenses ($m) 2025-26 · Revised estimate |
10,556 | PDF p.3 printed 88 |
Interest and other expenses 10,556 16,641 |
| CWRF government bonds interest and other expenses ($m) 2026-27 · Estimate |
16,641 | PDF p.3 printed 88 |
Interest and other expenses 10,556 16,641 |
Estimates for the year ending 31 March 2027 – Volume II: Loan Fund (12)
https://www.budget.gov.hk/2026/eng/pdf/loan.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Loan Fund loan repayments 2026-27 · Estimate |
2,982 HK$ million | PDF p.12 printed 143 |
Loan Repayments 701 3,508 667 1,360 2,705 2,982 |
| Loan Fund interest on loans 2026-27 · Estimate |
535 HK$ million | PDF p.12 printed 143 |
Interest on Loans 51 1,672 76 94 393 535 |
| Loan Fund surcharges on overdue loan repayments 2026-27 · Estimate |
6 HK$ million | PDF p.12 printed 143 |
Surcharges on Overdue Loan Repayments 3 5 4 6 6 6 |
| Loan Fund investment income 2026-27 · Estimate |
272 HK$ million | PDF p.12 printed 143 |
Investment Income 230* 372* 266 225 255 272 |
| Loan Fund investment income 2024-25 · Actual |
225 HK$ million | PDF p.12 printed 143 |
Investment Income 230* 372* 266 225 |
| Loan Fund loan repayments 2024-25 · Actual |
1,360 HK$ million | PDF p.12 printed 143 |
Loan Repayments 701 3,508 667 1,360 |
| Loan Fund interest on loans 2024-25 · Actual |
94 HK$ million | PDF p.12 printed 143 |
Interest on Loans 51 1,672 76 94 |
| Loan Fund surcharges on overdue loan repayments 2024-25 · Actual |
6 HK$ million | PDF p.12 printed 143 |
Surcharges on Overdue Loan Repayments 3 5 4 6 |
| Loan Fund investment income 2025-26 · Revised estimate |
255 HK$ million | PDF p.12 printed 143 |
Investment Income 230* 372* 266 225 255 |
| Loan Fund loan repayments 2025-26 · Revised estimate |
2,705 HK$ million | PDF p.12 printed 143 |
Loan Repayments 701 3,508 667 1,360 2,705 |
| Loan Fund interest on loans 2025-26 · Revised estimate |
393 HK$ million | PDF p.12 printed 143 |
Interest on Loans 51 1,672 76 94 393 |
| Loan Fund surcharges on overdue loan repayments 2025-26 · Revised estimate |
6 HK$ million | PDF p.12 printed 143 |
Surcharges on Overdue Loan Repayments 3 5 4 6 6 |
Estimates for the year ending 31 March 2027 – Volume II: Lotteries Fund (12)
https://www.budget.gov.hk/2026/eng/pdf/lotter.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Lotteries Fund – Mark Six Lottery 2026-27 · Estimate |
1,183 HK$ million | PDF p.62 printed 207 |
Mark Six Lottery 915 1,015 1,259 1,360 1,188 1,183 |
| Lotteries Fund – net proceeds of auctions of vehicle registration marks 2026-27 · Estimate |
50 HK$ million | PDF p.62 printed 207 |
Net Proceeds of Auctions of Vehicle Registration 37 40 85 58 49 50 |
| Lotteries Fund donations 2026-27 · Estimate |
12 HK$ million | PDF p.62 printed 207 |
Donations — 8 3 11 9 12 |
| Lotteries Fund investment income 2026-27 · Estimate |
1,107 HK$ million | PDF p.62 printed 207 |
Investment Income 1,708* 2,978* 853 862 1,041 1,107 |
| Lotteries Fund investment income 2024-25 · Actual |
862 HK$ million | PDF p.62 printed 207 |
Investment Income 1,708* 2,978* 853 862 |
| Lotteries Fund – Mark Six Lottery 2024-25 · Actual |
1,360 HK$ million | PDF p.62 printed 207 |
Mark Six Lottery 915 1,015 1,259 1,360 |
| Lotteries Fund – net proceeds of auctions of vehicle registration marks 2024-25 · Actual |
58 HK$ million | PDF p.62 printed 207 |
Net Proceeds of Auctions of Vehicle Registration 37 40 85 58 |
| Lotteries Fund donations 2024-25 · Actual |
11 HK$ million | PDF p.62 printed 207 |
Donations — 8 3 11 |
| Lotteries Fund investment income 2025-26 · Revised estimate |
1,041 HK$ million | PDF p.62 printed 207 |
Investment Income 1,708* 2,978* 853 862 1,041 |
| Lotteries Fund – Mark Six Lottery 2025-26 · Revised estimate |
1,188 HK$ million | PDF p.62 printed 207 |
Mark Six Lottery 915 1,015 1,259 1,360 1,188 |
| Lotteries Fund – net proceeds of auctions of vehicle registration marks 2025-26 · Revised estimate |
49 HK$ million | PDF p.62 printed 207 |
Net Proceeds of Auctions of Vehicle Registration 37 40 85 58 49 |
| Lotteries Fund donations 2025-26 · Revised estimate |
9 HK$ million | PDF p.62 printed 207 |
Donations — 8 3 11 9 |
Estimates for the year ending 31 March 2027 – Volume I – Head 72 — Independent Commission Against Corruption (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (12)
https://www.budget.gov.hk/2026/eng/pdf/head072.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Independent Commission Against Corruption — Programme (1) Corruption Prevention 2026-27 · Estimate |
98.3 | PDF p.10 printed 657 |
(1) Corruption Prevention ........................... 99.3 102.3 100.3 98.3 |
| Independent Commission Against Corruption — Programme (1) Corruption Prevention 2025-26 · Revised estimate |
100.3 | PDF p.10 printed 657 |
(1) Corruption Prevention ........................... 99.3 102.3 100.3 98.3 |
| Independent Commission Against Corruption — Programme (1) Corruption Prevention 2024-25 · Actual |
99.3 | PDF p.10 printed 657 |
(1) Corruption Prevention ........................... 99.3 102.3 100.3 98.3 |
| Independent Commission Against Corruption — Programme (2) Operations 2026-27 · Estimate |
1,108.7 | PDF p.10 printed 657 |
(2) Operations ............................................. 1,084.8 1,099.7 1,100.7 1,108.7 |
| Independent Commission Against Corruption — Programme (2) Operations 2025-26 · Revised estimate |
1,100.7 | PDF p.10 printed 657 |
(2) Operations ............................................. 1,084.8 1,099.7 1,100.7 1,108.7 |
| Independent Commission Against Corruption — Programme (2) Operations 2024-25 · Actual |
1,084.8 | PDF p.10 printed 657 |
(2) Operations ............................................. 1,084.8 1,099.7 1,100.7 1,108.7 |
| Independent Commission Against Corruption — Programme (3) Preventive Education 2026-27 · Estimate |
98.0 | PDF p.10 printed 657 |
(3) Preventive Education ............................ 104.4 97.7 98.2 98.0 |
| Independent Commission Against Corruption — Programme (3) Preventive Education 2025-26 · Revised estimate |
98.2 | PDF p.10 printed 657 |
(3) Preventive Education ............................ 104.4 97.7 98.2 98.0 |
| Independent Commission Against Corruption — Programme (3) Preventive Education 2024-25 · Actual |
104.4 | PDF p.10 printed 657 |
(3) Preventive Education ............................ 104.4 97.7 98.2 98.0 |
| Independent Commission Against Corruption — Programme (4) Enlisting Support 2026-27 · Estimate |
108.0 | PDF p.10 printed 657 |
(4) Enlisting Support................................... 104.4 97.7 98.2 108.0 |
| Independent Commission Against Corruption — Programme (4) Enlisting Support 2025-26 · Revised estimate |
98.2 | PDF p.10 printed 657 |
(4) Enlisting Support................................... 104.4 97.7 98.2 108.0 |
| Independent Commission Against Corruption — Programme (4) Enlisting Support 2024-25 · Actual |
104.4 | PDF p.10 printed 657 |
(4) Enlisting Support................................... 104.4 97.7 98.2 108.0 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 708 — Capital Subventions and Major Systems and Equipment (10)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-08.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 8013MD: Redevelopment of Kwong Wah Hospital, phase 2—main works 2026-27 · Estimate |
1,600,000 | PDF p.3 printed 62 |
8013MD Redevelopment of Kwong Wah Hospital, phase 2—main works ..... 8,900,400 433,027 800,000 1,600,000 |
| CWRF 8004MJ: Expansion of United Christian Hospital—main works (superstructure and refurbishment works) 2026-27 · Estimate |
1,500,000 | PDF p.3 printed 62 |
8004MJ Expansion of United Christian Hospital—main works (superstructure and refurbishment works) ............................................ 16,214,100 6,066,538 2,350,000 1,500,000 |
| CWRF 8013MD: approved project estimate — Redevelopment of Kwong Wah Hospital, phase 2—main works 2026-27 · Estimate |
8,900,400 | PDF p.3 printed 62 |
8013MD Redevelopment of Kwong Wah Hospital, phase 2—main works ..... 8,900,400 433,027 800,000 1,600,000 |
| CWRF 8004MJ: approved project estimate — Expansion of United Christian Hospital—main works (superstructure and refurbishment works) 2026-27 · Estimate |
16,214,100 | PDF p.3 printed 62 |
8004MJ Expansion of United Christian Hospital—main works (superstructure and refurbishment works) ............................................ 16,214,100 6,066,538 2,350,000 1,500,000 |
| Head 708 — Capital Subventions: Medical Subventions (sub-total, Hospital Authority projects) 2026-27 · Estimate |
7,926,200 | PDF p.4 printed 63 |
Sub-total.................................... 83,988,200 35,018,963 9,063,890 7,926,200 |
| Head 708 — Capital Subventions: Medical Subventions (sub-total, Hospital Authority projects) 2025-26 · Revised estimate |
9,063,890 | PDF p.4 printed 63 |
Sub-total.................................... 83,988,200 35,018,963 9,063,890 7,926,200 |
| CWRF 8003MP: Redevelopment of Grantham Hospital, phase 1—main works 2026-27 · Estimate |
1,483,000 | PDF p.4 printed 63 |
8003MP Redevelopment of Grantham Hospital, phase 1—main works ..... 9,933,900 1,038,779 2,509,600 1,483,000 |
| CWRF 8096MM: Provision of funding to the Hospital Authority for Minor Works Projects 2026-27 · Estimate |
1,780,000 | PDF p.4 printed 63 |
8096MM Provision of funding to the Hospital Authority for Minor Works Projects .......................................... 8,000,000 1,010,000 1,748,490 1,780,000 |
| CWRF 8096MM: approved project estimate — Provision of funding to the Hospital Authority for Minor Works Projects 2026-27 · Estimate |
8,000,000 | PDF p.4 printed 63 |
8096MM Provision of funding to the Hospital Authority for Minor Works Projects .......................................... 8,000,000 1,010,000 1,748,490 1,780,000 |
| CWRF 8003MP: approved project estimate — Redevelopment of Grantham Hospital, phase 1—main works 2026-27 · Estimate |
9,933,900 | PDF p.4 printed 63 |
8003MP Redevelopment of Grantham Hospital, phase 1—main works ..... 9,933,900 1,038,779 2,509,600 1,483,000 |
Estimates for the year ending 31 March 2027 – Volume II: Capital Investment Fund (9)
https://www.budget.gov.hk/2026/eng/pdf/cif.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CIF loan repayments 2026-27 · Estimate |
198 HK$ million | PDF p.9 printed 98 |
Loan Repayments 102 — — 701 312 198 |
| CIF dividends, interest and other receipts from investments/loans 2026-27 · Estimate |
685 HK$ million | PDF p.9 printed 98 |
Dividends, Interest and Other Receipts from 44 424 479 731 864 685 |
| CIF investment income 2026-27 · Estimate |
522 HK$ million | PDF p.9 printed 98 |
Investment Income 970* 1,298* 671 526 539 522 |
| CIF investment income 2024-25 · Actual |
526 HK$ million | PDF p.9 printed 98 |
Investment Income 970* 1,298* 671 526 |
| CIF loan repayments 2024-25 · Actual |
701 HK$ million | PDF p.9 printed 98 |
Loan Repayments 102 — — 701 |
| CIF dividends, interest and other receipts from investments/loans 2024-25 · Actual |
731 HK$ million | PDF p.9 printed 98 |
Dividends, Interest and Other Receipts from 44 424 479 731 |
| CIF investment income 2025-26 · Revised estimate |
539 HK$ million | PDF p.9 printed 98 |
Investment Income 970* 1,298* 671 526 539 |
| CIF loan repayments 2025-26 · Revised estimate |
312 HK$ million | PDF p.9 printed 98 |
Loan Repayments 102 — — 701 312 |
| CIF dividends, interest and other receipts from investments/loans 2025-26 · Revised estimate |
864 HK$ million | PDF p.9 printed 98 |
Dividends, Interest and Other Receipts from 44 424 479 731 864 |
Estimates for the year ending 31 March 2027 – Volume I – Head 45 — Fire Services Department (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (9)
https://www.budget.gov.hk/2026/eng/pdf/head045.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Fire Services Department — Programme (1) Fire Service 2026-27 · Estimate |
5,352.7 | PDF p.8 printed 236 |
(1) Fire Service .................................................. 5,648.8 5,436.7 5,428.6 5,352.7 |
| Fire Services Department — Programme (1) Fire Service 2025-26 · Revised estimate |
5,428.6 | PDF p.8 printed 236 |
(1) Fire Service .................................................. 5,648.8 5,436.7 5,428.6 5,352.7 |
| Fire Services Department — Programme (1) Fire Service 2024-25 · Actual |
5,648.8 | PDF p.8 printed 236 |
(1) Fire Service .................................................. 5,648.8 5,436.7 5,428.6 5,352.7 |
| Fire Services Department — Programme (2) Fire Protection and Prevention 2026-27 · Estimate |
1,064.7 | PDF p.8 printed 236 |
(2) Fire Protection and Prevention .................... 927.4 927.6 902.9 1,064.7 |
| Fire Services Department — Programme (2) Fire Protection and Prevention 2025-26 · Revised estimate |
902.9 | PDF p.8 printed 236 |
(2) Fire Protection and Prevention .................... 927.4 927.6 902.9 1,064.7 |
| Fire Services Department — Programme (2) Fire Protection and Prevention 2024-25 · Actual |
927.4 | PDF p.8 printed 236 |
(2) Fire Protection and Prevention .................... 927.4 927.6 902.9 1,064.7 |
| Fire Services Department — Programme (3) Ambulance Service 2026-27 · Estimate |
2,965.1 | PDF p.8 printed 236 |
(3) Ambulance Service ...................................... 2,824.9 2,887.7 2,661.9 2,965.1 |
| Fire Services Department — Programme (3) Ambulance Service 2025-26 · Revised estimate |
2,661.9 | PDF p.8 printed 236 |
(3) Ambulance Service ...................................... 2,824.9 2,887.7 2,661.9 2,965.1 |
| Fire Services Department — Programme (3) Ambulance Service 2024-25 · Actual |
2,824.9 | PDF p.8 printed 236 |
(3) Ambulance Service ...................................... 2,824.9 2,887.7 2,661.9 2,965.1 |
Press release (30 April 2026): Government's provisional financial results for year ended March 31, 2026 (8)
https://www.info.gov.hk/gia/general/202604/30/P2026043000508.htm
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Land premium: provisional outturn above the 2025-26 revised estimate by 2025-26 · Actual |
1.1 HK$ billion | web page printed Press release text |
land premium (HK$1.1 billion) |
| Fiscal reserves at 31 March 2025-26 · Actual |
665,540.6 HK$ million | web page printed TABLE 2. FISCAL RESERVES (PROVISIONAL) – Year ended March 31, 2026 |
665,540.6 |
| Government revenue (consolidated) 2025-26 · Actual |
697,468.5 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
697,468.5 |
| Government expenditure (consolidated) 2025-26 · Actual |
790,330.2 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
(790,330.2) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2025-26 · Actual |
−92,861.7 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
(92,861.7) |
| Proceeds from issuance of government bonds 2025-26 · Actual |
156,036.4 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
156,036.4 |
| Repayment of government bonds (principal) 2025-26 · Actual |
51,950.9 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
(51,950.9) |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2025-26 · Actual |
11,223.8 HK$ million | web page printed TABLE 1. CONSOLIDATED ACCOUNT (PROVISIONAL) – Year ended March 31, 2026 |
11,223.8 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 706 — Highways (8)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-06.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Head 706 Highways — Transport—Railways (sub-total) 2026-27 · Estimate |
696,544 | PDF p.2 printed 48 |
Sub-total ............................................... 183,420,600 172,528,938 765,256 696,544 |
| Head 706 Highways — Transport—Railways (sub-total) 2025-26 · Revised estimate |
765,256 | PDF p.2 printed 48 |
Sub-total ............................................... 183,420,600 172,528,938 765,256 696,544 |
| CWRF 6061TR: Shatin to Central Link—construction of railway works—remaining works 2026-27 · Estimate |
432,542 | PDF p.2 printed 48 |
6061TR Shatin to Central Link—construction of railway works—remaining works ........................................................ 74,130,100 66,402,786 505,537 432,542 |
| CWRF 6061TR: approved project estimate — Shatin to Central Link—construction of railway works—remaining works 2026-27 · Estimate |
74,130,100 | PDF p.2 printed 48 |
6061TR Shatin to Central Link—construction of railway works—remaining works ........................................................ 74,130,100 66,402,786 505,537 432,542 |
| CWRF 6461TH: Central Kowloon Route— main works 2026-27 · Estimate |
2,059,597 | PDF p.3 printed 49 |
6461TH Central Kowloon Route— main works ............................................... 42,363,900 28,077,317 4,677,241 2,059,597 |
| CWRF 6461TH: approved project estimate — Central Kowloon Route— main works 2026-27 · Estimate |
42,363,900 | PDF p.3 printed 49 |
6461TH Central Kowloon Route— main works ............................................... 42,363,900 28,077,317 4,677,241 2,059,597 |
| Head 706 Highways — Transport—Roads (sub-total) 2026-27 · Estimate |
4,015,628 | PDF p.4 printed 50 |
Sub-total ............................................... 164,492,300 134,479,103 6,351,999 4,015,628 |
| Head 706 Highways — Transport—Roads (sub-total) 2025-26 · Revised estimate |
6,351,999 | PDF p.4 printed 50 |
Sub-total ............................................... 164,492,300 134,479,103 6,351,999 4,015,628 |
Accounts of the Government for the year ended 31 March 2025 (Cash-based) – Consolidated Account (7)
https://www.try.gov.hk/internet/pde_cbac2425_ca25.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Fiscal reserves at 31 March (consolidated fund balance) 2024-25 · Actual |
654,316.795 HK$ million | PDF p.1 printed 6 |
Balance at end of year 12, 13, 14 654,316,795 |
| Government revenue (consolidated) 2024-25 · Actual |
564,908.934 HK$ million | PDF p.2 printed 7 |
Revenue 15, 16 564,908,934 |
| Proceeds from issuance of government bonds 2024-25 · Actual |
130,036.024 HK$ million | PDF p.2 printed 7 |
Proceeds received from issuance of Government Bonds 130,036,024 |
| Government expenditure (consolidated) 2024-25 · Actual |
753,220.615 HK$ million | PDF p.2 printed 7 |
Expenditure 15, 17 (753,220,615) |
| Consolidated surplus/(deficit) before issuance and repayment of government bonds 2024-25 · Actual |
−188,311.681 HK$ million | PDF p.2 printed 7 |
Deficit for the year before issuance and repayment 18 (188,311,681) |
| Repayment of government bonds 2024-25 · Actual |
21,992.988 HK$ million | PDF p.2 printed 7 |
Repayment of Government Bonds (21,992,988) |
| Consolidated surplus/(deficit) after issuance and repayment of government bonds 2024-25 · Actual |
−80,268.645 HK$ million | PDF p.2 printed 7 |
Deficit for the year after issuance and repayment 18 (80,268,645) |
Estimates for the year ending 31 March 2027 – Volume II: Land Fund (6)
https://www.budget.gov.hk/2026/eng/pdf/land.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Land Fund dividends, interest and other receipts from investments/loans 2026-27 · Estimate |
21 HK$ million | PDF p.6 printed 129 |
Dividends, Interest and Other Receipts from — — 2,229†§ 1,825†§ 56§ 21§ |
| Land Fund investment income (incl. Future Fund returns brought back) 2026-27 · Estimate |
20,000 HK$ million | PDF p.6 printed 129 |
Investment Income 37,677@~ 48,388@~ 57,000~ 31,000~ 18,500~ 20,000~ |
| Land Fund investment income (incl. Future Fund returns brought back) 2024-25 · Actual |
31,000 HK$ million | PDF p.6 printed 129 |
Investment Income 37,677@~ 48,388@~ 57,000~ 31,000~ |
| Land Fund dividends, interest and other receipts from investments/loans 2024-25 · Actual |
1,825 HK$ million | PDF p.6 printed 129 |
Dividends, Interest and Other Receipts from — — 2,229†§ 1,825†§ |
| Land Fund investment income (incl. Future Fund returns brought back) 2025-26 · Revised estimate |
18,500 HK$ million | PDF p.6 printed 129 |
Investment Income 37,677@~ 48,388@~ 57,000~ 31,000~ 18,500~ |
| Land Fund dividends, interest and other receipts from investments/loans 2025-26 · Revised estimate |
56 HK$ million | PDF p.6 printed 129 |
Dividends, Interest and Other Receipts from — — 2,229†§ 1,825†§ 56§ |
Estimates for the year ending 31 March 2027 – Volume I – Head 21 — Chief Executive’s Office (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (6)
https://www.budget.gov.hk/2026/eng/pdf/head021.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Chief Executive’s Office — Programme (1) Chief Executive’s Office 2026-27 · Estimate |
125.6 | PDF p.2 printed 34 |
(1) Chief Executive’s Office ............................. 117.4 126.9 126.6 125.6 |
| Chief Executive’s Office — Programme (1) Chief Executive’s Office 2025-26 · Revised estimate |
126.6 | PDF p.2 printed 34 |
(1) Chief Executive’s Office ............................. 117.4 126.9 126.6 125.6 |
| Chief Executive’s Office — Programme (1) Chief Executive’s Office 2024-25 · Actual |
117.4 | PDF p.2 printed 34 |
(1) Chief Executive’s Office ............................. 117.4 126.9 126.6 125.6 |
| Chief Executive’s Office — Programme (2) Executive Council 2026-27 · Estimate |
29.8 | PDF p.2 printed 34 |
(2) Executive Council........................................ 29.4 30.2 29.9 29.8 |
| Chief Executive’s Office — Programme (2) Executive Council 2025-26 · Revised estimate |
29.9 | PDF p.2 printed 34 |
(2) Executive Council........................................ 29.4 30.2 29.9 29.8 |
| Chief Executive’s Office — Programme (2) Executive Council 2024-25 · Actual |
29.4 | PDF p.2 printed 34 |
(2) Executive Council........................................ 29.4 30.2 29.9 29.8 |
Estimates for the year ending 31 March 2027 – Volume I – Head 30 — Correctional Services Department (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (6)
https://www.budget.gov.hk/2026/eng/pdf/head030.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Correctional Services Department — Programme (1) Prison Management 2026-27 · Estimate |
4,286.9 | PDF p.4 printed 136 |
(1) Prison Management ..................................... 4,154.9 4,242.5 4,211.6 4,286.9 |
| Correctional Services Department — Programme (1) Prison Management 2025-26 · Revised estimate |
4,211.6 | PDF p.4 printed 136 |
(1) Prison Management ..................................... 4,154.9 4,242.5 4,211.6 4,286.9 |
| Correctional Services Department — Programme (1) Prison Management 2024-25 · Actual |
4,154.9 | PDF p.4 printed 136 |
(1) Prison Management ..................................... 4,154.9 4,242.5 4,211.6 4,286.9 |
| Correctional Services Department — Programme (2) Re-integration 2026-27 · Estimate |
1,189.0 | PDF p.4 printed 136 |
(2) Re-integration .............................................. 1,248.9 1,246.0 1,195.7 1,189.0 |
| Correctional Services Department — Programme (2) Re-integration 2025-26 · Revised estimate |
1,195.7 | PDF p.4 printed 136 |
(2) Re-integration .............................................. 1,248.9 1,246.0 1,195.7 1,189.0 |
| Correctional Services Department — Programme (2) Re-integration 2024-25 · Actual |
1,248.9 | PDF p.4 printed 136 |
(2) Re-integration .............................................. 1,248.9 1,246.0 1,195.7 1,189.0 |
Estimates for the year ending 31 March 2027 – Volume I – Head 190 — University Grants Committee (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (6)
https://www.budget.gov.hk/2026/eng/pdf/head190.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| University Grants Committee — Programme (1) University Grants Committee 2026-27 · Estimate |
24,446.6 | PDF p.7 printed 957 |
University Grants Committee ............................... 24,475.9 24,699.7 24,560.8 24,446.6 |
| University Grants Committee — Programme (1) University Grants Committee 2025-26 · Revised estimate |
24,560.8 | PDF p.7 printed 957 |
University Grants Committee ............................... 24,475.9 24,699.7 24,560.8 24,446.6 |
| University Grants Committee — Programme (1) University Grants Committee 2024-25 · Actual |
24,475.9 | PDF p.7 printed 957 |
University Grants Committee ............................... 24,475.9 24,699.7 24,560.8 24,446.6 |
| University Grants Committee — Subhead 000 (recurrent grants to UGC-funded universities and UGC Secretariat) 2024-25 · Actual |
24,222,996 | PDF p.9 printed 959 |
000 Operational expenses .......................................... 24,222,996 24,309,692 24,250,813 23,956,603 |
| University Grants Committee — Subhead 000 (recurrent grants to UGC-funded universities and UGC Secretariat) 2025-26 · Revised estimate |
24,250,813 | PDF p.9 printed 959 |
000 Operational expenses .......................................... 24,222,996 24,309,692 24,250,813 23,956,603 |
| University Grants Committee — Subhead 000 (recurrent grants to UGC-funded universities and UGC Secretariat) 2026-27 · Estimate |
23,956,603 | PDF p.9 printed 959 |
000 Operational expenses .......................................... 24,222,996 24,309,692 24,250,813 23,956,603 |
Estimates for the year ending 31 March 2027 – Volume II: Disaster Relief Fund (5)
https://www.budget.gov.hk/2026/eng/pdf/disast.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| DRF investment income 2026-27 · Estimate |
9 HK$ million | PDF p.6 printed 113 |
Investment Income 5^ 6^ 3 5 7 9 |
| DRF investment income 2024-25 · Actual |
5 HK$ million | PDF p.6 printed 113 |
Investment Income 5^ 6^ 3 5 |
| DRF refund of grants 2024-25 · Actual |
7 HK$ million | PDF p.6 printed 113 |
Refund of Grants 1 2 —# 7 |
| DRF investment income 2025-26 · Revised estimate |
7 HK$ million | PDF p.6 printed 113 |
Investment Income 5^ 6^ 3 5 7 |
| DRF refund of grants 2025-26 · Revised estimate |
4 HK$ million | PDF p.6 printed 113 |
Refund of Grants 1 2 —# 7 4 |
Estimates for the year ending 31 March 2027 – Volume II: Innovation and Technology Fund (5)
https://www.budget.gov.hk/2026/eng/pdf/itf.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| ITF investment income 2026-27 · Estimate |
734 HK$ million | PDF p.6 printed 121 |
Investment Income 1,224β 1,650β 1,065 984 869 734 |
| ITF investment income 2024-25 · Actual |
984 HK$ million | PDF p.6 printed 121 |
Investment Income 1,224β 1,650β 1,065 984 |
| ITF refund of grants 2024-25 · Actual |
61 HK$ million | PDF p.6 printed 121 |
Refund of Grants 64 83 69 61 |
| ITF investment income 2025-26 · Revised estimate |
869 HK$ million | PDF p.6 printed 121 |
Investment Income 1,224β 1,650β 1,065 984 869 |
| ITF refund of grants 2025-26 · Revised estimate |
58 HK$ million | PDF p.6 printed 121 |
Refund of Grants 64 83 69 61 58 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 711 — Housing (4)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-11.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF B001HL: Implementation of Light Public Housing—the Second Batch of Projects 2026-27 · Estimate |
1,496,700 | PDF p.1 printed 80 |
B001HL Implementation of Light Public Housing—the Second Batch of Projects .......................................................... 9,837,400 718,495 3,702,700 1,496,700 |
| CWRF B001HL: approved project estimate — Implementation of Light Public Housing—the Second Batch of Projects 2026-27 · Estimate |
9,837,400 | PDF p.1 printed 80 |
B001HL Implementation of Light Public Housing—the Second Batch of Projects .......................................................... 9,837,400 718,495 3,702,700 1,496,700 |
| Head 711 Housing — Light Public Housing (sub-total) 2026-27 · Estimate |
1,796,700 | PDF p.2 printed 81 |
Sub-total ..............................................24,749,300 4,241,244 7,836,700 1,796,700 |
| Head 711 Housing — Light Public Housing (sub-total) 2025-26 · Revised estimate |
7,836,700 | PDF p.2 printed 81 |
Sub-total ..............................................24,749,300 4,241,244 7,836,700 1,796,700 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 709 — Waterworks (4)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-09.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 9181WF: In-situ reprovisioning of Sha Tin water treatment works (South Works)—main works 2026-27 · Estimate |
1,103,252 | PDF p.1 printed 72 |
9181WF In-situ reprovisioning of Sha Tin water treatment works (South Works)—main works............................... 7,019,900 3,512,974 1,221,674 1,103,252 |
| CWRF 9181WF: approved project estimate — In-situ reprovisioning of Sha Tin water treatment works (South Works)—main works 2026-27 · Estimate |
7,019,900 | PDF p.1 printed 72 |
9181WF In-situ reprovisioning of Sha Tin water treatment works (South Works)—main works............................... 7,019,900 3,512,974 1,221,674 1,103,252 |
| CWRF 9382WF: Ngau Tam Mei water treatment works extension—main works— package one 2026-27 · Estimate |
1,511,914 | PDF p.2 printed 73 |
9382WF Ngau Tam Mei water treatment works extension—main works— package one ............................................. 9,608,500 — 257,327 1,511,914 |
| CWRF 9382WF: approved project estimate — Ngau Tam Mei water treatment works extension—main works— package one 2026-27 · Estimate |
9,608,500 | PDF p.2 printed 73 |
9382WF Ngau Tam Mei water treatment works extension—main works— package one ............................................. 9,608,500 — 257,327 1,511,914 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 705 — Civil Engineering (4)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-05.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 5192DR: West New Territories landfill extension 2026-27 · Estimate |
3,605,881 | PDF p.2 printed 43 |
5192DR West New Territories landfill extension ..................................................44,277,800 1,326,396 3,616,222 3,605,881 |
| CWRF 5177DR: Integrated waste management facilities phase 1 2026-27 · Estimate |
1,871,328 | PDF p.2 printed 43 |
5177DR Integrated waste management facilities phase 1 ......................................19,203,700 13,286,659 1,999,340 1,871,328 |
| CWRF 5192DR: approved project estimate — West New Territories landfill extension 2026-27 · Estimate |
44,277,800 | PDF p.2 printed 43 |
5192DR West New Territories landfill extension ..................................................44,277,800 1,326,396 3,616,222 3,605,881 |
| CWRF 5177DR: approved project estimate — Integrated waste management facilities phase 1 2026-27 · Estimate |
19,203,700 | PDF p.2 printed 43 |
5177DR Integrated waste management facilities phase 1 ......................................19,203,700 13,286,659 1,999,340 1,871,328 |
MPFA: Mandatory Contributions – Employees (3)
https://www.mpfa.org.hk/en/mpf-system/mandatory-contributions/employees
| Figure | As printed | Page | Quote |
|---|---|---|---|
| MPF mandatory employee contribution rate (of relevant income) 2026 · Actual |
5 % | web page printed How to calculate contributions? |
Employees and employers are both required to make mandatory contributions of 5% of the employee’s relevant income into the employee’s MPF account, subject to the minimum and maximum relevant income levels. |
| MPF minimum relevant income level (monthly-paid employees) – employee contributes nothing below this 2026 · Actual |
7,100 HK$ | web page printed How to calculate contributions? |
For monthly paid employees, the current minimum and maximum relevant income levels are $7,100 and $30,000 respectively. |
| MPF maximum relevant income level (monthly-paid employees) 2026 · Actual |
30,000 HK$ | web page printed How to calculate contributions? |
For monthly paid employees, the current minimum and maximum relevant income levels are $7,100 and $30,000 respectively. |
Rating and Valuation Department: Progressive Rating System for Domestic Tenements (3)
https://www.rvd.gov.hk/en/progressive_rating_system.html
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Domestic progressive rates – first tier rateable value band (charged at 5%) 2026-27 · Actual |
550,000 HK$ | web page printed Progressive Rating System for Domestic Tenements |
For domestic tenements with rateable value of $550,000 or below (about 98% of private domestic tenements), the rates percentage charge remains at 5%. |
| Domestic progressive rates – rate on next $250,000 of rateable value 2026-27 · Actual |
8 % | web page printed Progressive Rating System for Domestic Tenements (table) |
First $550,000 5% Next $250,000 8% Remainder 12% |
| Domestic progressive rates – rate on rateable value above $800,000 2026-27 · Actual |
12 % | web page printed Progressive Rating System for Domestic Tenements (table) |
First $550,000 5% Next $250,000 8% Remainder 12% |
Estimates for the year ending 31 March 2027 – Volume II: Civil Service Pension Reserve Fund (3)
https://www.budget.gov.hk/2026/eng/pdf/csprf.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CSPRF investment income 2026-27 · Estimate |
2,903 HK$ million | PDF p.4 printed 105 |
Investment Income 3,022* 5,051* 1,993 2,072 2,549 2,903 |
| CSPRF investment income 2024-25 · Actual |
2,072 HK$ million | PDF p.4 printed 105 |
Investment Income 3,022* 5,051* 1,993 2,072 |
| CSPRF investment income 2025-26 · Revised estimate |
2,549 HK$ million | PDF p.4 printed 105 |
Investment Income 3,022* 5,051* 1,993 2,072 2,549 |
Accounts of the Government for the year ended 31 March 2025 (Cash-based) – Capital Works Reserve Fund (3)
https://www.try.gov.hk/internet/pde_cbac2425_cwrf25.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Land premium 2024-25 · Actual |
13,601.748 HK$ million | PDF p.9 printed 48 |
33,000,000 13,601,748 |
| CWRF investment income 2024-25 · Actual |
3,639.948 HK$ million | PDF p.9 printed 48 |
4,296,000 3,639,948 |
| CWRF other receipts (donations, contributions and others) 2024-25 · Actual |
86.327 HK$ million | PDF p.9 printed 48 |
7,956 86,327 |
Estimates for the year ending 31 March 2027 – Volume I – General Revenue Account: Summary (3)
https://www.budget.gov.hk/2026/eng/pdf/sum_p_e.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| GRA total expenditure 2026-27 · Estimate |
648,408 | PDF p.4 printed 21 |
Total Expenditure 597,021 100 697,780 100 608,744 100 604,834 100 609,334 100 648,408 100 |
| GRA total expenditure 2024-25 · Actual |
604,834 | PDF p.4 printed 21 |
Total Expenditure 597,021 100 697,780 100 608,744 100 604,834 100 609,334 100 648,408 100 |
| GRA total expenditure 2025-26 · Revised estimate |
609,334 | PDF p.4 printed 21 |
Total Expenditure 597,021 100 697,780 100 608,744 100 604,834 100 609,334 100 648,408 100 |
Estimates for the year ending 31 March 2027 – Volume I – Head 106 — Miscellaneous Services (Controlling Officer’s Report, Details of Expenditure by Subhead, Commitments) (2)
https://www.budget.gov.hk/2026/eng/pdf/head106.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Miscellaneous Services — Subhead 251 Additional commitments (recurrent; central provision for initiatives under planning) 2026-27 · Estimate |
5,695,350 | PDF p.2 printed 806 |
251 Additional commitments ..................................... — 1,317,211 — 5,695,350 |
| Miscellaneous Services — Subhead 789 Additional commitments (non-recurrent) 2026-27 · Estimate |
393,469 | PDF p.2 printed 806 |
789 Additional commitments ..................................... — 30,659 — 393,469 |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 701 — Land Acquisition (2)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-01.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 1100CA: Compensation and ex-gratia allowances in respect of projects in the Public Works Programme 2026-27 · Estimate |
19,908,070 | PDF p.1 printed 21 |
1100CA Compensation and ex-gratia allowances in respect of projects in the Public Works Programme ................... — — 20,031,450 19,908,070 ¶ |
| CWRF 1100CA: Compensation and ex-gratia allowances in respect of projects in the Public Works Programme 2025-26 · Revised estimate |
20,031,450 | PDF p.1 printed 21 |
1100CA Compensation and ex-gratia allowances in respect of projects in the Public Works Programme ................... — — 20,031,450 19,908,070 ¶ |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 704 — Drainage (2)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-04.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF 4399DS: Relocation of Sha Tin Sewage Treatment Works to caverns— remaining works 2026-27 · Estimate |
1,307,833 | PDF p.2 printed 37 |
4399DS Relocation of Sha Tin Sewage Treatment Works to caverns— remaining works .......................................12,930,400 — 141,765 1,307,833 |
| CWRF 4399DS: approved project estimate — Relocation of Sha Tin Sewage Treatment Works to caverns— remaining works 2026-27 · Estimate |
12,930,400 | PDF p.2 printed 37 |
4399DS Relocation of Sha Tin Sewage Treatment Works to caverns— remaining works .......................................12,930,400 — 141,765 1,307,833 |
Examination of Estimates of Expenditure 2026-27, Controlling Officer's Reply FSTB(Tsy)096 (Head 76 IRD) (1)
https://www.ird.gov.hk/eng/pdf/2026/fstb_096.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Individuals with salaries income but not required to pay salaries tax after deductions and allowances (YA2023/24) YA2023/24 · Statistic |
908,000 | PDF p.4 printed FSTB(Tsy)096 p4 |
2023/24 908 000 337 000 37.1% |
Rating and Valuation Department: Rates (1)
https://www.rvd.gov.hk/en/our_services/rates.html
| Figure | As printed | Page | Quote |
|---|---|---|---|
| Rates percentage charge (non-domestic; domestic with rateable value ≤ $550,000) 2026-27 · Actual |
5 % | web page printed Valuation Reference Date and Rates Percentage Charge – For the Financial Year 2026-27 |
For domestic tenements, the rates percentage charge for those with rateable value of $550,000 or below is 5%. |
Estimates for the year ending 31 March 2027 – Volume II – Capital Works Reserve Fund: Head 710 — Computerisation (1)
https://www.budget.gov.hk/2026/eng/pdf/cwrf-10.pdf
| Figure | As printed | Page | Quote |
|---|---|---|---|
| CWRF A148YU: Development of the Territory-wide Closed-circuit Television System under the “SmartView” programme 2026-27 · Estimate |
909,901 | PDF p.3 printed 77 |
A148YU Development of the Territory-wide Closed-circuit Television System under the “SmartView” programme .............. — — — 909,901† |